Fee Review-notes | 9/6/2005 | 9/6/2005 | 8/17/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/14/2005 | | 8/17/2007 | | PASS |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 4/23/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 4/10/2007 | | DONE |
|
|
|
call to hammersmark re cert of fv, left msg to call us back on their ans mach.
|
Second Notice BLD | 9/25/2006 | 9/25/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/8/2006 | 9/25/2006 | | DONE |
|
|
|
|
BLD-Final | 8/7/2006 | 8/8/2006 | 8/8/2006 | A | PART |
Dave Hannah
|
|
|
Rory; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt still ok for temp but needs plumbing to go perm occ
|
Permanent Occupancy | | 8/8/2006 | 8/8/2006 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 8/8/2006 | | DONE |
|
|
|
Perm. Occ. Cer6t. # 11164 issued 8-8-06 to Blackfin Technology in the old King Bldg.
|
Code Occupancy Approval | 8/7/2006 | 8/7/2006 | 8/7/2006 | P | DONE |
Wm. Michael Meloy
|
|
|
Inspection at 14:00 found that compliance was met per the approved set of plans.
|
BLD-Final | 6/9/2006 | 6/12/2006 | 6/12/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/9/2006 at 3:38:13 PM. Contact: ###-####. ok for temp occ ok for perm occ after code pnf go perm
|
BLD-Final | 5/10/2006 | 5/11/2006 | 5/11/2006 | P | NR |
Dave Hannah
|
|
|
richard; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs plz sign off on elec final
|
FIRE-Final Inspection | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | PASS |
Forrest France
|
|
|
Items on correction notice have been completed, door hardware at the patio exit verified for compliance, life safety inspection passed.
|
FIRE-Final Inspection | 5/5/2006 | 5/8/2006 | 5/8/2006 | A | FAIL |
Forrest France
|
|
|
Need to provide a fire extinguisher with current tag for the basement, repair the exit sign 2nd floor stairs, provide permanent address numbers, missing door and hardware at the patio enclosure exit.
|
BLD-Conference | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | PASS |
Dave Hannah
|
|
|
richard Note: after 10:00 for conference; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 5/2/2006 | 5/3/2006 | 5/3/2006 | A | PASS |
Dave Hannah
|
|
|
###-#### - richard
|
FIRE-Final Inspection | 4/28/2006 | 4/28/2006 | 4/28/2006 | P | FAIL |
Forrest France
|
|
|
Project is not in condition for a final life safety inspection, missing doors, hardware, need to provide approved building address, stair hand rails are not installed, need to test emergency lighting etc.
|
BLD-Final | 4/27/2006 | 4/28/2006 | 4/28/2006 | P | NR |
Tony Young
|
|
|
###-####
|
BLD-Conference | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | PASS |
Dave Hannah
|
|
|
Rory; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 3/16/2006 | 3/20/2006 | 3/20/2006 | A | PASS |
Dave Hannah
|
|
|
Richard; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to cover ground floor
|
BLD-Framing/Rough-in | 3/6/2006 | 3/6/2006 | 3/6/2006 | P | PART |
Dave Hannah
|
|
|
Richard -- partial on 2nd floor for cover; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong 2nd floor framing ok to cover
|
BLD-Aging Inspection | 2/14/2006 | 2/14/2006 | 2/15/2006 | | PASS |
Dave Hannah
|
|
|
|
Print Occupancy Form | | | 11/15/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/15/2005 | | DONE |
|
|
|
called ###-#### and left voicemessage for John Day that permit is ready and fees
|
Issue PAID IN FULL permit | | | 11/15/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2005 | | DONE |
|
|
|
|
Routing - PLANNING | 11/9/2005 | | 11/14/2005 | | PASS |
|
|
|
Approved per CZC05-00172 and as noted. Note on plan states: Occupancy not allowed until setback for stair is resolved (pending variance) and documentation for required parking for office provided (14 car parks); Planning Staff will have 15 days (standard administrative review time frame) to review parking documentation
|
Plan assigned to (CJW) | 9/15/2005 | | 11/14/2005 | | PASS |
|
|
|
11/14/2005 14:11:43 CJW - activity updated through activity BLDA022 from case BLD05-02482.
|
Routing - PLAN CHECK | 10/30/2005 | | 11/9/2005 | | PASS |
|
|
|
Drawings approved after resubittal review.
|
Plan resubmittals received | | | 11/9/2005 | | DONE |
|
|
|
Received 1 letter of transmittal , 2 copys of sheets A2.01, 2- cover sheets taken to Carl W.
|
Routing - PLANNING | 10/28/2005 | | 10/30/2005 | | FAIL |
|
|
|
Proposed stair complies with CZC05-00172 conditions; however, tenant improvement requires a separate approval per CZC05-00172 condition #5.
|
Routing - PUBLIC WORKS | 10/28/2005 | | 10/28/2005 | | PASS |
|
|
|
Re-evaluated for sewer fees. Removed a shower and added a mop sink.
|
Routing - PLAN CHECK | 10/17/2005 | | 10/28/2005 | | FAIL |
|
|
|
Failed 2nd review. Sent back to PW for new sewer fees calculation.
|
Plan resubmittals received | | | 10/26/2005 | | DONE |
|
|
|
Received 1 letter of transmittal , 1 letter, & 2 copys of sheets A1.00,A2.00,A2.01,A3.01,A4.01,A4.02,A4.03,A5.01,A6.01,A8.01,A8.02 taken to Carl W.
|
Routing - FIRE | 9/29/2005 | | 10/17/2005 | | PASS |
|
|
|
approved subject to comments conditioned on required IBC resubmittals.
|
1st review completed | | | 10/17/2005 | | FAIL |
|
|
|
failed planning and plan check.
|
Routing - PLAN CHECK | 9/21/2005 | | 9/29/2005 | | FAIL |
|
|
|
The IBC plan review report was started on September 23, 2005 and was finished on September 29, 2005. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 9/19/2005 | | 9/21/2005 | | FAIL |
|
|
|
Plans do not comply with conditions of CZC05-00172.
|
Routing - Erosion and Sediment | 9/16/2005 | | 9/19/2005 | | PASS |
|
|
|
ESC plan waiver approved with attached conditions.
|
Routing - PUBLIC WORKS | 9/15/2005 | | 9/16/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/13/2005 | | |
|
|
|
|
Application received | | | 9/6/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/6/2005 | | DONE |
|
|
|
|