Case Summary (BLD) | | | 7/31/2007 | | |
|
|
|
|
BLD-Final | 6/7/2007 | 6/8/2007 | 6/8/2007 | A | PASS |
Dave Hannah
|
|
|
reinspection; Angela; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
DOC - Permit Finaled | 6/8/2007 | 6/8/2007 | 6/8/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 6/8/2007 | 6/8/2007 | 6/8/2007 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Final | 5/31/2007 | 6/1/2007 | 6/1/2007 | P | FAIL |
Dave Hannah
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs to post adress egress window basement bedroom sillheights main floor bedrooms energy cert
|
BLD-Energy code compliance | 8/14/2006 | 8/14/2006 | 8/14/2006 | P | PASS |
Dave Hannah
|
|
|
ADAM nOTE: LATE AFTERNOON; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 8/14/2006 | 8/14/2006 | 8/14/2006 | P | PASS |
Dave Hannah
|
|
|
ADAM nOTE: LATE AFTERNOON; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 8/10/2006 | 8/11/2006 | 8/11/2006 | A | FAIL |
Dave Hannah
|
|
|
adam jr.- call 1/2 hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley c/n on site fire blocking basement walls point load three hold downs scab on one corner truss and engineering on load on truss for floor ok to insulate
|
BLD-Framing/Rough-in | 8/1/2006 | 8/1/2006 | 8/1/2006 | P | FAIL |
Dave Hannah
|
|
|
adam; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs mec final and plans and truss engineering on site
|
BLD-Other | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | PART |
Dave Hannah
|
|
|
robert Note: shear wall nailing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ext but three hold downs missing need eng fix
|
BLD-Foundation | 3/23/2006 | 3/24/2006 | 3/24/2006 | A | PASS |
Tom Arcoraci
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 1/23/2006 | 1/23/2006 | 1/23/2006 | P | PASS |
Dave Hannah
|
|
|
bruno personnel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 1/20/2006 | 1/23/2006 | 1/23/2006 | A | NR |
Dave Hannah
|
|
|
bruno personnel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PubWorks Subgrade Approval | 1/23/2006 | 1/23/2006 | 1/23/2006 | | DONE |
|
|
|
Subgrade for upper level footings approved by the geotechnical engineer
|
BLD-Foundation | 12/20/2005 | 12/21/2005 | 12/21/2005 | A | PART |
Jim Storey
|
|
|
j jones; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 12/12/2005 | 12/12/2005 | 12/12/2005 | P | PASS |
Dave Hannah
|
|
|
jay jones; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
PubWorks Subgrade Approval | 11/29/2005 | 11/29/2005 | 11/29/2005 | | PART |
|
|
|
Subgrade for basement footings approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 10/12/2005 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 10/7/2005 | 10/7/2005 | 10/11/2005 | | PASS |
|
|
|
10/11/2005 09:37:56 SRZ - activity updated through activity BLDA022 from case BLD05-02592.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2005 | | DONE |
|
|
|
ONE SET RED-LINED.
|
Permit Ready to Issue | | | 10/11/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/11/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/11/2005 | | DONE |
|
|
|
called ###-#### and left voicemessage that permit is ready and fees
|
Routing - PLAN CHECK | 9/30/2005 | | 10/11/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 10/10/2005 | | |
|
|
|
|
Plan assigned to (SAM) | 9/15/2005 | 9/15/2005 | 10/7/2005 | | DONE |
|
|
|
|
Routing - FIRE | 9/20/2005 | | 9/30/2005 | | PASS |
|
|
|
No fire sprinklers required (Boulder Heights Estates sub, per T. Records and D. Miller)
|
Routing - PLANNING | 9/19/2005 | | 9/20/2005 | | PASS |
|
|
|
Meets the requirements of CFH05-00031 as redlined on site plans.
|
Routing - Erosion and Sediment | 9/20/2005 | | 9/20/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 9/16/2005 | | 9/19/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 9/15/2005 | | 9/16/2005 | | PASS |
|
|
|
Approved as Category 1 by CFH05-00031
|
Application received | | | 9/15/2005 | | |
|
|
|
|