BLD-Final | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | PASS |
Tom Arcoraci
|
|
|
scott - ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie; call for garage code
|
DOC - Permit Finaled | 8/21/2007 | 8/21/2007 | 8/21/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Grading Inspection | 8/20/2007 | 8/20/2007 | 8/20/2007 | | BOND |
|
|
|
The rough grading and drainage has been completed at the above mentioned address. However, final grading and approval for a six foot high retaining wall has not been completed. For this the engineer has recommended a bond of $1,000.00. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Final | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | FAIL |
Dave Hannah
|
|
|
carol - pls call for key code, ###-#### cell; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs terrys final
|
BLD-Framing/Rough-in | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PASS |
Mike Jordan
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Energy code compliance | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PASS |
Mike Jordan
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 7/27/2006 | 7/28/2006 | 7/28/2006 | P | PART |
Dave Hannah
|
|
|
carol; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley crew on site finishing fire blocking will check rest at energy insp ok to insulate
|
BLD-Framing/Rough-in | 7/26/2006 | 7/27/2006 | 7/27/2006 | A | FAIL |
Dave Hannah
|
|
|
carol ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley c/n on site fire blockin do not insulate needs city aproved plans on site
|
FIRE-Sprinkler Rough-in | 7/21/2006 | 7/24/2006 | 7/24/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide approval notes that accompany the approved plans, tenting is inadequate and needs modified in several locations, provide additional hangers on the 1 1/2" main in the west end of the basement, sidewall heads in the garage appear to be overspaced and provide as-built drawings and hydraulic calculations that include all of the piping changes and hydraulic calculation changes including the slope from the street to the riser
|
BLD-Foundation | 1/4/2006 | 1/6/2006 | 1/6/2006 | A | PART |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa back walls for basement
|
BLD-Foundation | 12/28/2005 | 12/29/2005 | 12/29/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/28/2005 at 11:20:54 PM. Contact: ###-####.
|
BLD-Footing | 12/27/2005 | 12/28/2005 | 12/28/2005 | P | NR |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 12/23/2005 | 12/27/2005 | 12/28/2005 | A | NR |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
PubWorks Subgrade Approval | 12/28/2005 | 12/28/2005 | 12/28/2005 | | PASS |
|
|
|
Recived subgrade approval letter from MTI. Placement of foundation elements can begin.
|
Issue PAID IN FULL permit | | | 11/1/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 9/16/2005 | 10/5/2005 | 10/28/2005 | | PASS |
|
|
|
10/28/2005 07:27:48 SAM - activity updated through activity BLDA022 from case BLD05-02593.
|
Routing - PLAN CHECK | 10/13/2005 | | 10/28/2005 | | PASS |
|
|
|
Waiting for resubmittals from builder.
|
Case Summary (BLD) | | | 10/28/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/28/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/28/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/28/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - FIRE | 10/7/2005 | | 10/11/2005 | | PASS |
|
|
|
no fire sprinklers required.
|
Routing - Erosion and Sediment | 10/6/2005 | | 10/7/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 10/4/2005 | | 10/6/2005 | | FAIL |
|
|
|
10:30 I called the builder and left a message. I let him know that I need a new REScheck, some beam sizes, roof framing plan to scale from the truss company and a detail of the deck / house and how it is being constructed. Plans are being routed to other departments.
|
Routing - PLANNING | 9/21/2005 | | 9/26/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 9/16/2005 | | 9/21/2005 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 9/21/2005 | | 9/21/2005 | | PASS |
|
|
|
|
Application received | | | 9/16/2005 | | |
|
|
|
|