Permit Information
Permit NumberBLD05-02752
StatusFinaled
Name C H DEVELOPMENT
Site Address 1549 N CORMORANT PL
Project NameHolbrook Bldg
Customer Number 
ePlanReviewNo
Description
The Mortgage Company (Tenant Improvement) - To finish a new 4,335 square foot office tenant space. This is tenant space "A" in the new Holbrook Shell Building. These tenant spaces are being separated by two-hour fire-resistive demising walls. These walls are per the approved plans and are not code required. This building is fully fire sprinklered for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/3/2007  
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 10/11/200612/27/2006 DONE
Permanent occupancy  10/11/2006 DONE
Perm. Occ. Cert. # 11245 issued 10-11-06 to The Mortgage Company.
BLD-Final6/27/20066/27/20066/27/2006PPASS
DetailsMike Jordan
todd; Phone #: ###-#### Internet Inspection Request from: Cathy. ok for perm occ.
FIRE-Final Inspection6/26/20066/26/20066/27/2006PPASS
DetailsTroy Cobbley
life safety finaled
Permanent Occupancy 6/27/20066/27/2006 DONE
Details
BLD-Final6/23/20066/23/20066/23/2006PNR
DetailsMike Jordan
Tod; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection6/23/20066/23/20066/23/2006PCANC
DetailsTroy Cobbley
Cancelled at the contractors request.
BLD-Framing/Rough-in6/20/20066/20/20066/20/2006PPASS
DetailsMike Jordan
todd - ceiling insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Framing/Rough-in5/14/20065/15/20065/15/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/14/2006 at 1:07:04 PM. Contact: ###-####. energy code also ok.
BLD-Framing/Rough-in5/11/20065/11/20065/11/2006PNR
DetailsMike Jordan
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. East exterior wall and south exterior wall has been insulated. ok to cover. Partition walls not complete.
BLD-Framing/Rough-in5/10/20065/10/20065/10/2006AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/10/2006 at 7:15:51 AM. Contact: ###-####.Putty pads required on stell boxes at 1hr walls. Stuff flutes with steel wool at 1 hr walls. and insulate at stell joist for fire blocking. Fire caulk joints at penetrations or fill with mud at 1 hr walls. ok to insul. pending elec.
CHANGE STATUS TO (ISS)  4/19/2006 DONE
fees paid on plan mod and picked up
(F) Reprint permit  4/19/2006 DONE
Print Occupancy Form  4/19/2006 DONE
Override - Parcel Holds  4/18/2006  
Inspection Record Card- Bld  4/18/2006 DONE
Override - Parcel Holds  4/18/2006  
Permit Ready to Issue  4/18/2006 DONE
Telephone call  4/18/2006 DONE
TLK TO JAMES GIPSON ###-#### THAT PERMIT AND FEES ARE READY TO BE PICKED UP NEEDS RCE #
Plan assigned to (JCM)4/13/20064/13/20064/17/2006 PASS
4/17/2006 14:21:17 JCM - activity updated through activity BLDA022 from case BLD05-02752.
Plan Reviewer's activity  4/17/2006 PASS
Reviewed and approved plan modification to increase the area of this tenant space from 3,350 square feet to 4,335 square feet. this modification is to add two new office spaces a breakroom, file room and work room. The plan is also being modified to enlarge offices A & B by deleting office C. The increase area is being taken out of future tenant space "B".
Routing - PUBLIC WORKS4/17/2006 4/17/2006 PASS
Routing - PLAN CHECK4/13/2006 4/17/2006 PASS
Routing - PLAN CHECK4/17/2006 4/17/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/17/2006 DONE
Plan Modification Accepted  4/13/2006 DONE
Plan modification accepted for BLD05-02752 for the redesign of adding 3 additional offices and a breakroom. Delete wall in office change 3 others to offices on sheets A-1, M-1, E-1, E-2, E-3 and routed to John M.
BLD-Aging Inspection3/13/20063/13/20063/13/2006 NR
DetailsMike Jordan
Shell and core construction is still in progress.
Print Occupancy Form  12/2/2005 DONE
Permit Ready to Issue  12/2/2005  
Telephone call  12/2/2005 DONE
called ###-#### and left voicemessge that permit is ready and fees
Issue PAID IN FULL permit  12/2/2005 DONE
Routing - PUBLIC WORKS11/30/2005 12/1/2005 PASS
Routing - PLAN CHECK12/1/2005 12/1/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/1/2005 DONE
Plan assigned to (JCM)10/7/2005 12/1/2005 PASS
12/1/2005 13:43:17 JCM - activity updated through activity BLDA022 from case BLD05-02752.
Routing - PLUMBING11/28/2005 11/30/2005 PASS
Routing - PLAN CHECK11/30/2005 11/30/2005  
Routing - PLAN CHECK11/2/2005 11/28/2005  
1st review completed  11/2/2005 PASS
Routing - FIRE10/24/2005 10/31/2005 PASS
10/28/05 - Plans routed to FV.
Routing - PLAN CHECK10/21/2005 10/24/2005 PASS
Plan Reviewer's activity  10/21/2005 PASS
Plans reviewed and approved as submitted. JCM
Plans ACCEPTED BY PLAN TECH  10/10/2005  
Application received  10/4/2005  
Recd Pcfee & Taken To Pln CK  10/4/2005  
Third Notice BLD1/8/20071/8/2007   
Second Notice has not been responded to.
Fee Review-notes10/4/200510/4/2005