Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02650
StatusFinaled
Name BRIGHTON INVESTMENTS LLC
Site Address 12828 W LASALLE ST
Project NameDiscovery Pointe Office Bldg
Customer Number 
ePlanReviewNo
Description
Discovery Pointe Office Building (Shell Only) - To construct a new 7,000 square foot, one story, wood framed office shell building and relates site improvements. This is a shell permit only and occupancy is allowed under this permit. Separate tenant improvement permit will be required to finish this building for occupancy. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/20073/1/2007 DONE
Second Notice has not been responded to.
Fee Review-notes9/21/20059/21/20052/6/2007 DONE
Second Notice BLD9/25/20069/25/20061/8/2007 DONE
First Notice has not been responded to.
First Notice8/17/20068/17/20069/25/2006 DONE
DetailsTom Arcoraci
First Notice 8/8/20068/25/2006 DONE
BLD-Final8/16/20068/17/20068/17/2006APASS
DetailsTom Arcoraci
hc company; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
DOC - Permit Finaled8/17/20068/17/20068/17/2006PPASS
DetailsTom Arcoraci
Reopen Permit (ISS)  8/16/2006 DONE
m.meloy finaled the permit by mistake. I spoke to him about this. needs bld final insp
Permanent occupancy  8/8/2006 PASS
The applicant has provided a Shared Trash Enclosure Agreement that satisfies the trash requirements (in lieu of building the trash enclosure shown on the plans).

FIRE-Final Inspection7/13/20067/14/20067/14/2006APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection7/13/20067/13/20067/13/2006PFAIL
DetailsTroy Cobbley
Exit discharge lights did not work.
BLD-Conference6/2/20066/2/20066/2/2006PPASS
DetailsJim Sly
daren - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
FIRE-Conference5/18/20065/19/20065/19/2006ADONE
DetailsTroy Cobbley
I went over life safety items with Darren. Needs address on both corners of the building and to test the exit discharge lighting when complete.
BLD-Framing/Rough-in2/16/20062/17/20062/17/2006PPART
DetailsJim Sly
darin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Shear nailing OK...... Hold downs on exterior (of Ext) wall OK Retrofit HDs OK but need to be screwed to studs.......Epoxy inspected by special insp.
Still working on draftstops.
BLD-Framing/Rough-in1/11/20061/12/20061/12/2006PPART
DetailsJim Sly
re-bar inspection///pouring at 2:30 -- darren; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Foot OK Pending MTI special insp, tests, and approvals
(F) Reprint permit  12/22/2005  
Issue PAID IN FULL permit  12/21/2005 DONE
Inspection Record Card- Bld  10/31/2005 DONE
Permit Ready to Issue  10/31/2005 DONE
Telephone call  10/31/2005 DONE
called ###-#### and left voicemessage for Anita that permit is ready and fees
Plan assigned to (JCM)9/22/20059/22/200510/27/2005 PASS
10/27/2005 16:17:43 JCM - activity updated through activity BLDA022 from case BLD05-02650.
Routing - PLAN CHECK10/19/2005 10/27/2005 PASS
Routing - PLANNING Land Div10/27/2005 10/27/2005 PASS
Approved on Lot 2, Block 1 of LaSalle Subdivision. Final Plat of LaSalle Subdivision recorded on October 26, 2005.
PLANS/APPL TAKEN TO FRONT DESK  10/27/2005 DONE
Plan Reviewer's activity  10/27/2005 PASS
Reviewed and approved resubmitte structural plans and calculations. JCM
Routing - PLAN CHECK10/27/2005 10/27/2005 PASS
Plan resubmittals received  10/26/2005 DONE
Received 2 review comments ,1 document transmittal, 1 letter to Wes Steele,& 4 copys of sheets A1.3,S-4,S-5,S-6 taken to John M.
Routing - FIRE9/30/2005 10/19/2005 PASS
1st review completed  10/19/2005 FAIL
failed planning land div.
Plan resubmittals requested  10/6/2005 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL9/22/2005 10/6/2005 FAIL
Called PDQ for pick up -- Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLAN CHECK9/29/2005 9/30/2005 PASS
Plan Reviewer's activity  9/29/2005 PASS
Plans reviewed and approved as submitted. JCM
Routing - PLANNING9/27/2005 9/29/2005 PASS
DRH 05-00099 Sara S. Approved per DRH05-00099. The condition regarding the easement for the sidewalk shall be handled on the revised plat.
Routing - PLUMBING9/27/2005 9/27/2005 PASS
per plans and 2003 upc
Routing - Erosion and Sediment9/26/2005 9/27/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS9/22/2005 9/26/2005 PASS
Routing - PLANNING Land Div9/22/2005 9/22/2005 FAIL
Do not issue building permit until Final Plat of LaSalle Subdivision is recorded. Lot 2, Block 1 of LaSalle Subdivision. Final Plat signed by Boise City Engineer on 9/18/05.
Plans ACCEPTED BY PLAN TECH  9/22/2005  
Plan routing begun/NEW & ADDTN  9/22/2005  
Application received  9/21/2005  
Recd Pcfee & Taken To Pln CK  9/21/2005 DONE