BLD-Final | 11/28/2006 | 11/28/2006 | 11/28/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 6:33:09 AM. Contact: ###-####.
|
DOC - Permit Finaled | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 7/25/2006 | 7/26/2006 | 7/26/2006 | A | PASS |
Dave Hannah
|
|
|
randon; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover
|
BLD-Framing/Rough-in | 7/18/2006 | 7/19/2006 | 7/19/2006 | A | FAIL |
Dave Hannah
|
|
|
randon; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to insulate still need two ply trusses installed or somrthing from truss engineer
|
BLD-Framing/Rough-in | 7/13/2006 | 7/14/2006 | 7/14/2006 | A | FAIL |
Dave Hannah
|
|
|
randan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs seal package fire blocking and truss ingeneering for two ply trusses
|
BLD-Foundation | 3/21/2006 | 3/22/2006 | 3/22/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/21/2006 at 10:59:45 AM. Contact: ###-####. wip.
|
BLD-Footing | 3/21/2006 | 3/21/2006 | 3/21/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/21/2006 at 10:59:14 AM. Contact: ###-####.
|
Override - People Holds | | | 2/14/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/14/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2005 | | DONE |
|
|
|
called ###-#### and told her permit is ready, she said someone is coming today to pick up
|
Routing - PLAN CHECK | 9/12/2005 | | 9/30/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 9/30/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/30/2005 | | DONE |
|
|
|
Called Rob Blanc (designer) he is to resubmit drawings showing wall bracing and proper REScheck 9/30/2005 10:15 a.m. pep
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 9/30/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 9/2/2005 | 9/2/2005 | 9/26/2005 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 9/12/2005 | | 9/12/2005 | | PASS |
|
|
|
|
Routing - PLANNING | | | 9/12/2005 | | PASS |
|
|
|
This is a substandard lot, so it qualiifes for reduced setbacks of 15 ft. front, 15 ft. rear, 15 ft. side on street, and 5 ft on interior side. Section 11-04-04.03 allows the reduced setbacks, and it also allows up to 3 feet enchroachment for balconies, porches, bay window, etc.
|
Application received | | | 9/2/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 9/6/2005 | | | | PASS |
|
|
|
New tax parcel number is R2039252358.
|
Plan assigned to (DJO) | 9/26/2005 | | | | PEND |
|
|
|
|