Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD05-02644
StatusFinaled
Name SAGE CONSTRUCTION
Site Address 435 N MILWAUKEE ST
Project NameWESTPARK RETAIL B
Customer Number 
ePlanReviewNo
Description
(DINNERS READY) Interior remodel to an existing 1,967 sq. ft. space for a new food preparation and packaging tenant per approved plans. There is no cooking that results in grease laden vapors within this space. Work to include some new interior walls, some new interior doors and windows, interior finish, some new soffit/ceiling work, a new accessible restroom, a new walk-in freezer, kitchen equipment, some new sinks, new counters/casework, fire sprinkler work, mechanical work, plumbing work, and electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/11/2006  
Third Notice 2/14/20062/14/2006 DONE
Third Notice BLD2/7/20062/7/20062/14/2006 DONE
Second Notice has not been responded to.
Second Notice BLD1/13/20061/13/20062/7/2006 DONE
First Notice has not been responded to.
First Notice 12/29/20051/13/2006 DONE
BLD-Final12/22/200512/23/200512/23/2005PPASS
DetailsJim Storey
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore final ok
FIRE-Final Inspection12/22/200512/23/200512/23/2005APASS
DetailsTroy Cobbley
life safety finaled
Permanent Occupancy 12/23/200512/23/2005 DONE
Details
Permanent occupancy  12/23/2005 DONE
Perm. Occ. Cert. # 10851 issued 12-23-05 to Dinners Ready.
FIRE-Final Inspection12/21/200512/22/200512/22/2005PFAIL
DetailsTroy Cobbley
Mount fire extinguisher as discussed, provide 200 degree head above dishwasher, provide all door hardware, remove thumbturn from rear door, test emergency lights/exit signs. Install ceiling tile at sprinkler heads.
BLD-Framing/Rough-in12/16/200512/19/200512/19/2005APASS
DetailsMike Jordan
ceiling inspection///tim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Ceiling grid ok.
BLD-Framing/Rough-in12/15/200512/16/200512/16/2005AFAIL
DetailsMike Jordan
ceiling grid--tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Needs to add rigids struts and splay wires as per plans or make suspended system.
1st review completed  11/2/2005 FAIL
failed plan check and plumbing
Permit Ready to Issue  11/2/2005  
Inspection Record Card- Bld  11/2/2005  
Print Occupancy Form  11/2/2005 DONE
Issue PAID IN FULL permit  11/2/2005  
Telephone call  11/2/2005 DONE
talked to debbie at ###-#### that permit is ready
PLANS/APPL TAKEN TO FRONT DESK  11/2/2005 PASS
Routing - PLAN CHECK11/2/2005 11/2/2005 PASS
Permit and plans approved and taken to front desk.
Plan assigned to (JCB)9/29/2005 11/2/2005 PASS
11/2/2005 09:59:10 JCB - activity updated through activity BLDA022 from case BLD05-02644.
Routing - FIRE10/20/2005 11/2/2005 PASS
Routing - PLAN CHECK10/19/2005 10/20/2005 PEND
Plan review attached to plans and e-mailed to architect and tenant. No response required. A few items have been red-lined on the plans for clarification. When approved by the Fire Dept. the permit can be issued. Plans to route to the Fire Dept. for review.
Plan resubmittals received  10/20/2005 DONE
Received 1 Letter to Jason,1 enlarged restroom plan, 2- 8 1/2 x11 Lighting compliance,2 faxes to Oscar of floor panels. taken to Jason B.
Routing - PLUMBING10/18/2005 10/19/2005 PASS
When done please route back to Jason in Plan Review. t&p drain to discharge to mop sink. thermol expantion protection required.
Plan resubmittals received  10/18/2005 DONE
Received Letter of Transmittal ,& 2 Copys of sheet P-1 Taken to Jason B.
Routing - PLAN CHECK10/4/2005 10/18/2005 FAIL
A few minor items to be clarified via small addendums faxed. Plans to route to the Plumbing Division again for review of resubmittal plumbing plans.
Telephone call  10/18/2005 DONE
Talked with tenant concerning some of the minor issues. He stated he would get with the architect to address and have them fax over some additional information.
Telephone call  10/17/2005 DONE
Talked with Oscar of Larry Knopp Architects to discuss a few items for clarification. He stated he would address and provide small fax addendums.
Routing - PLUMBING10/3/2005 10/4/2005 FAIL
provide a plan view of the waste and water systems. provide the above listed items.
Routing - PUBLIC WORKS9/29/2005 10/3/2005 PASS
Plans ACCEPTED BY PLAN TECH  9/22/2005  
Application received  9/20/2005  
Recd Pcfee & Taken To Pln CK  9/20/2005  
Fee Review-notes9/20/20059/20/2005