Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02760
StatusFinaled
Name TRIPLE S CONSTRUCTION
Site Address 2646 S VIRGINIA ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1208sq.ft., Three Bedroom, Two and a half bathroom, Two story single family dwelling (823sq.ft. Main floor / 385sq.ft. Lower floor) with a 434sq.ft. Attached two car garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-1C setbacks/Zoning as per E.G. with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/11/20067/12/20067/12/2006APASS
DetailsDave Hannah
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
DOC - Permit Finaled7/12/20067/12/20067/12/2006PPASS
DetailsDave Hannah
BLD-Final6/28/20066/30/20066/30/2006AFAIL
DetailsMike Jordan
Chris ###-####//call for access info. Install address numbers. complete grading. Install smokeseal on door from R to U occ.c/n posted.
BLD-Framing/Rough-in5/9/20065/10/20065/10/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/9/2006 at 3:43:23 PM. Contact: ###-####.
BLD-Energy code compliance5/10/20065/10/20065/10/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/9/2006 at 3:43:23 PM. Contact: ###-####.
BLD-Framing/Rough-in4/25/20064/25/20064/25/2006PPART
DetailsJim Storey
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesneed truss engineering.
BLD-Foundation2/8/20062/9/20062/9/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/8/2006 at 8:46:14 AM. Contact: ###-####.
BLD-Footing2/8/20062/8/20062/8/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/8/2006 at 8:45:52 AM. Contact: ###-####.
Plan assigned to (SRZ)11/29/200511/29/200511/30/2005 PASS
11/30/2005 08:34:40 SRZ - activity updated through activity BLDA022 from case BLD05-02760.
Routing - PLAN CHECK11/21/2005 11/30/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/30/2005 DONE
Permit Ready to Issue  11/30/2005 DONE
Inspection Record Card- Bld  11/30/2005 DONE
Issue PAID IN FULL permit  11/30/2005 DONE
Plan assigned to (SAM)10/4/200510/4/200511/29/2005 DONE
Case Summary (BLD)  11/29/2005  
Routing - PLANNING10/13/2005 11/8/2005 PASS
correction to site plan - deed legal description lists 50' wide street frontage.
Routing - PUBLIC WORKS10/6/2005 10/7/2005 PASS
Routing - PLANNING Land Div10/5/2005 10/6/2005 PASS
Zoning Verification / Buildable Parcel letter from Evelyn Grime submitted on 10/10/05.
Application received  10/4/2005