Permit NumberBLD05-02830
StatusFinaled
Name TRUAX COMPANY
Site Address 1006 N 28TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
***MODIFIED EXISTING PERMIT ON 6-12-06 TO INCLUDE: CHANGING EXISTING DETACHED ONE STORY GARAGE TO A 836 SQ.FT. TWO STORY DETACHED GARAGE PER APPROVED PLANS, AND ALL RED-LINING. CVA05-00053 PER H.B.S. WITH PLANNING AND ZONING.***(Rob Truax RCE-6390)To construct a 1377sq.ft. three bedroom, two and a half bathroom, Two story single family dwelling (658sq.ft. Main floor / 719sq.ft. Upper floor) with a 90sq.ft. Covered front porch, and a 418sq.ft. Detached garage located behind the dwelling as per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-3D zoning, setbacks, CVA06 per Angela Wood with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/17/20067/17/20067/17/2006PPASS
DetailsDave Hannah
justin ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
DOC - Permit Finaled7/17/20067/17/20067/17/2006PPASS
DetailsDave Hannah
BLD-Final7/14/20067/14/20067/14/2006PFAIL
DetailsDave Hannah
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs hand rail on stairs to loft above garage also close risers to less than 4 inchs temp glassing up stairs bathroom
(F) Reprint permit  6/13/2006  
Routing - PLAN CHECK6/9/2006 6/12/2006 PASS
Sam Z.
Completed plan review of new detached two story garage. Called Truax Sr. and requested he bring in approved sets and I will attach modified permits. I have the new permits at my desk. (SRZ)
Case Summary (BLD)  6/12/2006  
Routing - PLANNING6/7/2006 6/9/2006 PASS
Hal S. ( PLEASE ROUTE TO SAM Z. WHEN DONE)
BLD-Energy code compliance5/30/20065/30/20065/30/2006PPASS
DetailsDave Hannah
Justin; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in5/25/20065/25/20065/26/2006PPASS
DetailsDave Hannah
justin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate
BLD-Framing/Rough-in5/24/20065/25/20065/26/2006ADEFR
DetailsDave Hannah
justin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing3/30/20063/31/20063/31/2006APART
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong soils has been oked by mti and 15 ft front set oked by zoning
BLD-Footing3/23/20063/23/20063/23/2006PFAIL
DetailsMike Jordan
Jim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Noted to contractor that a geo-tech engineer needs to evaluate soils condition prior to placing footings. Soil is black, with construction debris throughout its depth. Could possibly be an uncontrolled fill area. Also noted that an old basement existed that has been backfilled. conc. placement not allowed at this time.
Issue PAID IN FULL permit  3/21/2006 DONE
Plan assigned to (SRZ)3/15/20063/15/20063/15/2006 PASS
3/15/2006 10:11:59 SRZ - activity updated through activity BLDA022 from case BLD05-02830.
Plan assigned to (SAM)10/11/200510/11/20053/15/2006 DONE
Case Summary (BLD)  3/15/2006  
PLANS/APPL TAKEN TO FRONT DESK  3/15/2006 DONE
Inspection Record Card- Bld  3/15/2006  
Telephone call  3/15/2006  
Informed Robert Truax (Truax Company) ###-#### to pick up permit 3-15-06 eus
Permit Ready to Issue  3/15/2006  
Routing - PLAN CHECK3/9/2006 3/15/2006 PASS
Routing - PUBLIC WORKS3/9/2006 3/9/2006 PASS
Routing - PLANNING3/9/2006 3/9/2006 PASS
Per variance approval.
Plan resubmittals received  12/13/2005 DONE
New pages added to plan set by Rob Truax JR. then taken to Lance E./// DLD
Routing - PLANNING12/13/2005 12/13/2005 FAIL
Resubmitted site plan failed. Side setback is only 8' 6" and needs to be 10' for a two story home in the R-3D zone. Left msg.
Routing - PLANNING10/12/2005 10/13/2005 FAIL
Does not meet 10' side setback for two stories.
Routing - PLANNING Land Div10/12/2005 10/12/2005 PASS
Application received  10/11/2005