Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02750
StatusFinaled
Name CITYSIDE LOFTS LLC
Site Address 412 S 13TH ST
Project NamePlaza Mixed Used-Residential
Customer Number 
ePlanReviewNo
Description
Plaza Mixed Used - (Section 2 of 2) A two hour fire wall (also used as a horizontal exit) will be constructed to divide this 42 unit, 61,812 sq.ft. 5 story, wood framed apartment building into two separate buildings, above a Type I-A parking garage, per City Ordinance 4-16. This portion of the building contains 17 units, and is 25,764 sq. ft. Refer to BLD 05-02204 for the other side of the fire wall. Refer to BLD 05-00926 for for the parking garage. Refer to BLD 06-00693 for the north building. NOTE: This building is fully fire sprinklered per NFPA 13 per Boise City Ordinance. All construction per the approved plans and attached comment list. MJP DRH 04-00241 CUP 04-00087.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/24/2015 DONE
Second Notice BLD9/13/20079/13/20079/13/2007 DONE
First Notice has not been responded to.
First Notice 8/23/20079/13/2007 DONE
Permanent Occupancy  8/23/2007 DONE
BLD-Final8/2/20078/2/20078/3/2007PPASS
DetailsDave Hannah
ok for perm occ
FIRE-Final Inspection8/2/20078/2/20078/2/2007PPASS
DetailsForrest France
Fire life safety finaled.
Meeting  7/27/2007 DONE
Per onsite meeting 7/27/07, Deputy Chief Dave Hanneman, Fire Marshal, approved standpipes in stairwells only, as acceptable to serve the horizontal exit separating section 1and Section 2.
BLD-Final7/19/20077/20/20077/20/2007ANR
DetailsDave Hannah
daryl Phone #: ###-#### need fire doors at horz exit fixed and stand pipe issue resolved and ok from fire on alarms and spinklers
Case Summary (BLD)  7/20/2007  
Code Occupancy Approval  7/19/2007 DONE
Meets plan requirements
BLD-Final5/1/20075/1/20075/1/2007PPART
DetailsDave Hannah
daryl; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ
FIRE-Final Inspection5/1/20075/1/20075/1/2007PNR
DetailsForrest France
daryl - fire life safety - as early as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
FIRE-Final Inspection5/1/20075/1/20075/1/2007 PART
Approved for TOC.
Temporary occupancy  5/1/2007 DONE
Temp. Occ. Cert. # 5576 issued 5-1-07 to the Cityside Lofts.
BLD-Final4/27/20074/30/20074/30/2007AFAIL
DetailsDave Hannah
Darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs other trades finaled
BLD-Framing/Rough-in1/23/20071/24/20071/24/2007ADONE
DetailsDave Hannah
darrel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in1/22/20071/23/20071/24/2007ADONE
DetailsDave Hannah
darrel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in1/8/20071/9/20071/9/2007APART
DetailsDave Hannah
darrell ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith first floor corrador ok to cover
BLD-Energy code compliance12/29/200612/29/20061/2/2007PPASS
DetailsDave Hannah
Daryl; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett first and second floor
BLD-Energy code compliance12/20/200612/20/200612/20/2006PPART
DetailsDave Hannah
Daryl; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett ok to cover second floor appartments
BLD-Framing/Rough-in12/14/200612/15/200612/15/2006APART
DetailsDave Hannah
daryl ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to insulate 1st and 2nd floor
BLD-Framing/Rough-in12/6/200612/6/200612/7/2006PNR
DetailsDave Hannah
daryl ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/29/200611/30/200611/30/2006APART
DetailsDave Hannah
darrell ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover third floor
BLD-Energy code compliance11/22/200611/24/200611/24/2006APART
DetailsDave Hannah
DARRELL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover third floor room walls
BLD-Framing/Rough-in11/17/200611/20/200611/20/2006APART
DetailsDave Hannah
Darrel; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to insulate the third floor
BLD-Other11/14/200611/15/200611/15/2006APART
DetailsDave Hannah
darrell Note: drywall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles first layer of rock 4thand 5th flr
BLD-Energy code compliance11/7/200611/8/200611/8/2006APART
DetailsDave Hannah
daryl ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover 4th floor rooms only
BLD-Framing/Rough-in11/1/200611/2/200611/2/2006APART
DetailsDave Hannah
Daryl; Phone #: ###-#### Internet Inspection Request from: Letitia Gallop ok to insulate the 4th and 5th floor units
BLD-Conference7/13/20067/17/20067/17/2006APASS
DetailsDave Hannah
meet dixie at 9 am Internet Inspection Request from: Barbara Buckley walked project with dixie and mec contractor
BLD-Conference6/8/20066/9/20066/9/2006ADONE
DetailsDave Hannah
request per Dixie for her and Troy to do a conference
BLD-Conference6/8/20066/9/20066/9/2006ADONE
DetailsTroy James
request per Dixie for her and Troy to do a conference
Issue PAID IN FULL permit  3/23/2006 DONE
Print Occupancy Form  3/20/2006 DONE
Print Occupancy Form  3/17/2006 DONE
Plan assigned to (M_P)10/4/200510/4/20053/16/2006 PASS
3/16/2006 16:08:12 M_P - activity updated through activity BLDA022 from case BLD05-02750.
