Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-02973
StatusFinaled
Name MASCO INC
Site Address 5450 W GOWEN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Masco, Inc. Storage Building - To construct a new 3,600 square foot, one story pole structure storage building with concrete slab floor and related site improvements. The south 1,800 square feet is entirely enclosed with two overhead doors and a man door on the east side. The north half (1,800 square feet) is enclosed on three sides and open on the east side. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/25/20069/25/200610/16/2006 DONE
First Notice has not been responded to.
First Notice 8/31/20069/25/2006 DONE
PubWorks Occupancy Approval9/1/20069/1/20069/1/2006 DONE
BLD-Final8/31/20068/31/20068/31/2006PPASS
DetailsJim Storey
FIRE-Final Inspection8/30/20068/31/20068/31/2006APASS
DetailsForrest France
Life safety inspection passed.
Code Occupancy Approval8/31/20068/31/20068/31/2006APASS
DetailsDena Gambrel
8-31-06 Occupancy Inspection Passed....per plans on sight, there was no landscaping required for this storage building.
Permanent Occupancy 8/31/20068/31/2006 DONE
Details
Permanent occupancy  8/31/2006 DONE
Perm. Occ. Cert. # 11195 issued 8-31-06 to Masco.
FIRE-Final Inspection8/23/20068/24/20068/24/2006ACANC
DetailsForrest France
issues not taken care of per michael - call 1/2 hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Final8/21/20068/22/20068/22/2006PPART
DetailsJim Storey
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok pending others.
BLD-Framing/Rough-in6/23/20066/23/20066/23/2006PPASS
DetailsJim Storey
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Footing6/5/20066/6/20066/6/2006APART
DetailsJim Storey
michael kensler--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Aging Inspection4/14/20064/14/20064/14/2006 NR
DetailsJim Storey
Permit Ready to Issue  4/13/2006 DONE
Telephone call  4/13/2006  
called ###-#### and told Cathy that plan mod is ready to issue and fees
CHANGE STATUS TO (ISS)  4/13/2006  
(F) Reprint permit  4/13/2006  
Plan assigned to (JCM)3/16/20063/16/20064/12/2006 PASS
4/12/2006 15:04:10 JCM - activity updated through activity BLDA022 from case BLD05-02973.
Plan Reviewer's activity  4/12/2006 PASS
Reviewed and approved plan modification to change the structural design to a precut wood framed (pole building) design. JCM
PLANS/APPL TAKEN TO FRONT DESK  4/12/2006 DONE
Print Occupancy Form  4/12/2006 DONE
Plan resubmittals received  4/11/2006 DONE
Received 2 copies of response letter with copies of plan review fax transmittal, 8 1/2 X 11 and 18X24 sheets of S1 of S2, S2 of S2, wind load uplift on concrete calcs, 6 pages header column calculations, taken to John M,rad
Plan resubmittals requested  4/4/2006 DONE
Faxed the contractor a copy of comment list requesting additional revisions. JCM
Plan resubmittals received  4/3/2006 DONE
Received 1 response,1 transmittal, & 3 copys of sheets G1of G1,SF1 of SF1,S1 of S7, S2 of S7,S3 of S7, S4 of S7, S5 of S7,S 6 of S7, S7 of S7 Taken to John M.
Plan resubmittals requested  3/22/2006 DONE
Faxed the contracter a comment list requesting revisions. JCM
Plan Modification Accepted  3/16/2006  
Plan Modification excepted for BLD05-02973 Plans were drawn using a generic pole barn. they have purchased a ''Morton Building INC. Therefore they have changed the post layout and foundation system.these changes have been reviewed by the Engineer of record and his letter of approval is attached.sheets G1,SF1,(6) S1,S2,S3,S4,S5,S6,replace sheets as1.1,S1.1,S5.1,S7.1
Plans ACCEPTED BY PLAN TECH  3/16/2006  
(F) Reprint permit  1/11/2006  
Issue PAID IN FULL permit  1/10/2006 DONE
Routing - Erosion and Sediment1/3/2006 1/4/2006 PASS
ESC plan approved with attached conditions.
PLANS/APPL TAKEN TO FRONT DESK  1/4/2006 DONE
Print Occupancy Form  1/4/2006 DONE
Permit Ready to Issue  1/4/2006 DONE
Telephone call  1/4/2006 DONE
called ###-#### and left voicemessage for Billy Strite that permit is ready and fees and need ACHD
Plan assigned to (JCM)10/31/2005 1/4/2006 PASS
1/4/2006 08:10:04 JCM - activity updated through activity BLDA022 from case BLD05-02973.
Routing - PLAN CHECK12/12/2005 1/3/2006  
CHANGE STATUS TO (REV)  1/3/2006  
Plan resubmittals received  12/29/2005  
Received 2 Erosion & Sediment control site plans & 2 letters. these were taken to ESC by mistake they should have come to Plan Review to be stamped and taken to the plan reviewer.stamped DEC-29-05 Plan review did not receive these until 1-3-05 ///DLD
Routing - FIRE11/29/2005 12/12/2005 PASS
1st review completed  12/12/2005 FAIL
plan check and ESC.
Routing - Erosion and Sediment11/28/2005 11/29/2005 FAIL
ESC plan does not meet requirments per BMC 8-17. Checklist faxed to PD.
Routing - PLAN CHECK11/25/2005 11/28/2005 PASS
Routing - PLANNING11/22/2005 11/25/2005 PASS
Approved per DRH05-00107.
Routing - PLUMBING11/21/2005 11/22/2005 PASS
no plumbing shown
Plan resubmittals received  11/22/2005 DONE
Received 1 Erosion & Sediment Control Plan Taken to John M.
Routing - Erosion and Sediment11/17/2005 11/21/2005 FAIL
ESC plan does not meet requirements. Faxed checklist to PD.
Routing - PUBLIC WORKS11/15/2005 11/17/2005 PASS
Plan Reviewer's activity  11/16/2005 PASS
Reviewed and approved plans as submitted for structural and non-structural building requirements. JCM
Routing - PLANNING Land Div10/31/2005 11/15/2005 PASS
Plans ACCEPTED BY PLAN TECH  10/31/2005  
Plan routing begun/NEW & ADDTN  10/31/2005  
CHANGE STATUS TO (PND)  10/31/2005  
hit ready button///dld
Application received  10/25/2005  
Recd Pcfee & Taken To Pln CK  10/25/2005 DONE
Routing - PLAN CHECK1/4/2006 1/4/2005 PASS
Fee Review-notes10/25/200510/25/2005