BLD-Final | 4/27/2006 | 4/28/2006 | 4/28/2006 | P | PASS |
Mike Jordan
|
|
|
final inspection requested; Phone #: ###-#### Internet Inspection Request from: larry hobbs
|
DOC - Permit Finaled | 4/28/2006 | 4/28/2006 | 4/28/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Wall cover | 2/8/2006 | 2/9/2006 | 2/9/2006 | P | PASS |
Mike Jordan
|
|
|
this is a request for a insulation inspection after 12 p.m.thanks Internet Inspection Request from: larry hobbs. All framing issues have been repaired. ok to cover.
|
BLD-Framing/Rough-in | 2/2/2006 | 2/3/2006 | 2/3/2006 | A | FAIL |
Mike Jordan
|
|
|
request framing inspection; Phone #: ###-#### Internet Inspection Request from: larry hobbs. Complete lateral bracing on C01 truss. Additional studs required at the 3 11 7/8 ML. Truss engineering shows continous bearing at D01 truss. Additional blocking required under floor at bearing points. c/n posted.
|
Issue PAID IN FULL permit | | | 11/25/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/22/2005 | | DONE |
|
|
|
Left message that permit is ready & fees///11/22/05 @8:05am BAS
|
Plan assigned to (SRZ) | 11/15/2005 | 11/15/2005 | 11/21/2005 | | PASS |
|
|
|
11/21/2005 14:00:51 SRZ - activity updated through activity BLDA022 from case BLD05-02919.
|
Case Summary (BLD) | | | 11/21/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2005 | | DONE |
|
|
|
ONE SET APPROVED.
|
Permit Ready to Issue | | | 11/21/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/21/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 11/4/2005 | | 11/21/2005 | | PASS |
|
|
|
|
BLD-Foundation | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | PART |
Mike Jordan
|
|
|
larry hobbs ###-####
|
Plan assigned to (SAM) | 10/18/2005 | 10/18/2005 | 11/15/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/15/2005 | | PEND |
|
|
|
Pending Beam calcs. & Structural Information.
I spoke with the Designer and requested. (SRZ)
|
BLD-Footing | 11/14/2005 | 11/14/2005 | 11/14/2005 | P | PART |
Mike Jordan
|
|
|
###-#### larry
|
Early Start Permit | | | 11/10/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2005 | | DONE |
|
|
|
Left message that early start permit is ready///11/10/05 8:40am BAS
|
Routing - PUBLIC WORKS | 11/3/2005 | | 11/4/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 11/3/2005 | | 11/3/2005 | | PASS |
|
|
|
approved per redlined site plan - move garage wall west 2' to accomodate back up space and landscape buffer. Revised plans pending. eeg.
|
Application received | | | 10/18/2005 | | |
|
|
|
|
Routing - PLANNING | 10/18/2005 | | | | FAIL |
|
|
|
originally routed to Bruce Eggleston for review. EG received 10/26/05. Fail plan for 22' back up space plus 3' landscape buffer required for driveway. Phoned applicant 10/26/05.
|