Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/29/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/8/2006 | 12/27/2006 | | DONE |
|
|
|
|
BLD-Aging Inspection | 11/30/2006 | 11/30/2006 | 11/30/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/26/2006 | 9/26/2006 | 9/26/2006 | | PASS |
Tom Arcoraci
|
|
|
on temp
|
BLD-Aging Inspection | 7/27/2006 | 7/27/2006 | 7/27/2006 | | PASS |
Tom Arcoraci
|
|
|
on temp occ
|
BLD-Aging Inspection | 4/12/2006 | 4/12/2006 | 4/12/2006 | | PASS |
Tom Arcoraci
|
|
|
|
Temporary occupancy | | | 2/13/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5368 issued 2-13-06 to Boise Orthodontics.
|
Permanent occupancy | | | 2/13/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10902 issued 2-13-06 to Boise Orthodonitics.
|
BLD-Final | 2/9/2006 | 2/10/2006 | 2/10/2006 | P | PASS |
Tom Arcoraci
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
|
FIRE-Final Inspection | 2/9/2006 | 2/10/2006 | 2/10/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled. Locksmith was on the way to remove the thumbturns
|
Permanent Occupancy | | 2/9/2006 | 2/9/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/2/2006 | 2/3/2006 | 2/3/2006 | A | FAIL |
Troy Cobbley
|
|
|
Mount fire extinguisher as discussed in the first floor tenant and provide an additional fire extinguisher in the basement lobby. The two exterior lobby exits are allowed to have the keyed hardware, indicators and stickers. All of the other doors for the new tenant as shown on theplans are required to have approved hardware such as lever, pad or crash bar.
|
BLD-Final | 2/2/2006 | 2/3/2006 | 2/3/2006 | P | CANC |
Tom Arcoraci
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa//Cancel per Matt (RASchultz) 2-3-06 eus
|
Third Notice BLD | 12/28/2005 | 12/28/2005 | 1/13/2006 | | DONE |
|
|
|
just started the project per Randy////1/13/06 BAS
|
Second Notice BLD | 12/5/2005 | 12/5/2005 | 12/28/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
BLD-Framing/Rough-in | 12/8/2005 | 12/9/2005 | 12/9/2005 | A | PASS |
Tom Arcoraci
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
First Notice | 11/15/2005 | 11/15/2005 | 12/5/2005 | | DONE |
Tom Arcoraci
|
|
|
|
FIRE-Conference | 11/30/2005 | 11/30/2005 | 12/2/2005 | P | DONE |
Forrest France
|
|
|
Discussed exit signage, emergency lighting, and pocket door hardware requirements on site.
|
CHANGE STATUS TO (ISS) | | | 11/30/2005 | | DONE |
|
|
|
per tom a. ok to reopen permit-customer needed to have a conf
|
BLD-Conference | 11/15/2005 | 11/15/2005 | 11/15/2005 | P | PASS |
Tom Arcoraci
|
|
|
discussed handrails
|
BLD-Conference | 11/14/2005 | 11/15/2005 | 11/15/2005 | A | CANC |
Tom Arcoraci
|
|
|
on hand rails please///matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 11/15/2005 | 11/15/2005 | 11/15/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 11/2/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/19/2005 | | 10/20/2005 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/20/2005 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/20/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/20/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/20/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/20/2005 | | DONE |
|
|
|
called ###-#### and told Matt permit is ready and fees
|
Plan assigned to (JCB) | 9/15/2005 | | 10/20/2005 | | PASS |
|
|
|
10/20/2005 08:28:48 JCB - activity updated through activity BLDA022 from case BLD05-02498.
|
Routing - FIRE | 10/3/2005 | | 10/19/2005 | | PASS |
|
|
|
|
Routing - PLUMBING | 10/19/2005 | | 10/19/2005 | | PASS |
|
|
|
note 17 page A5.0- provide a floor sink for the vacuum pump discharge.
|
1st review completed | | | 10/19/2005 | | FAIL |
|
|
|
failed plumbing
|
Plan resubmittals received | | | 10/4/2005 | | |
|
|
|
Received Transmittal & 2 Copys of sheet A5.0 Taken to Jason B.
|
Telephone call | | | 10/3/2005 | | DONE |
|
|
|
Received phone message from architect stating there is no medical gas in this tenant space.
|
Routing - PLAN CHECK | 9/27/2005 | | 10/3/2005 | | PEND |
|
|
|
Plan review e-mailed and faxed to architect. No response required. A few items have been red-lined on plans for clarification. When plans are approved by Plumbing Division and Fire Department the permit can be issued. Plans to now route to the Fire Department.
|
Routing - PLUMBING | 9/20/2005 | | 9/27/2005 | | FAIL |
|
|
|
verify that a pump will be required for the S-9 in the basement prior to installing the pump. verify size of existing water system so it wont be overloaded. provide dental air, vacuum, and gas plans.
|
Routing - PUBLIC WORKS | 9/15/2005 | | 9/20/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2005 | | |
|
|
|
|
Application received | | | 9/8/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/8/2005 | | |
|
|
|
|
Fee Review-notes | 9/8/2005 | 9/8/2005 | | | |
|
|
|
|