Permit Information
Permit NumberBLD05-02475
StatusFinaled
Name ESSE BABY
Site Address 872 W BROAD ST
Project NameBODO BLDG #4
Customer Number 
ePlanReviewNo
Description
(ESSE BABY - 1ST STORY) This building is fire sprinklered for area increase. To create a 1,720 square foot retail sales tenant space on the 1st story of BODO Building #4. Work is to include a restroom accessible to the disabled, interior nonbearing walls, and finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/14/20066/14/20068/16/2006 DONE
Second Notice has not been responded to.
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 4/26/20065/25/2006 DONE
BLD-Final4/26/20064/26/20064/26/2006PPASS
DetailsDave Hannah
Please call Alex at ###-#### ok for perm occ
FIRE-Final Inspection4/26/20064/26/20064/26/2006PPASS
DetailsForrest France
Related permits have been finaled, fire life safety finaled.
Permanent Occupancy 4/26/20064/26/2006 DONE
Details
Permanent occupancy  4/26/2006 DONE
Perm. Occ. Cert. # 11000 issues 4-26-06 to Esse Baby in the BODO Bldg. #4.
BLD-Final4/24/20064/24/20064/25/2006PNR
DetailsDave Hannah
Please check with Forrest prior to arrival. This is 1 of 5 to be signed-off later today. Please call Paul if there is a problem. Thanks.
FIRE-Final Inspection4/24/20064/24/20064/24/2006PFAIL
DetailsForrest France
The project related sprinkler permit needs to be called for final.
BLD-Other2/9/20062/9/20062/9/2006 DONE
Temp. Occ. Cert. # 5324 extended for 90 days per Jenifer until 5-29-06.
BLD-Final11/23/200511/28/200511/28/2005APART
DetailsDave Hannah
I would like to have the inspection after Forest signs off. Not sure when fForest will be here...early AM. Thanks. Internet Inspection Request from: Alex Monge ok for temp occ needs ada counter top and water cooler
FIRE-Final Inspection11/23/200511/28/200511/28/2005APART
DetailsForrest France
Fire life safety is acceptable, final pending shell permit finals.
Temporary occupancy  11/28/2005 DONE
Temp. Occ. Cert. # 5324 issued 11-28-05 to Essse Baby on the 1st floor of BODO, Bldg. #4.
FIRE-Final Inspection11/21/200511/21/200511/21/2005PNR
DetailsForrest France
The related fire sprinkler permit is not issued at this time.
FIRE-Final Inspection11/18/200511/18/200511/18/2005PNR
DetailsForrest France
No life safety inspection until fire sprinkler permit has been issued and approved.
BLD-Final11/18/200511/18/200511/18/2005PFAIL
DetailsJim Storey
Internet Inspection Request from: Alex Monge ada protection/ clean exit path.
BLD-Final11/16/200511/17/200511/17/2005ANR
DetailsJim Storey
Internet Inspection Request from: Alex Monge check all permits isued for final insp. approval before requisting final.
FIRE-Final Inspection11/16/200511/17/200511/17/2005ANR
DetailsForrest France
Need fire alarm and fire sprinkler permits inspected and approved prior to life safety final.
BLD-Framing/Rough-in10/25/200510/26/200510/26/2005APASS
DetailsDave Hannah
Internet Inspection Request from: Alex Monge ok to cover
BLD-Wall cover10/20/200510/21/200510/24/2005APART
DetailsDave Hannah
Rough framing for Esse Baby. After Tully's and Enzler's. Internet Inspection Request from: Alex Monge framing ok but still needs elec r/i be for cover
Routing - PLAN CHECK10/6/2005 10/7/2005 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  10/7/2005 DONE
Inspection Record Card- Bld  10/7/2005 DONE
Print Occupancy Form  10/7/2005 DONE
Permit Ready to Issue  10/7/2005 DONE
Telephone call  10/7/2005 DONE
called alex ###-#### and wes ###-#### and told both of them that permit is ready and fees
Issue PAID IN FULL permit  10/7/2005 DONE
Plan assigned to (CJW)9/9/2005 10/7/2005 PASS
10/7/2005 09:56:15 CJW - activity updated through activity BLDA022 from case BLD05-02475.
Routing - FIRE9/21/2005 10/6/2005 PASS
1st review completed  10/6/2005 FAIL
Failed plan check.
Plan resubmittals received  9/28/2005  
Received (2) copies of sheet A2.1 and A8.1. Also received (2) sets of structural calcs. Routed to Carl W.
Routing - PLAN CHECK9/12/2005 9/21/2005 FAIL
The IBC plan review was started on September 20, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS9/9/2005 9/12/2005 PASS
Plans ACCEPTED BY PLAN TECH  9/8/2005  
Application received  9/6/2005  
Recd Pcfee & Taken To Pln CK  9/6/2005  
Fee Review-notes9/6/20059/6/2005