Permit Information
Permit NumberBLD05-02539
StatusFinaled
Name WRIGHT BROTHERS, THE BLDG CO
Site Address 11818 W JOPLIN RD
Project NameWEST BOISE WWTP
Customer Number 
ePlanReviewNo
Description
(WEST BOISE WWTP - OFFICE & EDUCATION FACILITY) (3/14/08 Plan Modification submitted for minor changes to include but not be limited to underground plumbing rerouting and the waterless urinals added (previously approved on plans by Lee), a new heat pump added, a rooftop mechanical unit relocated, electrical low voltage lighting added, revised energy compliance sheets for electrical and mechanical, interior nonbearing wall around the theater was changed from a 90 degree angle to a curve, an added sheet to show a beam change over the exhibit area (which was left out of the previous plan modification), minor interior finish changes, added details on counters (which can be reviewed and approved on site for accessibility compliance), minor site changes and some basic plan clarifications.) (5/15/07 Plan Modification submitted to remove the above ground construction of the observation tower and pour foundation only at this time.) To construct a 9,155 sq. ft. one story Type IIB, fully fire sprinkled exhibit hall with offices. This building is designed for unseparated uses and the building is to be fully fire sprinklered. Occupant load signage to be posted in Theater (85 persons); in the Interp/Lobby (148 persons); and in Gallery (42 persons) -see ltr. approved by G. Slane 12/7/07 attached to documents. Other work includes all site improvements, paving and landscaping per approved plans, CUP04-00137. (mlo)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20089/4/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 4/28/20088/11/2008 DONE
Code Occupancy Approval4/28/20083/28/20084/28/2008PPASS
DetailsCarol Montgomery
Everything has been completed per the plans signed and approved and on site. Compliance Met. Closed.
Permanent Occupancy UNPAID FEE  4/28/2008 DONE
FIRE-Conference4/25/20084/25/20084/25/2008PPASS
DetailsTroy Cobbley
Life safety passed.
Override - Parcel Holds  4/8/2008  
Override - Parcel Holds  4/8/2008  
Override - Parcel Holds  4/8/2008  
Temporary Occupancy UNPAID FEE  4/8/2008 DONE
BLD-Final4/2/20084/3/20084/3/2008PPASS
DetailsJim Sly
mike Phone #: ###-####
OK for Perm Occ.
BLD-Final3/24/20083/25/20083/25/2008PNR
DetailsJim Sly
jade - ###-####
Talked to Jade......Can't final until plumb finals. ACHD?
FIRE-Final Inspection3/24/20083/24/20083/24/2008PPART
DetailsTroy Cobbley
A temporary occupancy was given, with dave hannimans permission, until the fire lane to the northwest has been completed. All other items are passed.
CHANGE STATUS TO (ISS)  3/24/2008 DONE
Plan resubmittals requested  3/19/2008  
Received 2 copies of C3.0 & C4.0 and given to Brian Murphy///3-19-08 BAS
Plan assigned to (MYS)3/17/2008 3/18/2008 PASS
DetailsMarlene Southard
Plan modification changes submitted on 3/13/08. Review approved and plans taken to permit desk on 3/18/08. Total fee to be 4 hours @ $46.31 per hour (3 hours for plumbing review and 1 hour for admin & plan check).
Routing - PLUMBING3/17/2008 3/18/2008 PASS
DetailsBill VanDegrift
PLAN MODIFICATION received 3/14/08. Plan review comments: reduced pressure backflow assembly required on the potable water premise protection, DC-1. all piping under future tower building must be of material approved for within buildings. detail of stornwater P-trap is attached to page C3.0 and is part of these approved drawings.
Routing - PLAN CHECK3/18/2008 3/18/2008 PASS
DetailsMarlene Southard
PLAN MODIFICATION. Minor modifications such as but not limited to: Underground plumbing rerouting and the waterless urinals added (previously approved on plans by Lee), a new heat pump added, a rooftop mechanical unit relocated, electrical low voltage lighting added, revised energy compliance sheets for electrical and mechanical, interior nonbearing wall around the theater was changed from a 90 degree angle to a curve, an added sheet to show a beam change over the exhibit area (which was left out of the previous plan modification), minor interior finish changes, added details on counters (which can be reviewed and approved on site for accessibility compliance), minor site changes and some basic plan clarifications.
