Permit NumberBLD05-02812
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 1900 S COLE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Commercial Tire (Building Addition and Restroom Remodel) - To construct a 3520 square foot, one story addition on the east side of the existing 11,035 square foot, one story Commercial Tire, retail and auto repair building. The addition is constructed of masonry exterior walls, concrete slab floor and metal roof. This addition will be used for wheel alignment work and tire storage. This permit also includes the remodel of the existing men's and women's restroom to bring them into compliance with accessibility requirements and to install fire sprinklers throughout the building. This permit also includes related site improvements. The existing portion of this building was constructed in Ada County. This building will be fully fire sprinklered. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/14/20066/14/20066/15/2006 DONE
Second Notice has not been responded to.
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 5/11/20065/25/2006 DONE
Permanent occupancy  5/11/2006 DONE
Perm. Occ. Cert. #11016 issued 5-11-06 to Commercial Tire.
BLD-Final5/9/20065/9/20065/9/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/9/2006 at 7:59:02 AM. Contact: ###-####. ok for perm occ.
FIRE-Final Inspection5/9/20065/9/20065/9/2006PPASS
DetailsTroy Cobbley
Life safety finaled. I pointed out the maximum storage heights and other items to the general contractor. Warehouse was empty during inspection.
Permanent Occupancy 5/9/20065/9/2006 DONE
Details
Temporary occupancy  5/8/2006 DONE
temp. Occ. Cert. #5401 issued 5-8-06 to Commercial Tire.
BLD-Final5/4/20065/5/20065/5/2006PPART
DetailsJim Sly
JIM nOTE: LATE AS POSSIBLE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
OK for Temp Occ. OK for Perm Occ when Fire Perms.
FIRE-Final Inspection5/5/20065/5/20065/5/2006PPART
DetailsTroy Cobbley
A temporary occupancy was given until the signsat the entrances are installed monday
Code Occupancy Approval Temp  5/4/2006 DONE
posted bond for scope of work required by scott brown for $3,250/ 5/4/06/mls
Code Occupancy Approval Temp5/3/20065/3/20065/3/2006PDONE
DetailsScott M.Brown
NEEDS TO BOND FOR PAINT $3250 THEN OK TO SIGN TEMPORARY OCCUPANCY
BLD-Conference3/29/20063/29/20063/29/2006PPASS
DetailsTom Arcoraci
Issue PAID IN FULL permit  2/1/2006 DONE
Telephone call  12/29/2005 DONE
left mess for david blodgett at ###-#### that permit is ready & need achd
Permit Ready to Issue  12/23/2005 DONE
Inspection Record Card- Bld  12/23/2005 DONE
Print Occupancy Form  12/23/2005 DONE
Telephone call  12/23/2005 DONE
talked to david blodgett at ###-#### that permit is ready & need achd
Routing - PLAN CHECK12/14/2005 12/22/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/22/2005 DONE
Plan assigned to (JCM)10/12/2005 12/22/2005 PASS
12/22/2005 10:32:56 JCM - activity updated through activity BLDA022 from case BLD05-02812.
1st review completed  12/14/2005 PASS
Routing - FIRE12/2/2005 12/13/2005 PASS
sent to FV 12/8/05
Routing - PLAN CHECK11/16/2005 12/2/2005  
Plan resubmittals received  12/1/2005 DONE
Received transmittal, 1 letter, 7 3 copys of sheets A1.00, A2.01,E0,E2.0 Taken to John M.
Plan Reviewer's activity  11/17/2005 PASS
Reviewed and approved resubmitted plans and information. JCM
Plan resubmittals received  11/16/2005 DONE
Received 1 letter of transmittal,1 letter,1 technical data sheet,1 Reznor unit heater sheets, & 3 copys of sheets A0.00,A2.20,EC2.01,M1.0 Taken to John M.
1st review completed  11/16/2005 FAIL
failed plan check and fire.
Routing - FIRE11/2/2005 11/16/2005 FAIL
review faxed to architect.
Plan resubmittals requested  11/2/2005 DONE
E-mailed the architect with a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK10/25/2005 11/2/2005 FAIL
John M.
Routing - PLANNING10/21/2005 10/25/2005 PASS
Approved per DRH05-00295.
Routing Off Site - STRUCTURAL10/12/2005 10/24/2005 PASS
Called PDQ for pick up - Received a faxed letter from the consulting structural engineer approving the plans as submitted with one clarification revision requested. JCM
Routing - PLUMBING10/20/2005 10/21/2005 PASS
per plans and 2003 upc.
Routing - Erosion and Sediment10/20/2005 10/20/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS10/18/2005 10/20/2005 PASS
Routing - PLANNING Land Div10/12/2005 10/18/2005 PASS
Recd Pcfee & Taken To Pln CK  10/12/2005  
Plans ACCEPTED BY PLAN TECH  10/12/2005  
Plan routing begun/NEW & ADDTN  10/12/2005  
Application received  10/7/2005  
Fee Review-notes10/12/200510/12/2005