Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-02930
StatusFinaled
Name PRIMARY CONSTRUCTION
Site Address 2221 E HOSPITALITY LN
Project NameSherman Williams Paint Store
Customer Number 
ePlanReviewNo
Description
Sherwin Williams Paint Store - To construct a 4,967 sq. ft. one story Type IIB retail paint building with store room. Two separate control areas are being created with a one-hour fire barrier between the store room and retail areas. Other work includes all site improvements, paving and landscaping per approved plans and attachments, CUP05-00064, DRH05-00200. Storage Racking over 8 feet in height requires separate permits with plans and engineering.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/2/20068/2/20068/3/2006 DONE
First Notice has not been responded to.
Second Notice BLD8/2/20068/2/20068/3/2006 DONE
First Notice has not been responded to.
First Notice 6/28/20068/2/2006 DONE
First Notice 6/28/20068/2/2006 DONE
BLD-Final6/27/20066/28/20066/28/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/27/2006 at 3:12:34 PM. Contact: ###-####.
Permanent Occupancy 6/28/20066/28/2006 DONE
Details
Code Occupancy Approval  6/28/2006 PASS
Permanent occupancy UNPAID FEE  6/28/2006 DONE
Perm. Occ. Cert. # 11101 issued 6-28-06 to Sherman Williams Paint.
Permanent occupancy UNPAID FEE  6/28/2006  
FIRE-Final Inspection6/22/20066/23/20066/23/2006PPASS
DetailsForrest France
All items on previous correction notice have been completed, inspection passed.
FIRE-Final Inspection6/16/20066/19/20066/20/2006AFAIL
DetailsForrest France
Provide approved hardware at the west facing exit door, provide building address numbers for both sides of the building as it is corner facing, need to supply means to test the duct smoke detector.
Telephone call  6/7/2006 DONE
Spoke with Bob Summers of Sherman Williams, in regards to the requested quantities of hazardous materials for the racking. Bob is sending me the requested information.
BLD-Framing/Rough-in5/30/20065/30/20065/30/2006PPART
DetailsJim Storey
ceiling grid; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung pending others/ supply support/fire stop and patch restarm.
BLD-Framing/Rough-in5/10/20065/11/20065/11/2006APASS
DetailsJim Storey
chris; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Other4/20/20064/21/20064/21/2006APASS
DetailsJim Storey
chris - Note: roofing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Other4/19/20064/19/20064/19/2006PPASS
DetailsJim Storey
chris Note: roof; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Concrete4/13/20064/13/20064/13/2006PPART
DetailsJim Storey
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong pwsi
BLD-Concrete4/10/20064/10/20064/10/2006PPART
DetailsJim Storey
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pwsi
BLD-Concrete4/6/20064/6/20064/6/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/6/2006 at 8:00:12 AM. Contact: ###-####. bond beam ok above winow front si on file.
BLD-Framing/Rough-in4/3/20064/3/20064/3/2006PPART
DetailsJim Storey
Chris -- grout inspection; prefer 1PM; pouring concrete at 1PM; call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Framing/Rough-in3/23/20063/23/20063/23/2006PPART
DetailsTom Arcoraci
Chris -- masonry work; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong spec insp on site
BLD-Foundation3/9/20063/9/20063/9/2006PPASS
DetailsJim Storey
Chris -- for stem wall; prefers 3pm because concrete will show up; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Footing3/8/20063/8/20063/8/2006PPASS
DetailsJim Storey
chris - ###-####
(F) Reprint permit  3/1/2006  
Issue PAID IN FULL permit  2/28/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/24/2006 DONE
Print Occupancy Form  2/24/2006 DONE
Permit Ready to Issue  2/24/2006 DONE
Plan assigned to (MLO)10/24/2005 2/24/2006 PASS
2/24/2006 10:18:14 MLO - activity updated through activity BLDA022 from case BLD05-02930.
Routing - FIRE2/17/2006 2/23/2006 PASS
Attached review notes to plans. Faxed review notes to architect.
