BLD-Final | 9/5/2007 | 9/5/2007 | 9/5/2007 | P | PASS |
Jim Sly
|
|
|
Nancy; Phone #: ###-#### Internet Inspection Request from: Hattie James C/C issued
|
DOC - Permit Finaled | 9/5/2007 | 9/5/2007 | 9/5/2007 | P | PASS |
Jim Sly
|
|
|
|
Case Summary (BLD) | | | 3/26/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/26/2007 | | DONE |
|
|
|
|
MISC ACTIONS | | | 3/26/2007 | | |
|
|
|
updated address from 9260 W. Cory Ln. to 9282 W. Goggin Ct and parcel from R3719184449 to R5259430050; mailed out letter and replacement documents to Sue Goggin at 12 Sperry Lode Rd., Boise, ID 83716 //3/26/07 LEG
|
Routing Walk-In (BLD) | 3/5/2007 | 3/5/2007 | 3/5/2007 | A | DONE |
|
|
|
3/5/2007 11:45:30 B_S - activity updated through activity BLDI254 from case BLD05-02836.
|
Routing Walk-In (Zoning) | 3/5/2007 | 3/5/2007 | 3/5/2007 | A | DONE |
|
|
|
3/5/2007 12:01:42 B_S - activity updated through activity BLDI254 from case BLD07-00546.
|
(F) Reprint permit | | | 3/5/2007 | | DONE |
|
|
|
|
BLD-Foundation | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | DONE |
Jim Sly
|
|
|
Jay For grounding; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
Inspection to verify that copper stranded UFER ground was connected to foundation rebar with clamp listed for direct burial in earth or concrete. This house was moved from 9260 Cory lane, and put on new foundation at 9282 Goggin ( a couple of lots away). 9282 Goggin is where I verified UFER ground Completed. Jim Sly.
|
(F) Reprint permit | | | 2/6/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2007 | | |
|
|
|
|
BLD-Foundation | 12/1/2005 | 12/1/2005 | 12/1/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/1/2005 at 7:22:45 AM. Contact: ###-####.
|
BLD-Footing | 11/20/2005 | 11/21/2005 | 11/21/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/20/2005 at 9:12:38 AM.
|
Issue PAID IN FULL permit | | | 10/25/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/19/2005 | | DONE |
|
|
|
called ###-#### and left message for Sue w/Mike that permit is ready, fees, need GC and RP
|
Plan assigned to (SAM) | 10/11/2005 | 10/18/2005 | 10/18/2005 | | PASS |
|
|
|
10/18/2005 13:54:29 SAM - activity updated through activity BLDA022 from case BLD05-02836.
|
Routing - PLAN CHECK | 10/13/2005 | | 10/18/2005 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 10/18/2005 | | DONE |
|
|
|
11:57 I called and talked to Mike about needing the square footage of the home and a bond for the move. Plans are on hold.
|
Case Summary (BLD) | | | 10/18/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/18/2005 | | DONE |
|
|
|
|
Routing - PLANNING | 10/11/2005 | | 10/13/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/13/2005 | | 10/13/2005 | | PASS |
|
|
|
|
Application received | | | 10/11/2005 | | |
|
|
|
|