Second Notice BLD | 9/25/2006 | 9/25/2006 | 10/16/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/31/2006 | 9/25/2006 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 9/1/2006 | 9/1/2006 | 9/1/2006 | | DONE |
|
|
|
|
BLD-Final | 8/31/2006 | 8/31/2006 | 8/31/2006 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 8/30/2006 | 8/31/2006 | 8/31/2006 | A | PASS |
Forrest France
|
|
|
Life safety inspection passed.
|
Code Occupancy Approval | 8/31/2006 | 8/31/2006 | 8/31/2006 | A | PASS |
Dena Gambrel
|
|
|
8-31-06 Occupancy Inspection Passed....per plans on sight, there was no landscaping required for this storage building.
|
Permanent Occupancy | | 8/31/2006 | 8/31/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/31/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11195 issued 8-31-06 to Masco.
|
FIRE-Final Inspection | 8/23/2006 | 8/24/2006 | 8/24/2006 | A | CANC |
Forrest France
|
|
|
issues not taken care of per michael - call 1/2 hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Final | 8/21/2006 | 8/22/2006 | 8/22/2006 | P | PART |
Jim Storey
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok pending others.
|
BLD-Framing/Rough-in | 6/23/2006 | 6/23/2006 | 6/23/2006 | P | PASS |
Jim Storey
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Footing | 6/5/2006 | 6/6/2006 | 6/6/2006 | A | PART |
Jim Storey
|
|
|
michael kensler--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Aging Inspection | 4/14/2006 | 4/14/2006 | 4/14/2006 | | NR |
Jim Storey
|
|
|
|
Permit Ready to Issue | | | 4/13/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/13/2006 | | |
|
|
|
called ###-#### and told Cathy that plan mod is ready to issue and fees
|
CHANGE STATUS TO (ISS) | | | 4/13/2006 | | |
|
|
|
|
(F) Reprint permit | | | 4/13/2006 | | |
|
|
|
|
Plan assigned to (JCM) | 3/16/2006 | 3/16/2006 | 4/12/2006 | | PASS |
|
|
|
4/12/2006 15:04:10 JCM - activity updated through activity BLDA022 from case BLD05-02973.
|
Plan Reviewer's activity | | | 4/12/2006 | | PASS |
|
|
|
Reviewed and approved plan modification to change the structural design to a precut wood framed (pole building) design. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/12/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/11/2006 | | DONE |
|
|
|
Received 2 copies of response letter with copies of plan review fax transmittal, 8 1/2 X 11 and 18X24 sheets of S1 of S2, S2 of S2, wind load uplift on concrete calcs, 6 pages header column calculations, taken to John M,rad
|
Plan resubmittals requested | | | 4/4/2006 | | DONE |
|
|
|
Faxed the contractor a copy of comment list requesting additional revisions. JCM
|
Plan resubmittals received | | | 4/3/2006 | | DONE |
|
|
|
Received 1 response,1 transmittal, & 3 copys of sheets G1of G1,SF1 of SF1,S1 of S7, S2 of S7,S3 of S7, S4 of S7, S5 of S7,S 6 of S7, S7 of S7 Taken to John M.
|
Plan resubmittals requested | | | 3/22/2006 | | DONE |
|
|
|
Faxed the contracter a comment list requesting revisions. JCM
|
Plan Modification Accepted | | | 3/16/2006 | | |
|
|
|
Plan Modification excepted for BLD05-02973 Plans were drawn using a generic pole barn. they have purchased a ''Morton Building INC. Therefore they have changed the post layout and foundation system.these changes have been reviewed by the Engineer of record and his letter of approval is attached.sheets G1,SF1,(6) S1,S2,S3,S4,S5,S6,replace sheets as1.1,S1.1,S5.1,S7.1
|
Plans ACCEPTED BY PLAN TECH | | | 3/16/2006 | | |
|
|
|
|
(F) Reprint permit | | | 1/11/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/10/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/3/2006 | | 1/4/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/4/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/4/2006 | | DONE |
|
|
|
|
Telephone call | | | 1/4/2006 | | DONE |
|
|
|
called ###-#### and left voicemessage for Billy Strite that permit is ready and fees and need ACHD
|
Plan assigned to (JCM) | 10/31/2005 | | 1/4/2006 | | PASS |
|
|
|
1/4/2006 08:10:04 JCM - activity updated through activity BLDA022 from case BLD05-02973.
|
Routing - PLAN CHECK | 12/12/2005 | | 1/3/2006 | | |
|
|
|
|
CHANGE STATUS TO (REV) | | | 1/3/2006 | | |
|
|
|
|
Plan resubmittals received | | | 12/29/2005 | | |
|
|
|
Received 2 Erosion & Sediment control site plans & 2 letters. these were taken to ESC by mistake they should have come to Plan Review to be stamped and taken to the plan reviewer.stamped DEC-29-05 Plan review did not receive these until 1-3-05 ///DLD
|
Routing - FIRE | 11/29/2005 | | 12/12/2005 | | PASS |
|
|
|
|
1st review completed | | | 12/12/2005 | | FAIL |
|
|
|
plan check and ESC.
|
Routing - Erosion and Sediment | 11/28/2005 | | 11/29/2005 | | FAIL |
|
|
|
ESC plan does not meet requirments per BMC 8-17. Checklist faxed to PD.
|
Routing - PLAN CHECK | 11/25/2005 | | 11/28/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 11/22/2005 | | 11/25/2005 | | PASS |
|
|
|
Approved per DRH05-00107.
|
Routing - PLUMBING | 11/21/2005 | | 11/22/2005 | | PASS |
|
|
|
no plumbing shown
|
Plan resubmittals received | | | 11/22/2005 | | DONE |
|
|
|
Received 1 Erosion & Sediment Control Plan Taken to John M.
|
Routing - Erosion and Sediment | 11/17/2005 | | 11/21/2005 | | FAIL |
|
|
|
ESC plan does not meet requirements. Faxed checklist to PD.
|
Routing - PUBLIC WORKS | 11/15/2005 | | 11/17/2005 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 11/16/2005 | | PASS |
|
|
|
Reviewed and approved plans as submitted for structural and non-structural building requirements. JCM
|
Routing - PLANNING Land Div | 10/31/2005 | | 11/15/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/31/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/31/2005 | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | 10/31/2005 | | |
|
|
|
hit ready button///dld
|
Application received | | | 10/25/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/25/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/4/2006 | | 1/4/2005 | | PASS |
|
|
|
|
Fee Review-notes | 10/25/2005 | 10/25/2005 | | | |
|
|
|
|