BLD-Final | 9/14/2006 | 9/14/2006 | 9/14/2006 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/14/2006 at 7:05:07 AM. Contact: ###-####.
|
DOC - Permit Finaled | 9/14/2006 | 9/14/2006 | 9/14/2006 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 9/14/2006 | 9/14/2006 | 9/14/2006 | | DONE |
|
|
|
Final grading and drainage approved.
|
BLD-Wall cover | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/30/2006 at 10:43:09 AM. Contact: ###-####. e. c. ok
|
BLD-Energy code compliance | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/30/2006 at 10:43:09 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/25/2006 at 4:25:05 PM. Contact: ###-####. c/n on tag,, ok to insulate
|
BLD-Framing/Rough-in | 5/25/2006 | 5/25/2006 | 5/25/2006 | P | FAIL |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles conf only,,, list of items to complete for actual frame inspection
|
BLD-Framing/Rough-in | 5/24/2006 | 5/24/2006 | 5/24/2006 | P | NR |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 5/22/2006 | 5/22/2006 | 5/22/2006 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/22/2006 at 7:52:24 AM. Contact: ###-####. c/n posted,, no not insulate
|
Inspection Record Card- Bld | | | 4/18/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/18/2006 | | DONE |
|
|
|
|
BLD-Foundation | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | PART |
Tony Young
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 3/14/2006 | 3/15/2006 | 3/15/2006 | A | PASS |
Tom Arcoraci
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PubWorks Subgrade Approval | 3/15/2006 | 3/15/2006 | 3/15/2006 | | DONE |
|
|
|
footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 3/13/2006 | 3/13/2006 | 3/13/2006 | P | NR |
Tony Young
|
|
|
Jan; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong need soils report
|
CHANGE STATUS TO (FEE) | | | 3/3/2006 | | DONE |
|
|
|
ok per Bob A.
|
Permit Ready to Issue | | | 3/3/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/3/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/3/2006 | | DONE |
|
|
|
|
VOIDED CHANGE STATUS | | | 2/10/2006 | | DONE |
|
|
|
Highland Building group is not building this home, they are pulling the plans and voiding them per Tracy. Plans designed by Ram-Tech dated 9-27-05 are now null and void. New applications and plans are required for new permit.per Bob Archibald\rad
|
Inspection Record Card- Bld | | | 11/3/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/3/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/3/2005 | | DONE |
|
|
|
called ###-#### and told Tracy permit is ready and fees
|
Plan assigned to (SRZ) | 11/1/2005 | 11/1/2005 | 11/2/2005 | | PASS |
|
|
|
11/2/2005 10:41:25 SRZ - activity updated through activity BLDA022 from case BLD05-02870.
|
Case Summary (BLD) | | | 11/2/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 11/2/2005 | | PASS |
|
|
|
|
Plan assigned to (SAM) | 10/13/2005 | 10/13/2005 | 11/1/2005 | | DONE |
|
|
|
|
Routing - PLANNING | 11/1/2005 | | 11/1/2005 | | PASS |
|
|
|
|
Routing - FIRE | 10/21/2005 | | 10/24/2005 | | PASS |
|
|
|
No fire sprinklers required
|
Routing - Erosion and Sediment | 10/21/2005 | | 10/21/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 10/14/2005 | | 10/17/2005 | | FAIL |
|
|
|
Failed for noncompliance with condition of approval #19: 19. The applicant/developer shall have eighteen (18) months from the date of this letter to implement a Hillside and Foothills Development Permit. Within this period, the holder of the permit must acquire construction permits and commence placement of permanent footings and structures on or in the ground. The definition of structures in this context shall refer to the footings, foundation or retaining wall.
|
Routing - PUBLIC WORKS GRADING | 10/13/2005 | | 10/14/2005 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 10/14/2005 | | 10/14/2005 | | PASS |
|
|
|
|
Application received | | | 10/13/2005 | | |
|
|
|
|