Permit Information
Permit NumberBLD05-02731
StatusFinaled
Name STEED CONSTRUCTION
Site Address 8201 W OVERLAND RD
Project NameOVERLAND RETAIL PLAZA
Customer Number 
ePlanReviewNo
Description
Overland Retail Plaza - (Shell) - To build a new 17,850 square foot, one story retail shell building and related site improvements. This building will be constructed on masonry exterior walls, wood roof trusses. This building will be fully fire sprinklered. The sprinklers are used for allowable area increase. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/13/2008 DONE
Third Notice BLD1/8/20071/8/20072/1/2007 DONE
Second Notice has not been responded to.
Telephone call  1/31/2007 DONE
lft vm with barbara regarding the high differences in the plum and mech to return my call
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
(F) Reprint permit  1/3/2007  
First Notice11/21/200611/21/200612/27/2006 DONE
DetailsMike Jordan
BLD-Final11/21/200611/21/200611/21/2006PPASS
DetailsMike Jordan
DOC - Permit Finaled11/21/200611/21/200611/21/2006PPASS
DetailsMike Jordan
Letter og compliance issued for shell and core. PIV valve relocated to outside of bldg, therefore riser room no longer required to be 1 hr const. Also noted fire sprinklers at canopy area, draftstop not required as previously mentioned.
Code Occupancy Approval  11/21/2006 PASS
OBTAINED PLANNING APROVALS FOR CHANGES FINAL SIGNED OFF.
FIRE-Final Inspection11/9/200611/9/200611/9/2006APASS
DetailsForrest France
Required corrections have been verified for completion, shell fire life safety passed.
FIRE-Final Inspection11/6/200611/6/200611/6/2006AFAIL
DetailsForrest France
Missing fire dept. access curb lettering, address as posted is missing one number, need to final fire sprinkler permit prior to shell life safety final.
COD-Stop Work/Reinspection DR 8/18/20068/18/2006 FAIL
DetailsScott M.Brown
SITE NOT TO APPROVED DR APPROVAL. DRIVEWAY, PARKING LOT, REDUCED PARKING SPACES AND MISSING REQUIRED LANDSCAPE.
Inspection Record Card- Bld  7/20/2006 DONE
BLD-Framing/Rough-in5/25/20065/25/20065/25/2006PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/25/2006 at 8:20:43 AM. Contact: ###-####. Mech room is required to be 1hr. const. due to riser. Submit detail for 1hr wall and ceiling assembly.
BLD-Energy code compliance4/14/20064/14/20064/14/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/14/2006 at 9:32:53 AM. Contact: ###-####. Needs to provide fireblocking from toop of cmu wall to underneath side of roof deck at canopy area.
BLD-Framing/Rough-in3/30/20063/30/20063/30/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/30/2006 at 7:07:35 AM. Contact: ###-####.
BLD-Other3/16/20063/16/20063/16/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/16/2006 at 10:37:59 AM. Contact: ###-####. Roof sheating and hardware.
BLD-Foundation1/25/20061/26/20061/26/2006ADONE
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/25/2006 at 3:05:09 PM. Contact: ###-####. Not a foundation insp. Bldg. confrence. Reviewed all special insp reports for compliance on footings foundations and masonry wall constructed to date.
(F) Reprint permit  12/7/2005  
Issue PAID IN FULL permit  12/6/2005 DONE
Inspection Record Card- Bld  11/21/2005 DONE
Permit Ready to Issue  11/21/2005 DONE
Telephone call  11/21/2005 DONE
left message that permit is ready, fees & that ACHD info needed///11/21/05 1:15pm BAS
Plan assigned to (JCM)10/3/2005 11/18/2005 PASS
11/18/2005 16:17:45 JCM - activity updated through activity BLDA022 from case BLD05-02731.
Routing - PLANNING Land Div11/16/2005 11/18/2005 PASS
Routing - PUBLIC WORKS11/18/2005 11/18/2005 PASS
Routing - PLAN CHECK11/18/2005 11/18/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/18/2005 DONE
Routing - FIRE11/2/2005 11/16/2005 PASS
approved with conditions. Review faxed to architect.
1st review completed  11/16/2005 FAIL
failed public works and planning land div.
Routing - PLAN CHECK10/28/2005 11/2/2005 PASS
Routing - PLANNING10/24/2005 10/28/2005 PASS
Approved per DRH05-00289.
Routing - PLUMBING10/21/2005 10/24/2005 PASS
use boise city approved grease interceptor detail, attached.
Routing - Erosion and Sediment10/20/2005 10/21/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS10/10/2005 10/20/2005 FAIL
This project requires the construction of public sewer main. Separate sewer plans meed to be submitted to public works. Contact Jim Pardy at ###-####
Plan Reviewer's activity  10/19/2005 PASS
Plans reviewed and approved as submitted. JCM
Routing - PLANNING Land Div10/7/2005 10/10/2005 FAIL
Applicant / owner must show legal land division. (Provide copy of deed showing that the subject property existed as it appears today prior to January 1, 1985.)
Routing Off Site - STRUCTURAL10/3/2005 10/10/2005 PASS
Called PDQ for pick up - Received a faxed letter form the consulting structural engineer approving the structural plans. JCM
Plans ACCEPTED BY PLAN TECH  10/7/2005  
Plan routing begun/NEW & ADDTN  10/7/2005  
Application received  9/30/2005  
Recd Pcfee & Taken To Pln CK  9/30/2005 DONE
Fee Review-notes9/30/20059/30/2005