Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02939
StatusFinaled
Name CHRISTENSEN CORP
Site Address 918 W BANNOCK ST
Project Name10TH & BANNOCK BLDG
Customer Number 
ePlanReviewNo
Description
(10TH & BANNOCK BUILDING - 10 STORIES) (7-20-06) THE DRAWINGS WERE REVISED TO SHOW VENTILATION DUCTS TO SERVE THE TEL/DATA CLOSETS ON THE 2ND STORY THROUGH THE 11TH STORY. IN ADDITION, DRAWINGS WERE PROVIDED SHOWING COOLING EQUIPMENT IN ROOM 112 ON THE 1ST STORY WHERE THE MAIN TELCOM SERVER RACKS WILL BE LOCATED. This structure is required to be fire sprinklered because it is a high-rise building. To install access floor systems and suspended ceiling systems on the 3rd story (called the 2nd story on the drawings) through the 12th story (called the 11th story on the drawings) within a 12 story high-rise building. A total of 10 stories will be affected. In addition, to constructed 1-hr corridor walls on the 4th story (called the 3rd story on the drawings) through the 12th story (called the 11th story on the drawings). A total of 9 stories will be affected. This permit is intended to be a phased shell permit. See permit BLD04-02348 for the first phase shell permit. This permit is NOT intended to establish a Certificate of Occupancy for any tenant. Work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice4/21/20104/21/201010/24/2012 DONE
DetailsDave Hannah
This permit finaled on the web by Marva Schwager
Plan Reviewer's activity  6/21/2010 DONE
Took office copy to Records.
BLD-Aging Inspection4/19/20104/19/20104/21/2010 PASS
DetailsDave Hannah
DOC - Permit Finaled4/21/20104/21/20104/21/2010APASS
DetailsDave Hannah
BLD-Aging Inspection12/8/200912/8/200912/16/2009 PASS
DetailsDave Hannah
marva will schedule finals
BLD-Conference5/7/20075/7/20075/7/2007PDONE
DetailsDave Hannah
Dave this is the one I called you about...Dixie
BLD-Framing/Rough-in9/11/20069/11/20069/11/2006PPART
DetailsDave Hannah
dennis Note: 8th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover
BLD-Framing/Rough-in8/28/20068/29/20068/29/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/28/2006 at 12:55:33 PM. Contact: ###-####.5th and 6th floor control room duct work ok
BLD-Framing/Rough-in8/24/20068/24/20068/24/2006PPART
DetailsDave Hannah
###-#### - dennis Note: duct work 9th 5th and 6th ok
(F) Reprint permit  7/26/2006 DONE
Routing - PLAN CHECK7/6/2006 7/20/2006 PASS
Sheets came in on or about July 5, 2006, July 12, 2006, and July 18, 2006. Review was delayed until all sheets were in. Drawings approved after review.
Telephone call  7/20/2006 DONE
tried to leave mess for rick at ###-#### permit is ready
Plan resubmittals received  7/18/2006 DONE
Received 1 letter, & 2 copys of sheets MH-101, MH-606, MP-101-A taken to Carl W.
Plan resubmittals received  7/12/2006 DONE
received 2 copys of sheet A-103 taken to Carl W. (plans issued 12-16-05)
BLD-Framing/Rough-in3/1/20063/2/20063/2/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/1/2006 at 2:55:05 PM. Contact: ###-####. second floor ok to install ceiling
BLD-Framing/Rough-in2/24/20062/27/20062/27/2006APART
DetailsDave Hannah
request 1st thing///dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa corr walls 5th and 6th fl ok to cover
(F) Reprint permit  2/21/2006  
Issue PAID IN FULL permit  12/16/2005 DONE
Inspection Record Card- Bld  12/2/2005 DONE
Permit Ready to Issue  12/2/2005 DONE
Telephone call  12/2/2005 DONE
called ###-#### and left voicemessage for Amy that permit is ready and fees
Routing - PLAN CHECK11/22/2005 12/1/2005 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  12/1/2005 DONE
Plan assigned to (CJW)10/27/2005 12/1/2005 PASS
12/1/2005 16:12:43 CJW - activity updated through activity BLDA022 from case BLD05-02939.
Routing - FIRE11/9/2005 11/22/2005 PASS
no fire comments required
1st review completed  11/22/2005 FAIL
failed plan check
Plan resubmittals received  11/14/2005 DONE
Received 1 Transmittal,1 letter,2 teccrete access floor specifications & 2 copys of sheet G-00 Taken to Carl W.
Routing - PLAN CHECK10/27/2005 11/9/2005 FAIL
The IBC plan review was started on November 8 and was finished the next day. Revised drawings were required. See the plan review report.
Plans ACCEPTED BY PLAN TECH  10/25/2005  
Application received  10/19/2005  
Recd Pcfee & Taken To Pln CK  10/19/2005  
Fee Review-notes10/19/200510/19/2005