Permit NumberBLD05-02779
StatusFinaled
Name JORDINE MARK A
Site Address 1200 S LINCOLN AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
"8/118/2006 THIS PERMIT IS MODIFIED TO REFLECT THE ROOM DESIGNATION AND FLOOR LAYOUT CHANGES TO THIS SINGLE FAMILY DWELLING THESE CHANGES ARE APPROVED AS MARKED BY CARL MILLER (PLANNING ANALYST II PEP 8/18/2006.This project is for the relocation of an existing "duplex" located at 1105 S. Vermont St. to 1200 S. Lincoln Ave and remodel same to convert it to a single family dwelling all per the approved plans as marked and plan review notes. The pre-moving inspection was done under MIS05-00151 and a $3,000 bond was required for the foundation and code compliance on the new site. BND05-00147. The above MIS permit was applied for on 9/13/2005 and the permit to place the dwelling was accepted on 10/06/2005. Separate electrical, plumbing, mechanical and ESC permits are required. R-2D zone Design Review is not required as it is to be a "single family dwelling" per Angela Brocious of the Planning Division. Legal lot verification was done by David Abo 10/21/2005. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/8/20069/8/20069/8/2006PPASS
DetailsJim Storey
mark - late afternoon; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
DOC - Permit Finaled9/8/20069/8/20069/8/2006PPASS
DetailsJim Storey
Routing Walk-In (BLD)8/18/20068/18/20068/22/2006PPASS
BLD-Framing/Rough-in8/9/20068/10/20068/10/2006PNR
DetailsJim Storey
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
MISC ACTIONS  5/19/2006 PART
DetailsBob Archibald
Notice of certified mail receipt returned dated 5/17/06.
MISC ACTIONS  5/19/2006 PASS
DetailsBob Archibald
Check #379 received for payment of Construction Site Monitoring Services.
BLD-Conference5/11/20065/12/20065/12/2006APASS
DetailsJim Storey
MARK; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
MISC ACTIONS  5/5/2006 PART
DetailsBob Archibald
N&O mailed by certified and regular mail to Mark J. for payment of site monitoring services.
BLD - Request for Extension4/28/20064/28/20065/2/2006 PART
DetailsBob Archibald
###-#### - mark. Permit valid for 180 days since foundation placement.
BLD-Other4/11/20064/11/20064/11/2006PPASS
DetailsBob Archibald
Structure has been placed on permanent footing and foundation, Council declared hazard has been abated. Fence and security lighting contracts voided. Site security monitoring shall continue until end of 30 day contract at that time fees will be assessed against property.
BLD-Foundation4/4/20064/4/20064/4/2006PPASS
DetailsJim Storey
Concrete placed in foundation forms.
BLD-Other3/27/20063/27/20063/27/2006PPART
DetailsJim Storey
Concrete has been placed for footings and formwork removed.
BLD-Footing3/20/20063/21/20063/21/2006APASS
DetailsJim Storey
###-####
MISC ACTIONS  3/21/2006 PART
DetailsBob Archibald
Council declared structure a nuisance at public hearing and requested staff to install fence, security lighting and site monitoring. Contractor had failed to meet construction schedule that he had provided.
BLD-Footing3/17/20063/20/20063/20/2006AFAIL
DetailsTony Young
joe; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
reviewed plans not on site,, c/n posted to that effect,, also property lines need to be stung up to verify setbacks on next inspection,, do not pour any concrete
BLD-Other3/13/20063/13/20063/13/2006APART
DetailsBob Archibald
Safety fence installed around property.
BLD-Other3/8/20063/8/20063/8/2006APART
DetailsBob Archibald
Phone conference with Mike Harrison, Requested safety fence around structure.
MISC ACTIONS  3/8/2006 PART
DetailsBob Archibald
Certified mail to Mark Jordine, Apple address, returned unclaimed.
MISC ACTIONS  3/7/2006 PART
DetailsBob Archibald
Public hearing defered till 3/21/06. Contractor has supplied a construction schedule.
Case Summary (BLD)  2/24/2006  
MISC ACTIONS  2/21/2006 PART
DetailsBob Archibald
Leagal notice of Public Hearing mailed and published 2/18/06, structurewas also posted with notice. I contacted Mike H. to ask why the delay and his response was: "The attorney said let the City tear em down."
MISC ACTIONS  2/21/2006 PART
DetailsBob Archibald
Certified mail notice to Mark Jordine returned undelivered.
MISC ACTIONS  2/13/2006 PART
DetailsBob Archibald
Return of certified notice received by Mike Harrison.
BLD-Other2/8/20062/8/20062/7/2006PPART
DetailsBob Archibald
Notice to abate sent by certified and regular mail to owner/contractor, structure also posted with CN.
Case Summary (BLD)  2/6/2006  
BLD-Conference1/19/20061/19/20061/19/2006APART
DetailsJim Storey
Conference with Mike H. he is in receipt of CN and informes me that footing/foundation will be completed within 10 days and that weather, soil conditions and the holidays have delayed project.
BLD-Other1/17/20061/17/20061/17/2006PFAIL
DetailsJim Storey
Left CN requiring permanent footing/foundation or security fence construction within 10 days.
Case Summary (BLD)  12/30/2005  
Issue PAID IN FULL permit  11/1/2005 DONE
Inspection Record Card- Bld  10/31/2005 DONE
Permit Ready to Issue  10/31/2005 DONE
Telephone call  10/31/2005 DONE
called ###-#### and left voicemessage for Mark that permit is ready and fees
Plan assigned to (SAM)10/13/200510/13/200510/28/2005 PASS
10/28/2005 09:26:38 PEP - activity updated through activity BLDA022 from case BLD05-02779.
Routing - PLAN CHECK10/27/2005 10/28/2005 PASS
Plan assigned to (PEP)10/26/2005 10/28/2005 PASS
10/28/2005 09:26:38 PEP - activity updated through activity BLDA022 from case BLD05-02779.
Case Summary (BLD)  10/28/2005  
PLANS/APPL TAKEN TO FRONT DESK  10/28/2005 DONE
Routing - PUBLIC WORKS10/26/2005 10/27/2005 PASS
Routing - PLANNING10/26/2005 10/26/2005 PASS
to Angela Brocious
Plan Reviewer's activity  10/25/2005  
spoke with Mike Harrison this a.m. he will bring in the plans as required per conversation 10.21.2005
Plan Reviewer's activity  10/21/2005  
spoke with Mike Harrison floor plans are required and they are to reflect the conversion from a duplex to single family dwelling. Also a copy of the MIS pre inspection by inspector 301 with documentation of the bond requirements and copy of the housing inspection form.
Plan Reviewer's activity  10/21/2005  
spoke with DAA about lot size setbacks etc. lot was 50' wide and street right of way was changed taking 7' from the lot. Still legal lot . Design review not required in the R-2D zone for a single family dwelling per AJB.
Routing - PLANNING10/17/2005 10/19/2005 FAIL
Need building permit to convert duplex to single family dwelling and additional bond to cover the conversion. Any questins call Bob Archibald.
Routing - PLANNING Land Div10/13/2005 10/17/2005 PASS
Application received  10/6/2005