BLD-Conference | 9/27/2006 | 9/27/2006 | 9/27/2006 | P | PASS |
Mike Jordan
|
|
|
mike could you call me regarding this permit. it was finaled by tom, but the fence guy needed to get a fence permit , so my final could be complete, i need to know if this has all been done to clear this out, thanks; Phone #: ###-#### Internet Inspection Request from: larry hobbs
|
DOC - Permit Finaled | 9/27/2006 | 9/27/2006 | 9/27/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 9/27/2006 | 9/27/2006 | 9/27/2006 | P | PASS |
Mike Jordan
|
|
|
mike could you call me regarding this permit. it was finaled by tom, but the fence guy needed to get a fence permit , so my final could be complete, i need to know if this has all been done to clear this out, thanks; Phone #: ###-#### Internet Inspection Request from: larry hobbs
|
Case Summary (BLD) | | | 8/21/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/21/2006 | | DONE |
|
|
|
Modified existing building permit to include finishing basement and bonus room as per correction notice.(SRZ)
|
Case Summary (BLD) | | | 8/21/2006 | | |
|
|
|
|
BLD-Final | 8/17/2006 | 8/18/2006 | 8/18/2006 | A | FAIL |
Tom Arcoraci
|
|
|
mike could you call me so i can set a time to meet you at this job site for the final,thanks larry; Phone #: ###-#### Internet Inspection Request from: larry hobbss to update permit for bonus room and basement drywall and elec also over 6 ft fence around basketball court all other items ok for final
|
BLD-Final | 8/10/2006 | 8/11/2006 | 8/11/2006 | P | NR |
Mike Jordan
|
|
|
mike: home will be open all day i will be there after 1 p.m. thanks; Phone #: ###-#### Internet Inspection Request from: larry hobbs. No driveway, no insp. was done.
|
BLD-Wall cover | 4/27/2006 | 4/28/2006 | 4/28/2006 | P | PASS |
Mike Jordan
|
|
|
insulation inspection; Phone #: ###-#### Internet Inspection Request from: larry hobbs. All framing issues have been resolved.
|
BLD-Framing/Rough-in | 4/15/2006 | 4/21/2006 | 4/21/2006 | A | FAIL |
Mike Jordan
|
|
|
mike i will be out of town this day, so my siding contractor will place plans and truss info on the job site. if you have any questions please call ###-####.vicki should be able to help you i hope thanks; Phone #: ###-#### Internet Inspection Request from: larry hobbs. Place additional studs at paralam were top plates were removed. Provide redwood shims or additional studs under ml beam ion basement. Provide header at doorway next to stairs. Fireblock doublewall by garage.
|
BLD-Foundation | 1/11/2006 | 1/12/2006 | 1/12/2006 | P | PART |
Mike Jordan
|
|
|
jose ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. wip
|
BLD-Footing | 1/9/2006 | 1/11/2006 | 1/10/2006 | P | PASS |
Mike Jordan
|
|
|
this is request for a footing inspection for 2p.m.; Phone #: ###-#### Internet Inspection Request from: larry hobbs. inspection performed on 1/10/06.
|
BLD-Foundation | 11/16/2005 | 11/17/2005 | 11/17/2005 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/16/2005 at 1:30:07 PM. Contact: ###-####.. C/N left on site stating compaction requirements if soil is used in leiu of drain rock.
|
BLD-Footing | 11/10/2005 | 11/14/2005 | 11/14/2005 | A | PASS |
Mike Jordan
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Issue PAID IN FULL permit | | | 10/26/2005 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 10/19/2005 | 10/19/2005 | 10/21/2005 | | PASS |
|
|
|
10/21/2005 10:36:29 SRZ - activity updated through activity BLDA022 from case BLD05-02766.
|
Routing - PLAN CHECK | | | 10/21/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2005 | | DONE |
|
|
|
ONE SET RED-LINED.
|
Inspection Record Card- Bld | | | 10/21/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/21/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/21/2005 | | DONE |
|
|
|
called ###-#### and told her permit is ready, did not want to know fees
|
Case Summary (BLD) | | | 10/20/2005 | | |
|
|
|
|
Plan assigned to (SAM) | 10/5/2005 | 10/5/2005 | 10/19/2005 | | DONE |
|
|
|
|
Routing - PLANNING | 10/13/2005 | | 10/13/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/10/2005 | | 10/10/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/5/2005 | | 10/7/2005 | | PASS |
|
|
|
|
Application received | | | 10/5/2005 | | |
|
|
|
|