Letter of compliance | | | 2/15/2007 | | DONE |
|
|
|
Letter of Compliance issued 2-15-07
|
BLD-Final | 2/2/2007 | 2/5/2007 | 2/5/2007 | P | PASS |
Tom Arcoraci
|
|
|
DERRICK; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
FIRE-Final Inspection | 2/2/2007 | 2/2/2007 | 2/2/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Aging Inspection | 1/19/2007 | 1/19/2007 | 1/19/2007 | | NR |
Tom Arcoraci
|
|
|
|
FIRE-Conference | 11/15/2006 | 11/16/2006 | 11/16/2006 | A | PASS |
Troy Cobbley
|
|
|
The owners representative wanted me to ok their new layout to meet the sprinkler analasis. They are reinstalling the racks starting in the northwest corner. They are providing 6" transverse and longitudinal flu spaces with 48" isles. This meets the intent of the letter and if carried out will be approved by me.
|
BLD-Aging Inspection | 9/19/2006 | 9/19/2006 | 9/21/2006 | | NR |
Troy Cobbley
|
|
|
work is in progrss
|
Telephone call | | | 9/21/2006 | | DONE |
|
|
|
Received call from Garret (Derick?) Cooper with RRC Construction, ###-####. Complained that Troy Cobbley had required a sprinkler analysis and the TVFP analysis indicated 6" flues are required and they only have 4". He was protesting that no one told them before. I referred him to Comment #1 of the Fire Code plan review and also # 5, which indicated plans were incomplete and not approved and gives them the option to resubmit a sprinkler analysis for approval or to wait for a field inspection to evaluate. They obviously chose to wait for the field inspection. I explained: we have no protection options beyond those given in NFPA 13; the owner has the option to decide the storage design they are going to install; they need to then submit a sprinkler analysis for approval for that design as indicated in our review. He indicated they have already loaded about 4 rows of racks. I explained that storage in the racks is not allowed until the sprinkler protection has been approved.
|
FIRE-Final Inspection | 9/20/2006 | 9/20/2006 | 9/20/2006 | P | FAIL |
Troy Cobbley
|
|
|
All items appear to be provided and corrected except for the 6" flu space required per the letter from Treasure Valley Fire Protection. Contractor is going to set up a conference with Sam Rogers.
|
FIRE-Final Inspection | 5/19/2006 | 5/19/2006 | 5/19/2006 | P | FAIL |
Troy Cobbley
|
|
|
Plan review comments had not been followed as far as providing verification of the existing sprinkler systems design parameters. No real inspection done. Just went over what I will need for the next inspection.
|
BLD-Aging Inspection | 3/6/2006 | 3/6/2006 | 3/6/2006 | | NR |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 12/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/9/2005 | | DONE |
|
|
|
talked to steven turney at ###-#### that permit is ready
|
Print Occupancy Form | | | 11/8/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2005 | | |
|
|
|
|
Plan assigned to (R_H) | 10/20/2005 | | 11/7/2005 | | PASS |
|
|
|
11/7/2005 14:14:56 RMH - activity updated through activity BLDA022 from case BLD05-02880.
|
Routing - FIRE | 11/1/2005 | | 11/7/2005 | | PASS |
Bill Alexander
|
|
|
With conditions.
|
Routing - PLAN CHECK | 11/7/2005 | | 11/7/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/1/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/20/2005 | | 11/1/2005 | | PEND |
|
|
|
No corrections required by the building department review, routed plans to fire on 11/01/05
|
Plans ACCEPTED BY PLAN TECH | | | 10/18/2005 | | |
|
|
|
|
Application received | | | 10/14/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/14/2005 | | |
|
|
|
|
Fee Review-notes | 10/14/2005 | 10/14/2005 | | | |
|
|
|
|