Permit Information
Permit NumberBLD05-02758
StatusFinaled
Name BRIGHTON CORPORATION
Site Address 2791 S VICTORY VIEW WAY
Project NameC2 ENTERPRISES
Customer Number 
ePlanReviewNo
Description
C2 Enterprises (Shell Building) - To construct a 12,941 sq. ft. one story Type VB fully fire sprinkled office retail shell building with three tenant spaces of 1944 sq. ft., 1944, sq. ft. and 9053 sq. ft. Other work includes all site improvements paving and landscaping per approved plans and attachments, DRH05-00232, CUP05-00086. Fire sprinklers used for area, building envelope is done under shell. No occupancy authorized per this permit. Separate plans and permits required for each space. 9053 sq. ft. tenant space is being finished under BLD05-02759.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval7/10/20067/10/20067/10/2006 DONE
Letter of compliance  6/29/2006 DONE
Letter of Compliance issued 6-29-06.
Fee Review-notes10/11/200510/11/20056/13/2006 DONE
BLD-Final6/2/20066/2/20066/2/2006PPASS
DetailsMike Jordan
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. ok for perm occ once others have finaled. ok for temp.
Code Occupancy Approval  6/2/2006 PASS
ALL IN AS REQUIRED FINAL SIGNED OFF.
FIRE-Final Inspection5/30/20065/31/20066/1/2006PPASS
DetailsTroy Cobbley
Life safety finaled. The indicators on the lease spaces exit doors are on the wrong side of the doors and will need to be corrected when tenants move in.
FIRE-Final Inspection5/26/20065/30/20065/30/2006PFAIL
DetailsTroy Cobbley
Bill Davis; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt

Fire extinguishers mounted at 51" should be 48" to lever.

2) Provide emergency lighting for Hall 104 and Hall at office 127

2) Doors to lease spaces 201 and 301 are mounted backwards

4) Final Fire Alarm Permit
Print Occupancy Form  5/30/2006 DONE
Inspection Record Card- Bld  5/26/2006 DONE
BLD-Other5/12/20065/15/20065/15/2006APASS
DetailsMike Jordan
ceiling grid insp//bill; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Ceiling grid is as per plan and cisca.
BLD-Wall cover5/11/20065/12/20065/12/2006PFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ceiling grid inspection not per plan or cisca crew rivited two sides no pods
BLD-Energy code compliance3/24/20063/27/20063/27/2006PPART
DetailsMike Jordan
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in3/23/20063/24/20063/24/2006PPART
DetailsMike Jordan
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Interior framed walls from grids E to H and grids 3 to 6.
BLD-Other2/6/20062/7/20062/7/2006APASS
DetailsTom Arcoraci
doug Note: rebar; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles mti on site
BLD-Other2/2/20062/3/20062/3/2006APART
DetailsMike Jordan
Doug -- masonry wall; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. wip North wall 4ft. to 8ft. elev.
BLD-Other2/1/20062/2/20062/2/2006APART
DetailsMike Jordan
grout pour inspection//doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. rebar not yet installed when on site. reveiwed special insp. reports while on site.
BLD-Footing12/21/200512/22/200512/22/2005APART
DetailsMike Jordan
re-bar inspection pouring at 12:30//doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing12/13/200512/14/200512/14/2005PPASS
DetailsMike Jordan
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter footings.
(F) Reprint permit  11/30/2005  
Issue PAID IN FULL permit  11/29/2005  
Routing Off Site - STRUCTURAL11/17/2005 11/28/2005 PASS
Routing - PLAN CHECK11/18/2005 11/28/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/28/2005 DONE
Permit Ready to Issue  11/28/2005 DONE
Inspection Record Card- Bld  11/28/2005 DONE
Telephone call  11/28/2005 DONE
left mess for pete rockwell at ###-#### is ready & need achd
Plan assigned to (MLO)10/11/2005 11/28/2005 PASS
11/28/2005 09:49:28 MLO - activity updated through activity BLDA022 from case BLD05-02758.
Routing - Erosion and Sediment11/17/2005 11/18/2005 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK11/17/2005 11/17/2005 PEND
pending structural review
Plan resubmittals received  11/16/2005  
Received (1) united water letter and (1) copy of structural calcs (sheets 1-8) and (3) copies of sheet C-1.0, C-2.0, A-1.1, A-6.1, S0.1, S2.1, S5.1, S7.2, P-1.0, P-2.0, P-3.0, E-1.0, E-1.1, E-1.1A, E-1.2, E-1.3 and E-2.0. Routed to Mike O.
1st review completed  11/9/2005 FAIL
failed plan check, ESC and structural.
Routing - PLAN CHECK11/9/2005 11/9/2005 PEND
Routing - FIRE10/26/2005 11/9/2005 PASS
Routing - PLAN CHECK10/18/2005 10/26/2005 FAIL
corrections sent to architect
Routing Off Site - STRUCTURAL10/11/2005 10/26/2005 FAIL
corrections sent to architect.
Plan resubmittals requested  10/26/2005 DONE
For IBC corrections
Plan resubmittals received  10/20/2005  
Received (4) ESC plans and (2) narratives. Routed to Mike O.
Routing - PLANNING10/13/2005 10/18/2005 PASS
Approved per DRH05-00232. (MGS, 10-17-05)

Cody R. CUP05-00086
Approved per CUP05-00086. (C.R., 10-18005)
Routing - PLUMBING10/13/2005 10/13/2005 PASS
verify thermol expantion protection sizing. pvb required on hand held eyewash. label nonpotable water system per upc.
Routing - Erosion and Sediment10/12/2005 10/13/2005 FAIL
ESC plan does not meet requirements per BMC 8-17.
Routing - PUBLIC WORKS10/11/2005 10/12/2005 PASS
Routing - PLANNING Land Div10/11/2005 10/11/2005 PASS
Final Plat recorded in May 2001.
Plans ACCEPTED BY PLAN TECH  10/11/2005  
Plan routing begun/NEW & ADDTN  10/11/2005  
Pending Assignment by MYS10/11/2005 10/11/2005 DONE
10/11/2005 09:25:48 JCM - activity updated through activity BLDA174 from case BLD05-02758.
Recd Pcfee & Taken To Pln CK  10/11/2005  
Application received  10/4/2005