Plan resubmittals received  2/17/2006 DONE
Received 1 letter to Sam R. , 1 site plan (8 1/2 x11) 2 copys of sheet AL-1 ,AS-1 taken to Mike O.
Plan resubmittals requested  2/13/2006  
revised plans for hydrant location required per S. Rogers prior to approval. MLO
Plan Modification Accepted  2/7/2006 DONE
D. Hanneman approved locating the new hydrant on the west side of Hospitality near the northwest entrance to the Sherwin Williams facility.
Telephone call  1/25/2006 DONE
Phone call from Dana Kaufman; I explained FD requirement for a hydrant on this future roadway at the SW corner of their parcel. We would consider the possibility of locating it on the opposite side of the street if the developer was willing.
Meeting  1/24/2006 DONE
I met with Dave Hanneman. FD will required one new fire hydrant, to be located on Hopitality Lane at the SW corner of the Sherwin Williams parcel. This hydrant installation is required under this permit prior to paving of this new road to meet hydrant spacing requirements for FD access to Sherwin Williams as well as for future buildings along this street.
Telephone call  1/24/2006 DONE
!/24/06 - Called architect to advise him of the Fire Marshal's decision on the need for an additional hydrant on the unnamed roadway which will connect Hosptality Lane and Federal Way, at the SW corner of the Sherwin Williams parcel. Left message for him to call me to discuss. (refer to Plan Review comment #1).
Routing - PLAN CHECK1/24/2006 1/24/2006 PEND
Routing - FIRE1/13/2006 1/19/2006 FAIL
1/19/06 - Inadequate hydrant spacing. Discussed a request by architect, Dana Kauffman to accept existing hydrants as shown on resubmitted plans. I will discuss possibility of an exception with fire marshal. Holding plans in Fire until issue is resolved.
1/24/06 - One new hire hydrant is required per meeting with Fire Marshal. See details under separate entries under Meeting and Telephone notes. No revisions required to previously issued IFC comments .
Routing - PLAN CHECK1/13/2006 1/13/2006 PASS
Routing Off Site - STRUCTURAL1/13/2006 1/13/2006 PASS
Plan resubmittals received  1/12/2006 DONE
received 2 structural response sheets, 1 comment to Sam R.,2 comment to Mike O. , 1 letter to Dana Kauffman,2 project start up for special inspections, 3 supplemental structural calcs , 2 copys of sheets A0.0,AS-1,AL-1,A1.0,A2.0,A4.0,A5.0,A6.0 C-COV,C-SURV,C-SITE,C-ESC,C-GO1,C-DET,E2.0,E3.0, 3copys of sheets S2.0,S3.0,S4.1 taken to Mike O.
1st review completed  11/29/2005 FAIL
FAILED FIRE AND PLAN CHECK
Routing - PLAN CHECK11/29/2005 11/29/2005 PEND
Routing - PLAN CHECK11/25/2005 11/25/2005 PEND
Routing - FIRE11/16/2005 11/23/2005 FAIL
sent to FV 11/17.
Plan resubmittals requested  11/16/2005 DONE
IBC corrections
Routing - PLAN CHECK11/4/2005 11/16/2005 FAIL
corrections sent to architect
Routing Off Site - STRUCTURAL10/25/2005 11/16/2005 FAIL
corrections sent to architect
Routing - PLANNING11/2/2005 11/4/2005 PASS
DRH05-00200 - Approved per DR.
Routing - PLANNING11/1/2005 11/2/2005 PASS
PASS: CUP05-00064 Angela W.
Routing - PLUMBING11/1/2005 11/1/2005 PASS
per plans and 2003 upc
Routing - Erosion and Sediment11/1/2005 11/1/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS10/28/2005 11/1/2005 PASS
Routing - PLANNING Land Div10/24/2005 10/28/2005 PASS
Approved as Parcel "L" in application ROS05-00039. ROS 6978 recorded on July 13, 2005.
Plans ACCEPTED BY PLAN TECH  10/24/2005  
Plan routing begun/NEW & ADDTN  10/24/2005  
Application received  10/19/2005  
Recd Pcfee & Taken To Pln CK  10/19/2005  
Fee Review-notes10/19/200510/19/2005