Case Summary (BLD) | | | 4/3/2007 | | |
|
|
|
|
Fee Review-notes | 10/4/2005 | 10/4/2005 | 2/13/2007 | | DONE |
|
|
|
|
Third Notice BLD | 8/18/2006 | 8/18/2006 | 9/14/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/2/2006 | 8/2/2006 | 8/18/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 6/27/2006 | 6/27/2006 | 8/2/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PASS |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PASS |
Mike Jordan
|
|
|
shell and core ok, special insp. ok per letter.
|
FIRE-Final Inspection | 6/26/2006 | 6/26/2006 | 6/27/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 6/23/2006 | 6/23/2006 | 6/23/2006 | P | NR |
Mike Jordan
|
|
|
Tod; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
FIRE-Final Inspection | 6/23/2006 | 6/23/2006 | 6/23/2006 | P | CANC |
Troy Cobbley
|
|
|
Cancelled at the contractors request.
|
PubWorks Occupancy Approval | 12/7/2007 | 12/7/2007 | 6/23/2006 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | PART |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Reveiwed special inspection reports, noted that allwelding has been inspected. Received and reviewed letter from architect noting that partition wallls need only be one hour fire rating due to occupncy requirement, Also gave IBC table 720.1 item No. 15-1.16 and item 15-1.14 for 1hour construction.
|
BLD-Framing/Rough-in | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | PART |
Mike Jordan
|
|
|
Todd; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Exteroir steel stud walls and shear nailing. Needs to get special insp. on welding for steel studs.
|
BLD-Foundation | 2/2/2006 | 2/3/2006 | 2/3/2006 | A | PART |
Jim Sly
|
|
|
dick Note: around 11:00; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Sono tube sections above interior pads OK Pending special insp (Geotect) reviewing new Engineering, inspecting, testing and approvals.
|
BLD-Footing | 1/9/2006 | 1/10/2006 | 1/10/2006 | A | PASS |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Perimeter stemwalls. Soils work still required on interior portion of pad.
|
BLD-Footing | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PART |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. West and south stemwalls, north footing. wip.
|
BLD-Footing | 12/20/2005 | 12/20/2005 | 12/20/2005 | P | PART |
Mike Jordan
|
|
|
as soon as possible//dick waltz; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. concrete already placed when on site. rebar and conc insp by special inspector. ok
|
BLD-Footing | 12/12/2005 | 12/13/2005 | 12/13/2005 | A | PART |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Contractor to get geo-tech report and have engineer inspect bottom og footing prior to building forms and reinforcement.
|
(F) Reprint permit | | | 12/5/2005 | | |
|
|
|
|
Telephone call | | | 12/2/2005 | | DONE |
|
|
|
called ###-#### and left voicemessge that permit is ready and fees
|
Issue PAID IN FULL permit | | | 12/2/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 10/10/2005 | 10/10/2005 | 12/1/2005 | | PASS |
|
|
|
12/1/2005 13:41:19 JCM - activity updated through activity BLDA022 from case BLD05-02746.
|
Routing - PUBLIC WORKS | 11/30/2005 | | 12/1/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/1/2005 | | 12/1/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/1/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/1/2005 | | DONE |
|
|
|
|
Routing - PLUMBING | 11/28/2005 | | 11/30/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 11/30/2005 | | 11/30/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 11/3/2005 | | 11/28/2005 | | |
|
|
|
|
Plan resubmittals received | | | 11/28/2005 | | |
|
|
|
Received (3) copies of sheet P-1and P-2. Routed to John M.
|
Routing Off Site - STRUCTURAL | 11/10/2005 | | 11/16/2005 | | PASS |
|
|
|
Received a faxed letter from the consulting structural engineer approving the structural revisions. JCM
|
Plan resubmittals received | | | 11/14/2005 | | |
|
|
|
Received (3) copies of sheet C3.01 and (2) copies of sheet C1.01, S0.1, S1.01, S1.02, S2.01, S2.02, S2.03, S2.04, S2.05 and S2.06. Routed to John M.
|
Plan resubmittals received | | | 11/9/2005 | | DONE |
|
|
|
Received 2 plan check review comments, & 1 copy of sheets C1.01,S0.1,S1.01,S1.02,S2.01,S2.02,S2.03,S2.04,S2.05,S2.06 Taken to John M.
|
Routing - Erosion and Sediment | 11/2/2005 | | 11/3/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
1st review completed | | | 11/2/2005 | | FAIL |
|
|
|
failed plan check and plumbing.
|
1st review completed | | | 11/2/2005 | | FAIL |
|
|
|
FAILED ESC PLUMBING STRUCTURAL.
|
Routing - PLAN CHECK | 11/2/2005 | | 11/2/2005 | | |
|
|
|
|
Routing - FIRE | 10/24/2005 | | 11/1/2005 | | PASS |
|
|
|
10/28/05 - Plans routed to FV.
|
Plan resubmittals received | | | 10/25/2005 | | |
|
|
|
Received (2) copies of sheet C1.02 (ESC Plan) and (2) sets of the ESC Narrative. Routed to John M.
|
Routing - PLAN CHECK | 10/21/2005 | | 10/24/2005 | | PASS |
|
|
|
John M.
|
Plan Reviewer's activity | | | 10/21/2005 | | PASS |
|
|
|
Plans reviewed and approved as submitted. JCM
|
Routing - PLANNING | 10/17/2005 | | 10/21/2005 | | PASS |
|
|
|
Sara S. Approved per DRH05-00190.
|
Plan resubmittals requested | | | 10/19/2005 | | DONE |
|
|
|
Faxed the archtiect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 10/10/2005 | | 10/18/2005 | | FAIL |
|
|
|
Called PDQ for pick up - received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLUMBING | 10/14/2005 | | 10/17/2005 | | FAIL |
|
|
|
PIPE T&P DRAIN TO AN APPROVED LOCATION. THERMOL EXPANTION PROTECTION REQUIRED. SERVICE SINK REQUIRED IN SPACE "C".
|
Routing - Erosion and Sediment | 10/14/2005 | | 10/14/2005 | | FAIL |
|
|
|
ESC plan does not meet requirements per BMC 8-17. Checklist completed and faxed to PD. Re-submittals required.
|
Routing - PUBLIC WORKS | 10/10/2005 | | 10/14/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/10/2005 | | 10/10/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/10/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/10/2005 | | |
|
|
|
|
Application received | | | 10/4/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/4/2005 | | |
|
|
|
|