Permit Information
Permit NumberBLD05-02884
StatusFinaled
Name CAMBRIA SUITES FOUNDATION PERMIT
Site Address 2970 W ELDER ST
Project NameCAMBRIA SUITE-FOUNDATION
Customer Number 
ePlanReviewNo
Description
CAMBRIA SUITES-FOUNDATION PERMIT To construct the concrete foundation and slab on grade and allow for installation of underground electrical, plumbing and mechanical for the future motel under BLD 05-02392. There shall not be any construction beyond the slab on grade. There shall be no combustible materials stored on this site. Fire requirements for this permit are the same as for grading permit BLD 05-02437. Separate permits are required to be obtained for the installation of underground electrical, plumbing and mechanical and fire sprinkler service. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/16/2015 DONE
Third Notice BLD7/18/20077/18/20077/18/2007 DONE
Second Notice has not been responded to.
Second Notice BLD6/21/20076/21/20077/18/2007 DONE
First Notice has not been responded to.
First Notice5/18/20075/18/20076/21/2007 DONE
DetailsJim Storey
BLD-Aging Inspection5/15/20075/15/20075/18/2007 DONE
DetailsJim Storey
DOC - Permit Finaled5/18/20075/18/20075/18/2007PPASS
DetailsJim Storey
BLD-Aging Inspection3/9/20073/9/20073/12/2007 PASS
DetailsJim Storey
main permit stil in progess.
BLD-Aging Inspection1/5/20071/5/20071/5/2007 PASS
DetailsJim Storey
BLD-Aging Inspection11/1/200611/1/200611/1/2006 PASS
DetailsJim Storey
wip
BLD-Aging Inspection8/30/20068/30/20068/30/2006 PASS
DetailsJim Storey
wip
BLD-Aging Inspection6/28/20066/28/20066/28/2006 PASS
DetailsJim Storey
wip
BLD-Aging Inspection4/26/20064/26/20064/26/2006 PASS
DetailsJim Storey
wip
BLD-Conference2/23/20062/24/20062/24/2006APASS
DetailsJim Storey
Jim. I need to go over those fire seperations again with you. I have new info from architect.; Phone #: ###-#### Internet Inspection Request from: Alex Jansen
Case Summary (BLD)  1/18/2006 DONE
BLD-Conference1/12/20061/12/20061/12/2006PPASS
DetailsJim Storey
Balance of building pad and interior footings. West end of building pad.; Phone #: ###-#### Internet Inspection Request from: Alex Jansen
BLD-Conference1/7/20061/9/20061/9/2006APASS
DetailsTom Arcoraci
Foundation slab. East section of building. Plus misc pier footings at SW corner of building.; Phone #: ###-#### Internet Inspection Request from: Alex Jansen
BLD-Conference12/15/200512/15/200512/15/2005PPASS
DetailsJim Storey
Last section of foundation wall at east end of building. Elevator pit walls.; Phone #: ###-#### Internet Inspection Request from: Alex Jansen
BLD-Foundation12/2/200512/2/200512/2/2005PPART
DetailsJim Storey
alex ###-####si bar ok/ report to remove df wood spreadder bottom of wall when placed.
Routing Off Site - STRUCTURAL12/1/2005 12/2/2005 PASS
Issue PAID IN FULL permit  12/2/2005 DONE
Plan assigned to (M_P)10/24/200510/24/200512/1/2005 PASS
12/1/2005 09:02:40 M_P - activity updated through activity BLDA022 from case BLD05-02884.
Routing - PLAN CHECK10/27/2005 12/1/2005 PASS
Final structural review for foundation approved by City Plan Reviewer.
PLANS/APPL TAKEN TO FRONT DESK  12/1/2005 DONE
Print Pending Permit.LaserJet4  12/1/2005 DONE
Case Summary (BLD)  12/1/2005 DONE
Permit Ready to Issue  12/1/2005 DONE
Inspection Record Card- Bld  12/1/2005 DONE
Inspection Record Card- Bld  12/1/2005 DONE
Telephone call  12/1/2005 DONE
Spoke with Alex and told him that permit is ready & fees///12/01/05 @9:30am BAS
1st review completed  12/1/2005 DONE
Routing Off Site - STRUCTURAL11/18/2005 11/25/2005 FAIL
3rd review failed, faxing and e-mailing comments to architect. Further review required.
Routing Off Site - STRUCTURAL11/7/2005 11/16/2005 FAIL
2nd review failed, e-mailed comments to engineer and architect. Additional review required by outside engineering firm.
Routing Off Site - STRUCTURAL10/24/2005 10/28/2005 FAIL
Additional information required for further review prior to issuing permit. E-mailed a copy to architect and requested additional plans and calculations to be resubmitted.
Routing - PLUMBING10/26/2005 10/27/2005 PASS
cleanouts required on the sewer lines every 100'. use boise city approved grease interceptor detail, attached. suds relief required. complete plans not provided to verify pipe sizing, proceed at your own risk.
Routing - PLANNING10/24/2005 10/26/2005 PASS
Approved per DRH05-00187 and as noted on Sheet C-2 for sidewalk connection requirements to Shoshone and Elder. Passed documents on to Cody Riddle for CUP sign-off. SMS 10/25/05

Conditions of approval for CUP05-00062 not met. Applicant was required to submit copies of cross access and emergency access agreemengts prior to issuance of building permits. This is foundation only, but easments must be submitted prior to future permits.
Routing - PUBLIC WORKS10/20/2005 10/24/2005 PASS
Plans ACCEPTED BY PLAN TECH  10/20/2005  
Plan routing begun/NEW & ADDTN  10/20/2005  
Application received  10/14/2005