BLD-Final | 7/21/2006 | 7/21/2006 | 7/21/2006 | P | PASS |
Dave Hannah
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
DOC - Permit Finaled | 7/21/2006 | 7/21/2006 | 7/21/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/20/2006 | 7/20/2006 | 7/20/2006 | P | NR |
Dave Hannah
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs elec final no inspection done
|
BLD-Energy code compliance | 6/2/2006 | 6/2/2006 | 6/2/2006 | P | PASS |
Jim Sly
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Energy code compliance | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | NR |
Tony Young
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok to insulate need mec r/i c/n completed befor cover
|
BLD-Framing/Rough-in | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung needs elec and mec r/i inspections
|
BLD-Footing | 3/30/2006 | 3/31/2006 | 3/31/2006 | A | PART |
Dave Hannah
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong soil signed off by mti and 15 ft front setback oked by zoning
|
BLD-Footing | 3/23/2006 | 3/23/2006 | 3/23/2006 | P | FAIL |
Mike Jordan
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Noted to contractor that a geo-tech engineer would be required to evaluate soils condition. Soil is black, with construction debris throughout its depth. no conc placement is allowed at this time. Also noted that an old basement has been backfilled.
|
Issue PAID IN FULL permit | | | 2/22/2006 | | DONE |
|
|
|
|
Routing - PLANNING | 12/6/2005 | | 2/3/2006 | | FAIL |
|
|
|
Does not meet the 10' interior side yard setback for the R-3D zone. The applicant has submitted a variance. Angie Wood is working on the variance applicationof a feruary hearing date. Plans can be approved once variance is approved.
|
Plan assigned to (SAM) | 10/6/2005 | 10/6/2005 | 12/19/2005 | | PASS |
|
|
|
12/19/2005 09:11:19 PEP - activity updated through activity BLDA022 from case BLD05-02807.
|
Routing - PLAN CHECK | | | 12/19/2005 | | PASS |
|
|
|
|
Plan assigned to (PEP) | 12/19/2005 | | 12/19/2005 | | PASS |
|
|
|
12/19/2005 09:11:19 PEP - activity updated through activity BLDA022 from case BLD05-02807.
|
Case Summary (BLD) | | | 12/19/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/19/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/19/2005 | | DONE |
|
|
|
called ###-#### and told Rob Sr. that permit is ready
|
Plan resubmittals received | | | 12/6/2005 | | DONE |
|
|
|
Builder faxed a copy of the county confirmation information. Plans routed to Land Division.
|
Routing - PLANNING Land Div | 12/6/2005 | | 12/6/2005 | | PASS |
|
|
|
Required information was submitted showing that new parcel numbers have been issued to the two lots.
|
Routing - PLANNING Land Div | 10/7/2005 | | 10/10/2005 | | FAIL |
|
|
|
Applicant / owner must show proof of legal land division. (Provide a copy of the parcel record sheet from the Ada County Assessors Office.) Plans in planning hold drawer.
|
Routing - PUBLIC WORKS | 10/10/2005 | | 10/10/2005 | | PASS |
|
|
|
|
Application received | | | 10/6/2005 | | |
|
|
|
|