Permit Information
Permit NumberBLD05-02870
StatusFinaled
Name GABRIELLI BUILDS INC
Site Address 4485 N TORRIDON WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
(RCE # 1557) To construct a 3306sq.ft. Two story single family dwelling (2725sq.ft. Main floor / 581sq.ft. Unfinished Upper floor) with a 83sq.ft. Covered front porch, a 318sq.ft. Covered rear patio, a 55sq.ft. Covered side concrete patio, and a 987sq.ft. Attached three car garage per approved plans, all red-lining, Engineering, and Plan review report. This lot is within a hillside area and is subject to the hillside ordinance. A class "A" roof system and defensible area will be maintained. R-1B zoning/setbacks as per Carl Miller with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/14/20069/14/20069/14/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 9/14/2006 at 7:05:07 AM. Contact: ###-####.
DOC - Permit Finaled9/14/20069/14/20069/14/2006PPASS
DetailsTony Young
c of o issued
BLD-Grading Inspection9/14/20069/14/20069/14/2006 DONE
Final grading and drainage approved.
BLD-Wall cover5/30/20065/31/20065/31/2006APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 5/30/2006 at 10:43:09 AM. Contact: ###-####.
e. c. ok
BLD-Energy code compliance5/31/20065/31/20065/31/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 5/30/2006 at 10:43:09 AM. Contact: ###-####.
BLD-Framing/Rough-in5/25/20065/26/20065/26/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/25/2006 at 4:25:05 PM. Contact: ###-####.
c/n on tag,, ok to insulate
BLD-Framing/Rough-in5/25/20065/25/20065/25/2006PFAIL
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
conf only,,, list of items to complete for actual frame inspection
BLD-Framing/Rough-in5/24/20065/24/20065/24/2006PNR
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in5/22/20065/22/20065/22/2006PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 5/22/2006 at 7:52:24 AM. Contact: ###-####.
c/n posted,, no not insulate
Inspection Record Card- Bld  4/18/2006 DONE
(F) Reprint permit  4/18/2006 DONE
BLD-Foundation3/20/20063/20/20063/20/2006PPART
DetailsTony Young
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing3/14/20063/15/20063/15/2006APASS
DetailsTom Arcoraci
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
PubWorks Subgrade Approval3/15/20063/15/20063/15/2006 DONE
footing subgrade approved by the geotechnical engineer
BLD-Footing3/13/20063/13/20063/13/2006PNR
DetailsTony Young
Jan; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
need soils report
CHANGE STATUS TO (FEE)  3/3/2006 DONE
ok per Bob A.
Permit Ready to Issue  3/3/2006 DONE
Case Summary (BLD)  3/3/2006 DONE
Issue PAID IN FULL permit  3/3/2006 DONE
VOIDED CHANGE STATUS  2/10/2006 DONE
Highland Building group is not building this home, they are pulling the plans and voiding them per Tracy. Plans designed by Ram-Tech dated 9-27-05 are now null and void. New applications and plans are required for new permit.per Bob Archibald\rad
Inspection Record Card- Bld  11/3/2005 DONE
Permit Ready to Issue  11/3/2005 DONE
Telephone call  11/3/2005 DONE
called ###-#### and told Tracy permit is ready and fees
Plan assigned to (SRZ)11/1/200511/1/200511/2/2005 PASS
11/2/2005 10:41:25 SRZ - activity updated through activity BLDA022 from case BLD05-02870.
Case Summary (BLD)  11/2/2005  
PLANS/APPL TAKEN TO FRONT DESK  11/2/2005 DONE
Routing - PLAN CHECK  11/2/2005 PASS
Plan assigned to (SAM)10/13/200510/13/200511/1/2005 DONE
Routing - PLANNING11/1/2005 11/1/2005 PASS
Routing - FIRE10/21/2005 10/24/2005 PASS
No fire sprinklers required
Routing - Erosion and Sediment10/21/2005 10/21/2005 PASS
ESC plan approved with attached conditions.
Routing - PLANNING10/14/2005 10/17/2005 FAIL
Failed for noncompliance with condition of approval #19: 19. The applicant/developer shall have eighteen (18) months from the date of this letter to implement a Hillside and Foothills Development Permit. Within this period, the holder of the permit must acquire construction permits and commence placement of permanent footings and structures on or in the ground. The definition of structures in this context shall refer to the footings, foundation or retaining wall.
Routing - PUBLIC WORKS GRADING10/13/2005 10/14/2005 PASS
Approved as Category 3
Routing - PUBLIC WORKS10/14/2005 10/14/2005 PASS
Application received  10/13/2005