Print Occupancy Form  3/18/2008 DONE
Plan Modification Accepted  3/17/2008  
Plan Modification accepted for Bld05-02539 (The Boise Watershed) to make minor changes and additional information affecting civil, architectural, structural, mechanical, plumbing, and electrical drawings. Submitted on sheets A0.0, A0.1, A0.2, A0.3, A0.4, A0.5, C1.0, C2.0, C3.0, C4.0, C5.0, C6.0, C7.0, L1.0, L2.0, L3.0, A1.0, A1.1, A1.2, A2.0, A2.1, A2.2, A3.0, A4.0, A5.0, A5.1, A5.2, A5.3, A6.0, A6.1, A7.0, A7.1, A7.2, A7.3, A7.4, A7.5, A8.0, A10.0, A10.1, A10.2, A10.3, A11.0, S0.1, S1.1, S1.2, S4.1, S4.2, S4.3, S4.4, S5.1, S5.2, S5.3, S5.4, MP1.0, M2.0, M2.1, M3.0, M4.0, M4.1, M4.2, M5.0, M6.0, M6.1, M6.2, M7.0, P2.0, P2.1, P3.0, P4.0, E0.0, E1.0, E1.1, E2.1F, E2.1L, E2.1MP, E2.1P, E2.1S, E2.3R, E3.0, E3.1, E3.2; plan assigned to Marlene Southard and routed to plumbing review first.
Override - Parcel Holds  3/17/2008  
Meeting  3/14/2008 DONE
Meeting with Rick Cummings, Kent Johnson and Dan ? from PW; Curtis Crystal from Modus Architects; Marlene S. from PDS. Went through all plan sheets to review changes to be submitted for a plan modification. Plans turned into Permit Desk to stamp and begin routing to plumbing, then to plan review (Marlene).
Code Occupancy Approval Temp  3/14/2008 DONE
Bond has been received and in place on CUP04-00137. Temporary signed.
BLD-Conference3/11/20083/12/20083/12/2008ADONE
DetailsJim Sly
mike Note: also with George please Phone #: ###-####
C/N Do not proceed with any work that is not contained within a set of approved plans located at jobsite......Changes and addendums to the original approved plans to be included as a complete set of drawings of what is built.
BLD-Conference3/11/20083/11/20083/11/2008PPASS
DetailsJim Sly
Set up meeting 3/12/08.....
BLD-Conference3/10/20083/10/20083/10/2008PCANC
DetailsJim Sly
mike Phone #: ###-####
Code Occupancy Approval Temp3/6/20083/6/20083/6/2008PCANC
DetailsCarol Montgomery
N/R - need to post bond $69,000.00+ for temporary. Called Cathy and gave her information for bonding
Case Summary (BLD)  2/22/2008 DONE
BLD-Energy code compliance12/31/20071/2/20081/2/2008PPASS
DetailsJim Sly
mike Phone #: ###-####
BLD-Framing/Rough-in12/19/200712/20/200712/20/2007APASS
DetailsJim Sly
for cover please-Mike Phone #: ###-####
BLD-Framing/Rough-in11/20/200711/21/200711/21/2007APASS
DetailsJim Sly
mike - exterior part 2 of 2 Phone #: ###-####
BLD-Other11/7/200711/7/200711/7/2007PPART
DetailsJim Sly
Exterior for cover for part 1 of 2--Mike; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
S and E walls OK
Telephone call  11/6/2007 DONE
telcon from Mike Neilsen, Wright const.###-####. RE.1) plywood show on plans; Is that allowed for type 2 construction? I referred him to Marlene Southard to answer that. 2)Would that necessitte sprinklers? I answered he'll need to first find out if its allowed, and if it is, then bring in plans showign the specific area for us to determine if sprinklers might be allowed to be omitted per NFPA 13.
