Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02918
StatusFinaled
Name HIGH DESERT CONSTRUCTION
Site Address 11698 W HOLLANDALE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a new 2165s.f. 2-story single family dwelling with 1316s.f. on the main level; 769s.f. on the upper level that includes a 320s.f. bonus room over the 732s.f. 3-car garage. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." R-1B ok per Angela Brosious. All per the approved plans as marked REScheck and plan review notes. PC#049 pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/26/20065/30/20065/30/2006APASS
DetailsMike Jordan
Tim; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
DOC - Permit Finaled5/30/20065/30/20065/30/2006PPASS
DetailsMike Jordan
Handrail clearance issue has been resolved.
BLD-Final5/25/20065/26/20065/26/2006PFAIL
DetailsMike Jordan
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. does not have the required 1.5 " clearance between handrail and wall.
BLD-Framing/Rough-in2/23/20062/24/20062/24/2006APASS
DetailsMike Jordan
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All framing issues have been resolved.
BLD-Energy code compliance2/24/20062/24/20062/24/2006APASS
DetailsMike Jordan
BLD-Framing/Rough-in2/21/20062/21/20062/21/2006PFAIL
DetailsMike Jordan
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs header over bonus room door, needs 4x4 post for pointload under floor. c/n posted. ok to insul.
BLD-Footing1/4/20061/5/20061/5/2006PPASS
DetailsMike Jordan
request around 3pm//ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Permit Ready to Issue  12/16/2005 DONE
Inspection Record Card- Bld  12/16/2005 DONE
Telephone call  12/16/2005 DONE
left mess that permit is ready
Issue PAID IN FULL permit  12/16/2005 DONE
Plan assigned to (SAM)10/18/200510/18/200512/14/2005 PASS
12/14/2005 15:36:58 PEP - activity updated through activity BLDA022 from case BLD05-02918.
Routing - PLAN CHECK12/13/2005 12/14/2005 PASS
Plan assigned to (PEP)12/14/2005 12/14/2005 PASS
12/14/2005 15:36:58 PEP - activity updated through activity BLDA022 from case BLD05-02918.
Case Summary (BLD)  12/14/2005  
PLANS/APPL TAKEN TO FRONT DESK  12/14/2005 DONE
Routing - PUBLIC WORKS12/12/2005 12/13/2005 PASS
Routing - PLANNING12/12/2005 12/12/2005 PASS
Received revised site plan with house flipped on lot to comply with 22 ft. driveway for backup. 3:00 p.m. ajb
Telephone call  12/8/2005  
Received a call from Melissa at PFX (designer). Discussed back up requirements and the need to flip the house on the lot.
Telephone call  12/6/2005  
Received call from Mike at High Desert Construction. Told him he needs to submit revised site plan with house flipped on lot.
Routing - PLANNING10/20/2005 10/20/2005 FAIL
Garage does not come remotely close to meeting backup requirments. House must be flipped on the lot. Left message for Mike at High Desert Construction.
Routing - PLANNING Land Div10/18/2005 10/20/2005 PASS
The Pepperwood Estates #9 Subdivision was approved and recorded in 2002.
Application received  10/18/2005