Permit Information
Permit NumberBLD05-02852
StatusFinaled
Name IDAHO MATERIAL HANDLING
Site Address 2948 S VICTORY VIEW WAY
Project NameNORANDEX
Customer Number 
ePlanReviewNo
Description
(NORANDEX - RACKING) This building is fire sprinklered for area increase. To install racks within the warehouse area (7,738 square feet) of a 8,962 square foot display and warehouse tenant space located within an existing 32,340 square foot, 1 story building. Interior tenant improvements were done under permit BLD05-01927. The work shall comply with the approved drawings, the rack engineering, and all applicable codes. All three exterior doors serving the warehouse area are required to be openable from the egress side without the use of a key or special knowledge or effort. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/15/2005 DONE
Letter of Compliance issued 12-15-05.
BLD-Final12/14/200512/14/200512/14/2005PPASS
DetailsMike Jordan
hilary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. ok for perm occ.
FIRE-Final Inspection12/13/200512/14/200512/14/2005APASS
DetailsTroy Cobbley
Permit finaled
Routing - FIRE12/2/2005 12/12/2005 PASS
DetailsBill Alexander
The system design is approved for current occupancy requested rack use.

Received letter from De Best Fire Protection:
Origignal system design was: .315/2113-ft/2
Incorporating Tyco Model EC-25 EC Area/Density Heads, spaced a maximum of 14'-0" by 14'-0" with 214 degree F temp. (classified as High Temp) for Class IV commodities to a maximum 20'-0". The roof deck is 25'-10" with a commoditiy clearance of 8'-10". Origignal water supply used in the design was 75 psi datic, 20 residual @ 2,800 gpm flow dated 12/23/2003.
BLD-Final12/2/200512/5/200512/5/2005APART
DetailsJim Sly
hillary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Hold downs appear OK. Fire on Temp. OK to (perm) Final when Fire Dept finals. Call Hillary and see if she needs C of C, or just final in computer.
FIRE-Final Inspection11/30/200512/1/200512/1/2005APART
DetailsForrest France
hilary - ###-#### A letter has been provided regarding the density available for the racking installation.
FIRE-Final Inspection11/29/200511/30/200512/1/2005ACANC
DetailsForrest France
No time for inspection.
BLD-Final11/15/200511/17/200511/17/2005PCANC
DetailsMike Jordan
hilary; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. fire/life finaled failed.
FIRE-Final Inspection11/15/200511/17/200511/17/2005AFAIL
DetailsTroy Cobbley
hilary; Phone #: ###-#### Provide verification that the overhead sprinkler system is adequate for the racks and commodities installed per the fire dept racking review comments. Provide height limit signs for the maximum storage height.
Issue PAID IN FULL permit  11/8/2005 DONE
Plan assigned to (CJW)10/20/2005 11/7/2005 PASS
11/7/2005 13:00:33 CJW - activity updated through activity BLDA022 from case BLD05-02852.
Routing - FIRE11/3/2005 11/7/2005 PASS
Bill Alexander-Per some verification required in the review comments.
Routing - PLAN CHECK11/7/2005 11/7/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/7/2005 DONE
Inspection Record Card- Bld  11/7/2005 DONE
Permit Ready to Issue  11/7/2005 DONE
Telephone call  11/7/2005 DONE
called ###-#### (Bill Bode) and ###-#### (Jerry Ricketts) and left voicemessage for both that permit is ready and fees
1st review completed  11/7/2005 DONE
Routing - PLAN CHECK10/20/2005 11/3/2005 PASS
IBC plan review started on November 2 and finished the next day. The drawings and supporting engineering were approved.
Plans ACCEPTED BY PLAN TECH  10/17/2005  
Application received  10/12/2005  
Recd Pcfee & Taken To Pln CK  10/12/2005  
Fee Review-notes10/12/200510/12/2005