BLD-Other11/1/200711/2/200711/2/2007AFAIL
DetailsMike Jordan
mike Note: cover on the admin bld Phone #: ###-####. On site to inspect soffitt, noted type 2b const. Contractor has placed non fire rated osb behind soffitt. No combustibles allowed. Did note that plans on site called for osb, but were not the approved set. will reshedule for Monday and have approved set of drawings.
BLD-Framing/Rough-in10/25/200710/26/200710/26/2007APART
DetailsJim Sly
mike - metal steel - interior and exterior Phone #: ###-####
Talked to Mike about 3 studs required at all roof joist point loads ( 1 area ) and 1 area with studs offset at point load......will address with Engineer. After Engineer and STRATA ok..........OK to cover exterior.
BLD-Concrete9/24/20079/24/20079/24/2007PPASS
DetailsJim Sly
craig Note: late afternoon please for inspection Phone #: ###-####
Remainder of CMU....trash and radius walls....OK
BLD-Concrete9/20/20079/21/20079/21/2007PPART
DetailsJim Sly
Greg Phone #: ###-####
CMU wall at radius wall and walls for trash enclosures appear OK up to 4' high......
BLD-Wall cover7/17/20077/18/20077/18/2007PPART
DetailsJim Sly
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Wall and interior column pads OK pending special insp, and tests by STRATA
BLD-Footing7/11/20077/11/20077/11/2007PPART
DetailsJim Sly
mike - rebar Phone #: 308-
South and part of E wall......2nd 5' lift......OK pend special insp (strata) tests and approvals.
BLD-Footing7/5/20077/6/20077/6/2007APART
DetailsJim Sly
mike - rebar Phone #: ###-####
Rebar at tower columns and walls OK pending special insp/ Rick Cummings and Tests and approvals from STRATA.
BLD-Footing6/29/20076/29/20076/29/2007PPART
DetailsJim Sly
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Select footings and wall (5' lift)........OK pending special insp..........and testing by STRATA.
BLD-Other6/26/20076/26/20076/26/2007PPART
DetailsJim Sly
mike Note: rebar Phone #: ###-####
Footing OK for Observation tower pending rebar insp by Rick Cummings (Certified reinforced concrete special insp) and tests and approvals from STRATA .
BLD-Footing6/20/20076/20/20076/20/2007PPART
DetailsJim Sly
dave - ###-####
OK pending special inspection by Rick Cummings.
Print Occupancy Form  6/20/2007 DONE
Telephone call  6/20/2007 DONE
left vm for curtis crystal at ###-#### - permit ready and fees given
Permit Ready to Issue  6/20/2007  
Routing - PLAN CHECK6/13/2007 6/20/2007 PASS
PLAN MODIFICATION
PLANS/APPL TAKEN TO FRONT DESK  6/20/2007 DONE
PLAN MODIFICATION
Plan assigned to (MYS)5/15/2007 6/20/2007 PASS
PLAN MODIFICATION to remove the construction of the observation tower, but install the foundation for the structure to be built at a future time.
Routing - FIRE6/12/2007 6/13/2007 PASS
PLAN MODIFICATION to remove the construction of the observation tower, but install the foundation for the structure to be built at a future time. **Attached updated review comments to plans.**
Routing - PLANNING6/8/2007 6/12/2007 PASS
PLAN MODIFICATION
Routing - Erosion and Sediment6/8/2007 6/8/2007 PASS
PLAN MODIFICATION
Routing - PUBLIC WORKS6/6/2007 6/8/2007 PASS
PLAN MODIFICATION to remove the construction of the observation tower, but install the foundation for the structure to be built at a future time.
Routing PW Flood Plain6/7/2007 6/7/2007 PASS
Routing PW Drainage6/7/2007 6/7/2007 PASS
Routing PW Sewer Rating6/7/2007 6/7/2007 PASS
Plan Modification Accepted  5/15/2007  
Plan Mod excepted for sheets A0.0,C2.0,L1.0,A1.0,A2.0,A2.1,S1.1 E2.1L,E2.1P the observation tower to be removed from this phase of the project. the towers foundation will be installed at this time,but the remaining portion will be built in a later phase. Routed to Marlene S.
