Permit NumberBLD05-02621
StatusFinaled
Name WESTROCK HOMES
Site Address 11388 W GREYLING CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2712sq.ft. Two story single family dwelling (1689sq.ft. Main floor / 1023sq.ft. Upper floor) with a 64sq.ft. Covered front porch, a 240sq.ft. Covered rear patio, and a 818sq.ft. Attached three car garage per approved plans, all red-lining, Engineering, and plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by Boise city. (SRZ) **01/18/06 ADDED a 1302sq.ft. Detached two story shop to this permit per approved plans, and all red-lining. (SRZ)****Planning approval as per T.C.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/10/20064/11/20064/11/2006APASS
DetailsMike Jordan
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
DOC - Permit Finaled4/11/20064/11/20064/11/2006PPASS
DetailsMike Jordan
Landing installed, grading complete.
BLD-Final4/7/20064/10/20064/10/2006PFAIL
DetailsMike Jordan
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Grading not complete. Needs landing at masterbedroom door.
BLD-Final4/6/20064/7/20064/7/2006PNR
DetailsMike Jordan
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Still needs elec and plumbing finals.
BLD-Final4/5/20064/6/20064/6/2006ANR
DetailsMike Jordan
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs other trades finaled first.
BLD-Final4/5/20064/5/20064/5/2006PCANC
DetailsMike Jordan
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong /// Cancel and reschedule for 4-6 AM 4-5-06 eus
BLD-Foundation2/27/20062/27/20062/27/2006PDONE
DetailsMike Jordan
shawn; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Stemwall already placed when on site.
BLD-Footing2/24/20062/24/20062/27/2006PPART
DetailsMike Jordan
Dane; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. perimeter footing for detached shop.
BLD-Framing/Rough-in1/30/20061/31/20061/31/2006APASS
DetailsMike Jordan
Christ -- call 1st before insp for reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Also performed energy code insp at this time.
BLD-Framing/Rough-in1/27/20061/30/20061/30/2006ANR
DetailsMike Jordan
Chris -- for resinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All items on c/n not complete.
BLD-Framing/Rough-in1/26/20061/27/20061/27/2006AFAIL
DetailsMike Jordan
Chris -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Complete nailing of all simpson hangars. Provide blocking between attic trusses at bonus room. Justify 2x8 header in leiu of the 2 9.5 inch ml as noted on plans at opening to master bedroom.
Case Summary (BLD)  1/18/2006  
Case Summary (BLD)  1/18/2006  
Inspection Record Card- Bld  1/18/2006 DONE
Telephone call  1/18/2006 DONE
Spoke with Kelly from Westrock homes and told him that permit is ready & fees @8:40am on 1/18/06 BAS
BLD-Final11/18/200511/18/200511/18/2005PCANC
DetailsMike Jordan
rod; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation10/27/200510/27/200510/27/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/27/2005 at 8:34:30 AM. Contact: ###-####.
BLD-Footing10/26/200510/26/200510/26/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/26/2005 at 10:51:38 AM. Contact: ###-####.
Issue PAID IN FULL permit  10/19/2005 DONE
Permit Ready to Issue  10/3/2005  
Inspection Record Card- Bld  10/3/2005 DONE
Telephone call  10/3/2005 DONE
left mess that permit is ready
Plan assigned to (SRZ)9/30/20059/30/20059/30/2005 PASS
9/30/2005 16:45:07 SRZ - activity updated through activity BLDA022 from case BLD05-02621.
Plan assigned to (SAM)9/19/20059/19/20059/30/2005 DONE
Case Summary (BLD)  9/30/2005  
PLANS/APPL TAKEN TO FRONT DESK  9/30/2005 DONE
ONE SET RED-LINED.
Routing - PLAN CHECK9/21/2005 9/30/2005 PASS
Routing - PUBLIC WORKS9/20/2005 9/21/2005 PASS
Routing - PLANNING9/19/2005 9/20/2005 PASS
Application received  9/19/2005