Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-02476
StatusFinaled
Name FUNKTION
Site Address 860 W BROAD ST
Project NameBODO BLDG #4
Customer Number 
ePlanReviewNo
Description
(FUNKTION - BODO BLDG #4 - 1ST STORY) This building is fire sprinklered for area increase. To create a 1,720 square foot retail sales tenant space on the 1st story of BODO Building #4. Work is to include a restroom accessible to the disabled, interior nonbearing walls, and finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/23/2007  
Third Notice BLD6/14/20066/14/20068/15/2006 DONE
Second Notice has not been responded to.
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 4/26/20065/25/2006 DONE
BLD-Final4/26/20064/26/20064/26/2006PPASS
DetailsDave Hannah
Please call Alex at ###-####. ok for perm occ
FIRE-Final Inspection4/26/20064/26/20064/26/2006PPASS
DetailsForrest France
Fire life safety finaled.
Permanent Occupancy 4/26/20064/26/2006 DONE
Details
Permanent occupancy  4/26/2006 DONE
Perm. Occ. Cert. # 11001 issued 4-26-06 to Funktion in the BODO Bldg. #4.
BLD-Final4/24/20064/24/20064/25/2006PNR
DetailsDave Hannah
Please check with Forrest prior to arrival. This is 1 of 5 to be signed-off later today. Please call Paul if there is a problem. Thanks.
FIRE-Final Inspection4/24/20064/24/20064/24/2006PFAIL
DetailsForrest France
The project related sprinkler permit must be finaled first.
BLD-Other2/9/20062/9/20062/9/2006 DONE
Temp. Occ. Cert. # 5317 extened for 90 days per Jenifer until 5-23-06.
BLD-Final11/22/200511/23/200511/23/2005APART
DetailsDave Hannah
Please call when you arrive. Internet Inspection Request from: Alex Monge ok for temp occ ok for perm after others and shell gos perm
FIRE-Final Inspection11/23/200511/23/200511/23/2005APART
DetailsForrest France
Fire life safety is acceptable, final pending shell permit finals for alarm and sprinkler.
Temporary occupancy  11/23/2005 DONE
Temp. Occ. Cert. # 5317 issued 11-23-05 to Funkton on the 1st floor of BODO, Bldg. #4.
FIRE-Final Inspection11/21/200511/21/200511/21/2005PNR
DetailsForrest France
The related fire sprinkler permit is not issued at this time.
FIRE-Final Inspection11/16/200511/18/200511/18/2005ANR
DetailsForrest France
Not ready for life safety inspection, the related fire alarm and sprinkler permits must be inspected and approved prior to final. The related sprinkler permit has not been issued at this time.
BLD-Final11/16/200511/18/200511/18/2005AFAIL
DetailsJim Storey
Internet Inspection Request from: Alex Monge fire alarm plans ready for pick up and sprinkler plan still under review, needs all other trade final insp. no insp performed no contact number prvided to call .
BLD-Framing/Rough-in10/25/200510/26/200510/28/2005ANR
DetailsDave Hannah
Internet Inspection Request from: Alex Monge
BLD-Wall cover10/20/200510/21/200510/24/2005ANR
DetailsDave Hannah
Rough framing for Funktion. After Tully's and Enzler's. Internet Inspection Request from: Alex Monge needs other trades r/i s
Issue PAID IN FULL permit  10/17/2005 DONE
Routing - PLAN CHECK10/12/2005 10/14/2005 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  10/14/2005 DONE
Inspection Record Card- Bld  10/14/2005 DONE
Print Occupancy Form  10/14/2005 DONE
Permit Ready to Issue  10/14/2005 DONE
Telephone call  10/14/2005 DONE
called ###-#### and told Alex that permit is ready and did not want to know fees
Plan assigned to (CJW)9/12/2005 10/14/2005 PASS
10/14/2005 08:41:35 CJW - activity updated through activity BLDA022 from case BLD05-02476.
Routing - FIRE9/21/2005 10/12/2005 PASS
review faxed to architect.
1st review completed  10/12/2005 FAIL
failed plan check.
Plan resubmittals received  9/28/2005  
Received (2) copies of sheet A2.1. Routed to Carl W.
Routing - PLAN CHECK9/13/2005 9/21/2005 FAIL
The IBC plan review was started on September 21, 2005 and was finished the same day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS9/12/2005 9/13/2005 PASS
Plans ACCEPTED BY PLAN TECH  9/9/2005  
Application received  9/6/2005  
Recd Pcfee & Taken To Pln CK  9/6/2005  
Fee Review-notes9/6/20059/6/2005