BLD-Aging Inspection11/30/200611/30/200611/30/2006 PEND
DetailsJim Sly
Talked to architect........still out for bid.
(F) Reprint permit  9/1/2006  
Issue & PRINT to be Invoiced  8/31/2006 DONE
CHANGE ISSUED DATE  8/31/2006 DONE
Telephone call  7/7/2006 DONE
Spoke with Curtis to remind him permit is ready & fees and that extension is only good till 9/4/06 7/7/06 @ 10:56am BAS
Ready Permit EXTENDED  5/3/2006 DONE
Permit application extended until September 4, 2006. jlg.
Telephone call  4/3/2006 DONE
talked to curtis crystal at ###-#### to verify plans have expired- he would like to file for an extension. still wanting plans & going out to bid in 5 weeks or so.
Permit Ready to Issue  12/13/2005  
Print Occupancy Form  12/13/2005 DONE
Telephone call  12/13/2005 DONE
talked to stan cole at ###-#### that permit is ready
Plan assigned to (MLO)9/14/20059/14/200512/12/2005 PASS
12/12/2005 13:24:58 MLO - activity updated through activity BLDA022 from case BLD05-02539.
Routing Off Site - STRUCTURAL12/6/2005 12/12/2005 PASS
Called P D Q for pick up
Routing - PLAN CHECK12/12/2005 12/12/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/12/2005 DONE
Plan resubmittals received  12/5/2005 DONE
Received 1 transmittal letter, 2 review comments , & 3 copys of sheet S1.1,S1.2,S4.3,S5.2 Taken to Mike Otto
Routing Off Site - STRUCTURAL10/24/2005 10/31/2005 FAIL
Plan resubmittals requested  10/31/2005 DONE
structural corrections sent to architect
Routing - PLAN CHECK10/20/2005 10/20/2005 PEND
pending structural approval 10/20
Routing - FIRE10/4/2005 10/20/2005 PASS
Plan resubmittals received  10/20/2005  
Received (2) copies of sheet A9.3 and E2.2L; (2) copies of structural calcs and (3) copies of sheet S0.1, S1.1, S1.2, S2.1, S4.2, S4.3, S5.2, S5.3, S5.6 and S5.7. Routed to Mike O.
1st review completed  10/20/2005 FAIL
failed structural and plan check
Routing - PLAN CHECK9/22/2005 10/4/2005 FAIL
minor items corrections sent to architect
Routing Off Site - STRUCTURAL9/14/2005 10/4/2005 FAIL
Routed to AHJ Engineering. corrections sent to architect
Plan resubmittals requested  10/4/2005 DONE
IBC and structural corrections
Plan resubmittals received  9/30/2005  
Received Letter of Transmittal & 2 Copys of sheets A0.1,A6.6,E3.1 Taken to Mike O.
Routing - PLANNING9/20/2005 9/22/2005 PASS
Meets the requirements of CUP04-00137.
Routing - PLUMBING9/16/2005 9/20/2005 PASS
approved per plan and 2003 UPC. note: this building has a reclaimed water system.
Plan resubmittals received  9/16/2005 DONE
Received Letter of Transmittal ,& 3 Copys of sheet C4.0 Taken to
Mike O.
Routing - PUBLIC WORKS9/15/2005 9/16/2005 PASS
Routing - Erosion and Sediment9/16/2005 9/16/2005 PASS
ESC plan approved with attached conditions.
Routing - PLANNING Land Div9/14/2005 9/15/2005 PASS
Pending Assignment by MYS9/9/2005 9/14/2005 DONE
9/14/2005 16:11:45 JCM - activity updated through activity BLDA169 from case BLD05-02539.
Plans ACCEPTED BY PLAN TECH  9/14/2005  
Plan routing begun/NEW & ADDTN  9/14/2005  
Application received  9/9/2005  
Recd Pcfee & Taken To Pln CK  9/9/2005 DONE
Fee Review-notes9/9/20059/9/2005