Fee Review-notes | 9/2/2005 | 9/2/2005 | 2/6/2007 | | DONE |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/31/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 11/17/2006 | 11/17/2006 | 12/27/2006 | | DONE |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PASS |
Jim Sly
|
|
|
|
(F) Reprint permit | | | 9/19/2006 | | |
|
|
|
|
FIRE-Final Inspection | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 7/5/2006 | 7/6/2006 | 7/6/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the curbing has been painted for the fire dept. access.
|
BLD-Final | 6/19/2006 | 6/20/2006 | 6/20/2006 | A | NR |
Jim Sly
|
|
|
Phone #: Dana ###-####
|
BLD-Energy code compliance | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Jim Sly
|
|
|
dana; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 4/19/2006 | 4/20/2006 | 4/20/2006 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/19/2006 at 1:36:34 PM. Contact: ###-####. Just need to check lateral bracing for trusses restrained min. 1 end. and complete draftstop at W. end soffit.
|
BLD-Framing/Rough-in | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | PART |
Dave Hannah
|
|
|
Dana -- shear insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong letter from engineer oking sw2 sear panel as is ok to cover ext will add sheet rock shear to inside
|
BLD-Other | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | PART |
Jim Sly
|
|
|
danna - Note: shear ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Shear......OK except SW2 wall.......Need letter from Eng or nail 10d at 2/12
|
BLD-Foundation | 1/27/2006 | 1/30/2006 | 1/30/2006 | A | PASS |
Jim Sly
|
|
|
west; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 1/25/2006 | 1/26/2006 | 1/26/2006 | A | PASS |
Jim Sly
|
|
|
wes ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Called Eng....2500 psi design on Conc.
|
(F) Reprint permit | | | 1/6/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/5/2006 | | |
|
|
|
|
Telephone call | | | 12/7/2005 | | DONE |
|
|
|
called ###-#### and told her permit is ready and fees and need ACHD
|
Routing - FIRE | 11/21/2005 | | 12/5/2005 | | PASS |
|
|
|
Resub approved with conditions; faxed to architect.
|
Routing - PLAN CHECK | 12/5/2005 | | 12/5/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/5/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/5/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 9/8/2005 | | 12/5/2005 | | PASS |
|
|
|
12/5/2005 11:53:21 JCM - activity updated through activity BLDA022 from case BLD05-02452.
|
Routing - PLANNING | 11/17/2005 | | 11/21/2005 | | PASS |
|
|
|
Approved per all conditions of DRH05-00194 and as noted on the landscape plan.
|
Routing - PLAN CHECK | 10/19/2005 | | 11/17/2005 | | |
|
|
|
|
Plan resubmittals received | | | 11/16/2005 | | |
|
|
|
Received (2) copies of sheet E2.0L and E3.0. Routed to John M.
|
Plan resubmittals requested | | | 11/14/2005 | | DONE |
|
|
|
E-mailed the engineer requesting signed and dated revised electrical plans. JCM
|
Plan Reviewer's activity | | | 11/14/2005 | | PASS |
|
|
|
Reviewed and approved resubmitted plans sheets for structural and nonstructural revisions. JCM
|
Plan resubmittals received | | | 11/10/2005 | | DONE |
|
|
|
Received 2 review comments,2 landscape plans & 2 copys of sheets AD1,A-2,A-3,A-5,A-6,A-7,M-1,M-2,E2.0L, E3.0 Taken to John M.
|
1st review completed | | | 10/19/2005 | | FAIL |
|
|
|
failed planning, plan check, structural and fire.
|
Routing - FIRE | 10/3/2005 | | 10/19/2005 | | FAIL |
|
|
|
called architect left voicemail, revisions required per intake meeting not resubmitted. CE, Adam with Alliance , called and I explained the req'ts to him and faxed the review to him as well as to the architect.
|
Plan resubmittals received | | | 10/12/2005 | | DONE |
|
|
|
Received 3 Response to comments, & 3 Copys of sheets A-0,A-3,A-6 Taken to John M.
|
Routing - PLAN CHECK | 9/30/2005 | | 10/3/2005 | | FAIL |
|
|
|
|
Routing - PLANNING | 9/27/2005 | | 9/30/2005 | | FAIL |
|
|
|
Parking spaces at the northwest area of parking lot do not comply with dimensional criteria. Landscape plan has not been submitted to Design Review staff for review and approval.
|
Routing - PLUMBING | 9/15/2005 | | 9/27/2005 | | PASS |
|
|
|
per4 plans and 2003 upc. max hot water to public lavs is 120 deg.
|
Plan resubmittals requested | | | 9/26/2005 | | DONE |
|
|
|
E-mailed the project engineer a copy of the plan review comment list requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 9/8/2005 | | 9/22/2005 | | FAIL |
|
|
|
Routed to AHJ Engineering - Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 9/22/2005 | | DONE |
|
|
|
Faxed the project engineer a copy of the structural comment list requesting revisions. JCM
|
Routing - Erosion and Sediment | 9/14/2005 | | 9/15/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 9/8/2005 | | 9/14/2005 | | PASS |
|
|
|
|
Pending Assignment by MYS | 9/2/2005 | | 9/8/2005 | | DONE |
|
|
|
9/8/2005 08:26:31 JCM - activity updated through activity BLDA166 from case BLD05-02452.
|
Plans ACCEPTED BY PLAN TECH | | | 9/8/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/8/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 9/8/2005 | | 9/8/2005 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/2/2005 | | |
|
|
|
|
Application received | | | 9/2/2005 | | |
|
|
|
|