Third Notice BLD | 6/14/2006 | 6/14/2006 | 7/27/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/14/2006 | 4/14/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/21/2006 | 4/14/2006 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/21/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10943 issued 3-21-06 to Americana Occupational Health.
|
BLD-Final | 3/6/2006 | 3/7/2006 | 3/7/2006 | P | PASS |
Dave Hannah
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok for perm occ
|
FIRE-Final Inspection | 3/6/2006 | 3/7/2006 | 3/7/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Permanent Occupancy | | 3/7/2006 | 3/7/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/6/2006 | 3/6/2006 | 3/6/2006 | P | DEFR |
Forrest France
|
|
|
Inspection to be completed 3/7 per phone conversation with contractor.
|
FIRE-Final Inspection | 3/6/2006 | 3/6/2006 | 3/6/2006 | A | CANC |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Framing/Rough-in | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PART |
Dave Hannah
|
|
|
Ron -- for ceiling cover; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to cover ceiling
|
BLD-Framing/Rough-in | 12/20/2005 | 12/21/2005 | 12/21/2005 | A | PASS |
Dave Hannah
|
|
|
ron Note: please call 15 min prior inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Issue & PRINT to be Invoiced | | | 11/3/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/31/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/31/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/31/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/31/2005 | | DONE |
|
|
|
left mess for kevin at ###-#### that permit is ready
|
Telephone call | | | 10/31/2005 | | DONE |
|
|
|
talked to gregg ostrow at ###-#### is ready
|
Routing - Erosion and Sediment | 10/27/2005 | | 10/28/2005 | | PASS |
|
|
|
ESC plan waiver request approved with attached conditions.
|
Routing - PLAN CHECK | 10/28/2005 | | 10/28/2005 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2005 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 9/15/2005 | | 10/28/2005 | | PASS |
|
|
|
10/28/2005 09:10:32 JCB - activity updated through activity BLDA022 from case BLD05-02536.
|
Routing - FIRE | 10/14/2005 | | 10/27/2005 | | PASS |
|
|
|
|
1st review completed | | | 10/27/2005 | | FAIL |
|
|
|
failed ESC
|
Routing - PLAN CHECK | 10/27/2005 | | 10/27/2005 | | PEND |
|
|
|
Received ESC Application and waiver letter. Will attach to plans and forward to ESC Division for approval. When approved by the ESC Division permit can be issued.
|
Telephone call | | | 10/27/2005 | | DONE |
|
|
|
Contacted St. Lukes Construction division to let them know a completed ESC Application and waiver letter are still needed for Erosion/Sediment Control approval. They stated that these would be delivered later this morning.
|
Plan resubmittals received | | | 10/27/2005 | | DONE |
|
|
|
Received ESC Application and waiver letter. Will attach to plans and forward to ESC Division for approval.
|
Routing - PLAN CHECK | 9/27/2005 | | 10/14/2005 | | PEND |
|
|
|
Plan review report e-mailed and faxed to architect. No response required. A few items have been red-lined on plans for clarification. Plans to route to the Fire Department for review. When plans are approved by the Erosion/Sediment Control Division and the Fire Department the permit can be issued.
|
Plan resubmittals received | | | 10/14/2005 | | DONE |
|
|
|
Addendum One received via e-mail in pdf format from architect. Will attach to plans and red-line original sheet.
|
Telephone call | | | 10/10/2005 | | DONE |
|
|
|
Talked with John Maulin concerning two minor issues to address. He stated he would be faxing over the information today.
|
Telephone call | | | 10/7/2005 | | DONE |
|
|
|
Called architect concerning clarification on a few minor items. She said should would address and get back to me. Small addendum by fax o.k.
|
Telephone call | | | 10/6/2005 | | DONE |
|
|
|
Called mechanical engineer to fax over HVAC heating and cooling load calculations. These were provided same day.
|
Telephone call | | | 10/5/2005 | | DONE |
|
|
|
Called electrical engineer concerning additional dual level switching required in the space, an updated Lighting COMcheck required, and exterior emergency lighting required just outside of exit doors. He acknowledged requirements and submitted small addendum sheets.
|
Routing - Erosion and Sediment | 10/5/2005 | | 10/5/2005 | | FAIL |
|
|
|
Talked with Steve Webb and an Erosion/Sediment Control Permit is required. Erosion/Sediment Control Application and Waiver Letter to be submitted. Will let applicant know.
|
Telephone call | | | 10/4/2005 | | DONE |
|
|
|
Called Gregg Ostrow to let him know that an Erosion/Sediment Control Permit is required. A completed application and a waiver letter are to be submitted.
|
Routing - PLUMBING | 9/19/2005 | | 9/27/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 9/15/2005 | | 9/19/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2005 | | |
|
|
|
|
Application received | | | 9/9/2005 | | |
|
|
|
|
Fee Review-notes | 9/9/2005 | 9/9/2005 | | | |
|
|
|
|