BLD-Final | 9/13/2006 | 9/14/2006 | 9/14/2006 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/14/2006 | 9/14/2006 | 9/14/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 9/13/2006 | 9/13/2006 | 9/14/2006 | P | CANC |
Mike Jordan
|
|
|
tana; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | PASS |
Mike Jordan
|
|
|
tana; Phone #: ###-#### Internet Inspection Request from: Letitia Mes. All framing issues have been resolved.
|
BLD-Energy code compliance | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | PASS |
Mike Jordan
|
|
|
tana; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 3/14/2006 | 3/15/2006 | 3/15/2006 | A | FAIL |
Mike Jordan
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Provide approved pl;ans to cimplete framing insp. Header required over closet door upstairs bedroom. 2X6 tall wall spacing required to be 8 inch oc per engineering. Provide solid blocking at all piont loads and at rim joist at 3 ply girder in garage. ok to insul. c/n posted.
|
BLD-Framing/Rough-in | 3/7/2006 | 3/8/2006 | 3/8/2006 | P | FAIL |
Dave Hannah
|
|
|
jon stinchcomb; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs mec permit and rough in ispections on mec and fire place no inspection done
|
BLD-Footing | 11/29/2005 | 11/30/2005 | 11/30/2005 | P | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Footings have been excavated to correct depth.
|
BLD-Footing | 11/15/2005 | 11/16/2005 | 11/16/2005 | P | FAIL |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Excavation is to shallow, footings wiil not be the required 24 in below grade for frost line.
|
Issue PAID IN FULL permit | | | 11/15/2005 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 10/19/2005 | 10/19/2005 | 10/19/2005 | | PASS |
|
|
|
10/19/2005 14:17:11 SRZ - activity updated through activity BLDA022 from case BLD05-02450.
|
Plan assigned to (SAM) | 9/2/2005 | 9/2/2005 | 10/19/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/19/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2005 | | DONE |
|
|
|
ONE SET RED-LINED.
|
Permit Ready to Issue | | | 10/19/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/19/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 10/14/2005 | | 10/19/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/13/2005 | | 10/14/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 9/2/2005 | | 9/13/2005 | | PASS |
|
|
|
approved with R-1C setbacks per Scott Spjute
|
Application received | | | 9/2/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | | | | | |
|
|
|
|