Case Summary (BLD) | | | 5/13/2008 | | DONE |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 2/1/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 1/31/2007 | | DONE |
|
|
|
lft vm with barbara regarding the high differences in the plum and mech to return my call
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
(F) Reprint permit | | | 1/3/2007 | | |
|
|
|
|
First Notice | 11/21/2006 | 11/21/2006 | 12/27/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | PASS |
Mike Jordan
|
|
|
Letter og compliance issued for shell and core. PIV valve relocated to outside of bldg, therefore riser room no longer required to be 1 hr const. Also noted fire sprinklers at canopy area, draftstop not required as previously mentioned.
|
Code Occupancy Approval | | | 11/21/2006 | | PASS |
|
|
|
OBTAINED PLANNING APROVALS FOR CHANGES FINAL SIGNED OFF.
|
FIRE-Final Inspection | 11/9/2006 | 11/9/2006 | 11/9/2006 | A | PASS |
Forrest France
|
|
|
Required corrections have been verified for completion, shell fire life safety passed.
|
FIRE-Final Inspection | 11/6/2006 | 11/6/2006 | 11/6/2006 | A | FAIL |
Forrest France
|
|
|
Missing fire dept. access curb lettering, address as posted is missing one number, need to final fire sprinkler permit prior to shell life safety final.
|
COD-Stop Work/Reinspection DR | | 8/18/2006 | 8/18/2006 | | FAIL |
Scott M.Brown
|
|
|
SITE NOT TO APPROVED DR APPROVAL. DRIVEWAY, PARKING LOT, REDUCED PARKING SPACES AND MISSING REQUIRED LANDSCAPE.
|
Inspection Record Card- Bld | | | 7/20/2006 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/25/2006 | 5/25/2006 | 5/25/2006 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/25/2006 at 8:20:43 AM. Contact: ###-####. Mech room is required to be 1hr. const. due to riser. Submit detail for 1hr wall and ceiling assembly.
|
BLD-Energy code compliance | 4/14/2006 | 4/14/2006 | 4/14/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/14/2006 at 9:32:53 AM. Contact: ###-####. Needs to provide fireblocking from toop of cmu wall to underneath side of roof deck at canopy area.
|
BLD-Framing/Rough-in | 3/30/2006 | 3/30/2006 | 3/30/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/30/2006 at 7:07:35 AM. Contact: ###-####.
|
BLD-Other | 3/16/2006 | 3/16/2006 | 3/16/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/16/2006 at 10:37:59 AM. Contact: ###-####. Roof sheating and hardware.
|
BLD-Foundation | 1/25/2006 | 1/26/2006 | 1/26/2006 | A | DONE |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/25/2006 at 3:05:09 PM. Contact: ###-####. Not a foundation insp. Bldg. confrence. Reviewed all special insp reports for compliance on footings foundations and masonry wall constructed to date.
|
(F) Reprint permit | | | 12/7/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/6/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/21/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/21/2005 | | DONE |
|
|
|
left message that permit is ready, fees & that ACHD info needed///11/21/05 1:15pm BAS
|
Plan assigned to (JCM) | 10/3/2005 | | 11/18/2005 | | PASS |
|
|
|
11/18/2005 16:17:45 JCM - activity updated through activity BLDA022 from case BLD05-02731.
|
Routing - PLANNING Land Div | 11/16/2005 | | 11/18/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/18/2005 | | 11/18/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/18/2005 | | 11/18/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2005 | | DONE |
|
|
|
|
Routing - FIRE | 11/2/2005 | | 11/16/2005 | | PASS |
|
|
|
approved with conditions. Review faxed to architect.
|
1st review completed | | | 11/16/2005 | | FAIL |
|
|
|
failed public works and planning land div.
|
Routing - PLAN CHECK | 10/28/2005 | | 11/2/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 10/24/2005 | | 10/28/2005 | | PASS |
|
|
|
Approved per DRH05-00289.
|
Routing - PLUMBING | 10/21/2005 | | 10/24/2005 | | PASS |
|
|
|
use boise city approved grease interceptor detail, attached.
|
Routing - Erosion and Sediment | 10/20/2005 | | 10/21/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 10/10/2005 | | 10/20/2005 | | FAIL |
|
|
|
This project requires the construction of public sewer main. Separate sewer plans meed to be submitted to public works. Contact Jim Pardy at ###-####
|
Plan Reviewer's activity | | | 10/19/2005 | | PASS |
|
|
|
Plans reviewed and approved as submitted. JCM
|
Routing - PLANNING Land Div | 10/7/2005 | | 10/10/2005 | | FAIL |
|
|
|
Applicant / owner must show legal land division. (Provide copy of deed showing that the subject property existed as it appears today prior to January 1, 1985.)
|
Routing Off Site - STRUCTURAL | 10/3/2005 | | 10/10/2005 | | PASS |
|
|
|
Called PDQ for pick up - Received a faxed letter form the consulting structural engineer approving the structural plans. JCM
|
Plans ACCEPTED BY PLAN TECH | | | 10/7/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/7/2005 | | |
|
|
|
|
Application received | | | 9/30/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/30/2005 | | DONE |
|
|
|
|
Fee Review-notes | 9/30/2005 | 9/30/2005 | | | |
|
|
|
|