Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD05-02792
StatusIssued
Name AHAMD VAKILI
Site Address 1175 S MAPLE GROVE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
"8/21/07 THIS PROJECT IS MODIFIED TO REFLECT A CHANGE IN THE ROOF STRUCTURE THAT WILL INCLUDE AN OVERBUILD OF THE ROOF AT THE NORTH WEST CORNER CHANGING THE ELEVATION. L-OD OK PBY SARAH SHAFER. 8/21/07" 7/12/2006 THIS PERMIT IS MODIFIED TO REFLECT THE ADDITION OF 338S.F. ABOVE THE ENCLOSED PORCH ON THIS ORIGINAL PERMIT. THIS PROJECT IS APPROVED THROUGH CZC06-00108 & 167 BY CARL MILLER. PEP 7/12/2006" This project is for the construction of a new enclosed porch over an existing foundation, entry meeting the IECC per work sheet attached. R-1A setbacks ok per Cody Riddle. All per the approved plans as marked and plan review notes. Separate electrical mechanical permits are required. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/201711/15/201711/15/2017PFAIL
DetailsMike Jordan
Art-please call 30 minutes prior to meet for access Phone #: ###-####-customer would like to have it as soon as possible in the PM. Electrical final inspection has failed. Also no framing inspections were conducted. Will have to remove all sheetrock and insulation for framing inspections.
Case Summary (BLD)  11/13/2017 DONE
CHANGE STATUS TO (ISS)  11/13/2017 DONE
as per Bob A-ok to change status to iss with a 2 hour fee
BLD-Other11/9/201711/9/201711/9/2017PDONE
DetailsBob Archibald
Ok to reactivate for a final inspection (2hr fee).
BLD-Framing/Rough-in8/21/20078/21/20078/21/2007PPASS
DetailsMike Jordan
matt- wall insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smyl. Framing for added overbuild on roof at north end ok.
Routing Walk-In (BLD)8/21/20078/21/20078/21/2007ADONE
8/21/2007 09:56:37 PEP - activity updated through activity BLDI254 from case BLD05-02792.
Routing Walk-In (Zoning)8/21/20078/21/20078/21/2007ADONE
8/21/2007 10:27:33 PEP - activity updated through activity BLDA022 from case BLD05-02792.
Case Summary (BLD)  8/21/2007  
Inspection Record Card- Bld  8/21/2007  
Inspection Record Card- Bld  8/21/2007  
PLANS/APPL TAKEN TO FRONT DESK  8/21/2007 DONE
CHANGE STATUS TO (ISS)  8/21/2007  
already issued previously
Meeting  8/20/2007 FAIL
QUESTIONS ON STOP WORK ORDER FROM 450
Telephone call  8/17/2007  
call from 450 project beyond the scope of work
Routing Walk-In (BLD)7/12/20067/12/20067/12/2006PDONE
7/12/2006 13:55:50 PEP - activity updated through activity BLDA022 from case BLD05-02792.
Case Summary (BLD)  7/12/2006  
PLANS/APPL TAKEN TO FRONT DESK  7/12/2006 DONE
Inspection Record Card- Bld  7/12/2006  
(F) Reprint permit  7/12/2006 DONE
CHANGE STATUS TO (ISS)  7/12/2006 DONE
Case Summary (BLD)  7/12/2006  
Routing Walk-In (BLD)6/9/20066/9/20066/9/2006ADONE
6/9/2006 13:12:32 PEP - activity updated through activity BLDI254 from case BLD05-02792.
Routing Walk-In (Zoning)6/9/20066/9/20066/9/2006PFAIL
modify permit add front upper level extension towards front of lot.

The zone of this project is now L-OD and not R-1A as original permit. Applicant needs to submit applicantion for an expansion of a non-conforming use and a zoning cert.pep 1:12 p.m. 6/9/2006
Routing Walk-In (BLD)6/6/20066/6/20066/6/2006APASS
questions on adding on second story to permit

plans are ok for submittal this addition project. still need zoning signoff...6/9/2006 pep
Case Summary (BLD)  6/6/2006  
Case Summary (BLD)  6/6/2006  
Application received  10/6/2005  
Plan assigned to (PEP)10/6/2005 10/6/2005 PASS
10/6/2005 14:26:59 PEP - activity updated through activity BLDA022 from case BLD05-02792.
Case Summary (BLD)  10/6/2005  
PLANS/APPL TAKEN TO FRONT DESK  10/6/2005 DONE
Inspection Record Card- Bld  10/6/2005 DONE
Issue PAID IN FULL permit  10/6/2005