Routing - PLAN CHECK3/7/2006 3/16/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/16/2006 DONE
Override - Parcel Holds  3/16/2006  
Print Pending Permit.LaserJet4  3/16/2006 DONE
Case Summary (BLD)  3/16/2006 DONE
Plan resubmittals received  3/8/2006  
Received 1 copy of Plan review response letter, 1 copy of revised Supplemental Structure calcs for metal decks, 3 copies of the following- A1.1, A8.0, A9.0, A10.0, A10.2, M1.0, M1.1, M1.2, M1.3, E1.0, E2.0, E3.0, E4.0, E5.0, E6.0, E7.0, E8.0 and taken to Mike P.
Routing - PLAN CHECK2/10/2006 3/7/2006 FAIL
Second review failed, talked to architect and requested additional plans to be submitted to clarify items discussed in our meeting. Further review required prior to issuing permit.
Routing - PLUMBING3/7/2006 3/7/2006 PASS
no changes
Routing Off Site - STRUCTURAL2/21/2006 3/3/2006 PASS
No further reveiw requried by outside engineering firm.
Called Action Couriers for pick up
Routing - PLANNING2/7/2006 2/9/2006 PASS
Approved.
Routing - PLAN CHECK11/4/2005 2/7/2006  
Routing to Planning.
Plan resubmittals received  1/30/2006  
Received 8 page response letter to review comments, project start up for special inspections package, 2 revised cert of values, response to Architecture review from Treasure valley Engineers letter and 5 pages of calcs, ans 3 pages of each A0.3,A1.0,A1.1,A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A3.0, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A3.7, A3.8, A3.9, A3.10, A3.11, A3.12, A3.13, A3.14, A3.15, A3.16, A3.17, A3.18, A3.19, A3.20, A3.21, A6.1, A6.2, A6.3, A6.4, A6.5, A8.0, A8.1, A9.0, A10.0, A10.1, A10.2, A10.3, M1.0, M1.1, E1.0, E2.0, E3.0, E4.0, E5.0, E6.0, E7.0, E8.0; Taken to Mike Phillips
Plan resubmittals received  12/16/2005 DONE
Received 1 response , & 3 copys of sheets A2.6,A10.0,M1.0,M1.1,M1.2,M1.3 taken to Mike P.
Routing Off Site - STRUCTURAL11/23/2005 12/14/2005 FAIL
Second review failed e-mailed comments to architect.
1st review completed  11/4/2005 FAIL
FAILED BY PLANNING, PLAN CHECK AND MECHANICAL.
Routing - FIRE10/20/2005 11/2/2005 PASS
10/28/05 - Plans routed to FV.
Routing - PLAN CHECK9/2/2005 10/20/2005 FAIL
Plan review complete, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing - MECHANICAL10/20/2005 10/20/2005 FAIL
ROUTED OFF SITE to ICC Plan Review Services for mechanical plan review. (msouthard)
10/20/05 - Received plan review from ICC and sent copy to John Price.
Plan Reviewer's activity  10/4/2005  
Refer to BLD05-02204 for additional comments for routing.
Application received  10/4/2005  
Routing - PLANNING8/29/2005 9/2/2005 FAIL
Phasing application has not been submitted/approved. Original planning applications included office portion of development. Left phone message with John Price, architect, informing him of this action.
Routing - PLUMBING8/19/2005 8/29/2005 PASS
per plans and 2003 upc
Routing - Erosion and Sediment8/19/2005 8/19/2005 PASS
ESC plan approved with attached conditions--Under ESC05-00569.
Routing - PUBLIC WORKS8/17/2005 8/19/2005 PASS
Routing - PLANNING Land Div8/16/2005 8/17/2005 PASS
approved as tract a on ros 5113.