Third Notice BLD | 6/14/2006 | 6/14/2006 | 3/13/2007 | | DONE |
|
|
|
This permit finaled on the web by Matt Smith
|
Second Notice BLD | 4/14/2006 | 4/14/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 3/24/2006 | 3/24/2006 | 4/14/2006 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 3/24/2006 | 3/24/2006 | 3/24/2006 | P | PASS |
Jim Sly
|
|
|
darrin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/C issued
|
DOC - Permit Finaled | 3/24/2006 | 3/20/2006 | 3/24/2006 | A | PASS |
Jim Sly
|
|
|
|
Plan resubmittals received | | | 1/10/2006 | | DONE |
|
|
|
Received letter of transmittal & 2 HP Design Calcs taken to Dan S.
|
Plan resubmittals received | | | 12/6/2005 | | DONE |
|
|
|
Received 2 copies of additional information on the sound wall from the architect and forwarded them to Dan S.
|
BLD-Footing | 11/9/2005 | 11/10/2005 | 11/10/2005 | A | PART |
Jim Sly
|
|
|
darrin ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Met with Darrin to talk about this job. Terricon doing special insp. Approx 10 (column) footings poured.
|
Issue PAID IN FULL permit | | | 11/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/7/2005 | | DONE |
|
|
|
called ###-#### and left voicemessage for John Maulin(arch) that permit is ready and fees
|
Inspection Record Card- Bld | | | 11/4/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/4/2005 | | DONE |
|
|
|
|
1st review completed | | | 11/2/2005 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 10/14/2005 | | 11/2/2005 | | PASS |
|
|
|
11/2/2005 15:06:47 DRS - activity updated through activity BLDA022 from case BLD05-02814.
|
Routing - PLAN CHECK | 10/18/2005 | | 11/2/2005 | | PASS |
|
|
|
Approved as noted on the plans and attached plan review conditions of all reviewing agencies.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2005 | | PASS |
|
|
|
Ready to issue.
|
Telephone call | | | 11/2/2005 | | DONE |
|
|
|
Talked with John Maulin, Architect of Record, to discuss what was to be done concerning the steel column design data and welding requirement for items no listed on plans presented for review. John said the manufacture of the acoustical wall panel system is required to provide engineered design data & calcs to them for those items not specified on the plans and need to be listed as deferred submittals per section 106.3.4.2 of IBC. I told him I would red-line the plans and attach code requirement conditions to the plans.
|
Routing - PLANNING | 10/14/2005 | | 10/18/2005 | | PASS |
|
|
|
Sarah Schafer DRH05-00248
Approved per DRH05-00248.
|
Plans ACCEPTED BY PLAN TECH | | | 10/11/2005 | | |
|
|
|
|
Application received | | | 10/7/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/7/2005 | | DONE |
|
|
|
|
Pending Assignment by MYS | 10/7/2005 | | 10/7/2005 | | DONE |
|
|
|
|
Fee Review-notes | 10/7/2005 | 10/7/2005 | | | |
|
|
|
|