Permit Information
Permit NumberBLD05-02979
StatusVoid/No Violation
Name EAGLE PAVING
Site Address 2618 W FAIRVIEW AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To excavate & grade an existing parking lot for resurfaceing. No building to be done at this site.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/28/2010 DONE
VOIDED CHANGE STATUS  1/26/2007 DONE
Per Steve Webb/ George Slane void this permit
(F) Reprint permit  10/2/2006 DONE
Case Summary (BLD)  12/13/2005  
BLD-Other12/6/200512/7/200512/7/2005PCANC
DetailsDave Hannah
fill in holes for sepage bed///dain; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Other12/6/200512/7/200512/7/2005ACANC
DetailsDave Hannah
fill in holes for sepage bed///dain; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Other12/6/200512/6/200512/7/2005PCANC
DetailsDave Hannah
fill in holes for sepage bed///dain; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in12/5/200512/6/200512/6/2005ACANC
DetailsDave Hannah
sepege beds-- dana; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
(F) Reprint permit  11/28/2005 DONE
Plan assigned to (DLD) Darla10/28/200510/28/200511/21/2005 PASS
11/21/2005 07:37:01 KMW - activity updated through activity BLDA022 from case BLD05-02979.
Routing - PLAN CHECK11/20/2005 11/21/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/21/2005  
Permit Ready to Issue  11/21/2005  
Inspection Record Card- Bld  11/21/2005 DONE
Telephone call  11/21/2005 DONE
called ###-#### and left voicemessage for Dain that permit is ready and fees
Issue PAID IN FULL permit  11/21/2005 DONE
Routing - PLANNING11/14/2005 11/20/2005 PASS
Plans approved per stripping plans included in the Zoning Certificate file CZC05-00231.
Routing - Erosion and Sediment11/14/2005 11/14/2005 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK11/4/2005 11/10/2005 FAIL
Plans in hold bin pending resubmittals ///KMW
Plan resubmittals received  11/10/2005  
Received (5) copies of sheet C-1 through C-3 and the ESC Plan. Routed to Fire with original submittal.
Routing - FIRE11/10/2005 11/10/2005 PASS
resubmittal acceptable.
Routing - FIRE11/3/2005 11/3/2005 FAIL
called architect to discuss. He requested a detailed list of requirements. Faxed the following in lieu of a written review.
"Per our telcon of today, here are the FD access roadway requirements.

1. Approved Fire Department vehicle access roads shall be provided to within 150'-0" of all exterior portions of this building. All bridges, gates, public or private streets, individual or common driveways, or dedicated emergency vehicle access lanes, etc., which are considered "fire department vehicle access roads" shall have: a concrete or paved surface capable of supporting 70,000lbs. GVW and 24,000 lbs. per axle, a minimum of 20'-0" width, 48'-0" outside turning radius and 28'-0" inside radius, 13’ 6” overhead clearance, and no dead ends over 150 feet unless an approved turnaround is provided. Manually operated gates, if locked, shall be provided with a non-hardened lock, which can be cut without damage to Fire Department bolt cutters. (ref. IFC 503 and amendments per BMC 7-01-27 through 36).

2. For streets and fire access roadways having a width less than 36 feet back of curb to back of curb, parking shall be prohibited on one (1) side. For streets and fire access roads having a width less than 29 feet from back of curb to back of curb parking shall be prohibited on both sides of the street.
Areas where parking is prohibited shall be so designated by curb markings or No Parking signs by one of the following methods:
A. "No Parking Fire Lane" (or approved or standardized equal) signs shall be placed at all points of entry to properties or subdivisions and at 75 foot intervals on all sides of a vehicle pathway on which parking is prohibited. Signs shall face oncoming traffic.
B. “Notice All Roads Are Fire Lanes Park Only in Designated Parking Areas” (or approved or standardized equal) signs shall be placed at all points of entry to properties or subdivisions with marked parking stalls and shall face traffic entering the property.
C. All curbs along roads or lanes where parking is prohibited shall be painted red, contain 3 inch high by 3/4 inch stroke white letters reading Fire Lane-No Parking (or approved equal), with the lettering spaced every 50 feet on center. (IFC 503.8, BMC 7-01-34)

Please resubmit scaled plans showing the associated buildings and the intended FD access roadways which will meet these requirements, including one of the 3 signage options where private roadways are required for access.
The plan(s) should be resubmitted to the front desk where you originally submitted your permit application; not directly to me or the fire department."
Regards,
Sam Rogers
1st review completed  11/3/2005 FAIL
failed planning, ESC, plan check and fire.
Routing - PLAN CHECK11/1/2005 11/2/2005 FAIL
Darla or Kelly /// Failed Planning and ESC. Routed to Fire.
Routing - Erosion and Sediment10/31/2005 11/1/2005 FAIL
No rp listed on application and contractor is called out. Informed contractor via voice mail and "Judy" at Wells Fargo.
Routing - PUBLIC WORKS10/28/2005 10/31/2005 PASS
Routing - PLANNING10/31/2005 10/31/2005 FAIL
Sara S - Applicant needs to process a zoning certificate so that striping and parking stall dimensions can be reviewed. Called and left a message with Reese Leavitt. 10/31/05
Application received  10/25/2005  
Recd Pcfee & Taken To Pln CK  10/25/2005  
Fee Review-notes10/25/200510/25/2005