DOC - Permit Expired | 7/30/2009 | 7/30/2009 | 7/30/2009 | P | PASS |
Tony Young
|
|
|
|
BLD-Conference | 4/6/2009 | 4/6/2009 | 4/7/2009 | P | NH |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/1/2008 | 10/1/2008 | 10/7/2008 | | CANC |
Tony Young
|
|
|
|
BLD-Conference | 7/28/2008 | 7/28/2008 | 7/30/2008 | A | PART |
Tony Young
|
|
|
find status per 415 on aging called and left messege to call in for final if ready
|
BLD-Energy code compliance | 2/14/2007 | 2/15/2007 | 2/15/2007 | A | PASS |
Mike Jordan
|
|
|
russ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 2/8/2007 | 2/9/2007 | 2/9/2007 | A | PASS |
Tony Young
|
|
|
russ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall stair area ok to insulate
|
BLD-Framing/Rough-in | 2/1/2007 | 2/2/2007 | 2/2/2007 | A | PART |
Tony Young
|
|
|
russ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall stair assembly ok
|
BLD-Conference | 1/16/2007 | 1/16/2007 | 1/16/2007 | P | PASS |
Tom Arcoraci
|
|
|
russ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Foundation | 10/17/2006 | 10/18/2006 | 10/18/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/17/2006 at 4:49:42 PM. Contact: ###-####.
|
BLD-Footing | 10/2/2006 | 10/3/2006 | 10/3/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/2/2006 at 4:56:35 PM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 8/11/2006 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 9/30/2005 | | 8/8/2006 | | PASS |
|
|
|
8/8/2006 06:21:48 DRS - activity updated through activity BLDA022 from case BLD05-02669.
|
Telephone call | | | 8/3/2006 | | DONE |
|
|
|
tlk to shane for james gibson ###-#### that permit and fees are ready to be picked up but needs GC and RCE
|
Permit Ready to Issue | | | 8/3/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2006 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/1/2006 | | 8/2/2006 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Routing - PLAN CHECK | 8/2/2006 | | 8/2/2006 | | PASS |
|
|
|
Approved as red-lined notes on plans and all attached plan review conditions. To permit desk to issue.
|
Inspection Record Card- Bld | | | 8/2/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/1/2006 | | DONE |
|
|
|
Russ Buschert and his contractor Jake Lehman came in to signe Jake up for the ESC R.P. class at BSU. Jake will attend to receive certification as an R.P. Jake was given a temporary R.P. # which can be used for this project. I was notified by Darla Downs that the process was complete, so I will route the plans back to ESC for approval.
|
Telephone call | | | 7/27/2006 | | DONE |
|
|
|
Call to Russ Buschert, ###-####, cell number, telling him I need to have the Responsible Person and their certification number for ESC to review and approve plans and then to get the plan picked up ASAP or we need to expire the application and plans and he can start again when they are ready to do the project. I left him this voice message and my number to call me back.
|
Plan resubmittals requested | | | 7/6/2006 | | DONE |
|
|
|
Called structural engineer, Jesse @ Pinnacle Eng. to review beam required under existing wall at interior side of stairway remodel. Plans by architect indicate (3) 9.5" TJI's and engineering data provided to design the 14" header across stairs indicates that (3) 1.75" x 9.5" LVL's fail in bending & deflection. Jesse will review and fax me requirements for this beam and I will red-line on plans and attach his design data.
|
Plan resubmittals received | | | 7/6/2006 | | PASS |
|
|
|
Received design data from Pinnacle Eng. Jesse & Eric Wolfe stating beam requirements to support under existing wall and roof being modified to expand width of stairs. Beam needs to be (3) 1.75 x 11.875 below structure at 7 in 12 slope per plans to match new TJI roof joists. Attach beam to 14" LVL with 'Simpson' HHUS 5.50/10 sloped hanger, all per engineers analysis, copy attached to plans.
|
Telephone call | | | 7/6/2006 | | DONE |
|
|
|
Called Pinnacle Engineers with question on beam design engineering that shows failed. Jesse will review and submit requirements. Engineering stamped by Eric Wolfe.
|
Telephone call | | | 7/6/2006 | | DONE |
|
|
|
Called Russ Buschert, Mennonite Church Representative working with me to get this permit. Told him of need for additional engineering on beam and request to structural engineer to provide. Russ said okay.
|
Telephone call | | | 7/6/2006 | | DONE |
|
|
|
Called Russ Buschert, Mennonite Church, to let him know that there is still an outstanding issue with ESC regarding the declaration of an RP (responsible person) that is certified by the city. Left him a voice message. the permit cannot be issued until the matter is resolved with Steve Web.
|
Routing - PLAN CHECK | 7/5/2006 | | 7/6/2006 | | PEND |
|
|
|
Received copies of plans and engineering data from Russ Buschert. We reviewed in lobby. Approved Russ to turn in plans to permit desk to be date stamped as resubmittals. Russ provided floor plans of main level and basement with room use, area, exits, occupant loads and engineering design data. Inserted new plans into original and red-lined engineering on plans to avoid delaying issuance of permit once the ESC concern about a certified RP is completed.
|
Plan resubmittals received | | | 7/5/2006 | | |
|
|
|
Received 2 copies of Calcuations book, and 2 copies of the following sheets--1, 2, 3, 4 and taken to Dan Stuart
|
Routing - PLAN CHECK | 11/1/2005 | | 5/31/2006 | | FAIL |
|
|
|
Inserted new plans into original submittals & reviewed resubmittals. Architect failed to address the conditions of the plan review in the resubmittals. I notified Russ Buschert, church rep of the problem and resent the plan review conditions back to Mr. Gibson with copy to Russ.
|
Plan resubmittals received | | | 5/24/2006 | | |
|
|
|
Received 3 copies of sheets 1,2,3 and taken to Dan Stuart
|
Telephone call | | | 5/17/2006 | | DONE |
|
|
|
Called Menonite church Representative listed on plans, Russ Buschert, to see what the intent concerning the project is. The church still inteands to do project but has had problem with getting contractor and then get the architect to respond to plan review conditions. They now have contractor but nothing from architect yet. Russ will call architect, James Gibson. I told Russ' wife the plans have exceeded the 180 days when they normally expire.
|
Telephone call | | | 4/12/2006 | | DONE |
|
|
|
Received call from church representative regarding status of permit. Still waiting for re-submittals from architect. He will contact architect to hurry up response.
|
Routing - FIRE | 10/18/2005 | | 11/1/2005 | | PASS |
|
|
|
Approved subject to IBC comments, no fire comments required.
|
1st review completed | | | 11/1/2005 | | FAIL |
|
|
|
failed ESC and plan check.
|
Routing - PLAN CHECK | 10/14/2005 | | 10/18/2005 | | FAIL |
|
|
|
Resubmittals required. Routing to fire code analyst for review.
|
Routing - PUBLIC WORKS | 9/30/2005 | | 10/3/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 10/3/2005 | | 10/3/2005 | | FAIL |
|
|
|
ESC plan waiver is approved but rp listed on application is not certified. Informed person listed as rp that the certification is required prior to issance of building or erosion permit.
|
Routing - PLANNING | 10/3/2005 | | 10/3/2005 | | PASS |
|
|
|
Jeff Neberman DRH05-00217
|
Plans ACCEPTED BY PLAN TECH | | | 9/29/2005 | | |
|
|
|
|
Application received | | | 9/23/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/23/2005 | | |
|
|
|
|
Fee Review-notes | 9/23/2005 | 9/23/2005 | | | |
|
|
|
|