Case Summary (BLD) | | | 4/23/2007 | | |
|
|
|
|
Third Notice BLD | 6/14/2006 | 6/14/2006 | 8/15/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/25/2006 | 5/25/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/26/2006 | 5/25/2006 | | DONE |
|
|
|
|
BLD-Final | 4/26/2006 | 4/26/2006 | 4/26/2006 | P | PASS |
Dave Hannah
|
|
|
Please call Alex at ###-####. ok for perm occ
|
FIRE-Final Inspection | 4/26/2006 | 4/26/2006 | 4/26/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Permanent Occupancy | | 4/26/2006 | 4/26/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/26/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11001 issued 4-26-06 to Funktion in the BODO Bldg. #4.
|
BLD-Final | 4/24/2006 | 4/24/2006 | 4/25/2006 | P | NR |
Dave Hannah
|
|
|
Please check with Forrest prior to arrival. This is 1 of 5 to be signed-off later today. Please call Paul if there is a problem. Thanks.
|
FIRE-Final Inspection | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | FAIL |
Forrest France
|
|
|
The project related sprinkler permit must be finaled first.
|
BLD-Other | 2/9/2006 | 2/9/2006 | 2/9/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5317 extened for 90 days per Jenifer until 5-23-06.
|
BLD-Final | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | PART |
Dave Hannah
|
|
|
Please call when you arrive. Internet Inspection Request from: Alex Monge ok for temp occ ok for perm after others and shell gos perm
|
FIRE-Final Inspection | 11/23/2005 | 11/23/2005 | 11/23/2005 | A | PART |
Forrest France
|
|
|
Fire life safety is acceptable, final pending shell permit finals for alarm and sprinkler.
|
Temporary occupancy | | | 11/23/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5317 issued 11-23-05 to Funkton on the 1st floor of BODO, Bldg. #4.
|
FIRE-Final Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | NR |
Forrest France
|
|
|
The related fire sprinkler permit is not issued at this time.
|
FIRE-Final Inspection | 11/16/2005 | 11/18/2005 | 11/18/2005 | A | NR |
Forrest France
|
|
|
Not ready for life safety inspection, the related fire alarm and sprinkler permits must be inspected and approved prior to final. The related sprinkler permit has not been issued at this time.
|
BLD-Final | 11/16/2005 | 11/18/2005 | 11/18/2005 | A | FAIL |
Jim Storey
|
|
|
Internet Inspection Request from: Alex Monge fire alarm plans ready for pick up and sprinkler plan still under review, needs all other trade final insp. no insp performed no contact number prvided to call .
|
BLD-Framing/Rough-in | 10/25/2005 | 10/26/2005 | 10/28/2005 | A | NR |
Dave Hannah
|
|
|
Internet Inspection Request from: Alex Monge
|
BLD-Wall cover | 10/20/2005 | 10/21/2005 | 10/24/2005 | A | NR |
Dave Hannah
|
|
|
Rough framing for Funktion. After Tully's and Enzler's. Internet Inspection Request from: Alex Monge needs other trades r/i s
|
Issue PAID IN FULL permit | | | 10/17/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/12/2005 | | 10/14/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/14/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/14/2005 | | DONE |
|
|
|
called ###-#### and told Alex that permit is ready and did not want to know fees
|
Plan assigned to (CJW) | 9/12/2005 | | 10/14/2005 | | PASS |
|
|
|
10/14/2005 08:41:35 CJW - activity updated through activity BLDA022 from case BLD05-02476.
|
Routing - FIRE | 9/21/2005 | | 10/12/2005 | | PASS |
|
|
|
review faxed to architect.
|
1st review completed | | | 10/12/2005 | | FAIL |
|
|
|
failed plan check.
|
Plan resubmittals received | | | 9/28/2005 | | |
|
|
|
Received (2) copies of sheet A2.1. Routed to Carl W.
|
Routing - PLAN CHECK | 9/13/2005 | | 9/21/2005 | | FAIL |
|
|
|
The IBC plan review was started on September 21, 2005 and was finished the same day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 9/12/2005 | | 9/13/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/9/2005 | | |
|
|
|
|
Application received | | | 9/6/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/6/2005 | | |
|
|
|
|
Fee Review-notes | 9/6/2005 | 9/6/2005 | | | |
|
|
|
|