(F) Reprint permit | | | 10/12/2007 | | |
|
|
|
|
BLD-Final | 2/9/2007 | 2/9/2007 | 2/9/2007 | P | PASS |
Tony Young
|
|
|
Garage code the same--Call for any questions. Stair nosing has been replaced. Phone #: ###-####
|
DOC - Permit Finaled | 2/9/2007 | 2/9/2007 | 2/9/2007 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 2/8/2007 | 2/8/2007 | 2/8/2007 | | BOND |
|
|
|
The rough grading and drainage has been completed at the above mentioned address. However, revegetation, the driveway and the roof gutters have not been completed. For this the engineer has recommended a bond of $5,000.00. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Conference | 2/2/2007 | 2/5/2007 | 2/5/2007 | A | PART |
Tony Young
|
|
|
Looking at possible final for building--Garage code is . Phone #: ###-#### need stair nosings, hillside, driveway,, conf on final
|
BLD-Conference | 2/1/2007 | 2/2/2007 | 2/2/2007 | A | NH |
Tony Young
|
|
|
Conference to look at occupancy final. Phone #: ###-####
|
BLD-Energy code compliance | 8/22/2006 | 8/23/2006 | 8/23/2006 | A | PASS |
Tony Young
|
|
|
Brian, ; Phone #: ###-####
|
BLD-Energy code compliance | 8/22/2006 | 8/22/2006 | 8/23/2006 | P | PASS |
Tony Young
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 7/31/2006 | 8/1/2006 | 8/1/2006 | P | PASS |
Tony Young
|
|
|
Engineering and Prints located on second floor bar top.; Phone #: ###-#### Internet Inspection Request from: Kolee Galeazzi
|
BLD-Framing/Rough-in | 7/21/2006 | 7/24/2006 | 7/24/2006 | P | NR |
Tony Young
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley need seal pack and mech rough
|
BLD-Conference | 7/18/2006 | 7/18/2006 | 7/18/2006 | P | PASS |
Tony Young
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley general frame walk through
|
BLD-Foundation | 4/6/2006 | 4/6/2006 | 4/6/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/6/2006 at 12:08:56 AM. Contact: ###-####. wip,, may change east cololm ftg to piers
|
BLD-Footing | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PART |
Tony Young
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Footing | 3/24/2006 | 3/27/2006 | 3/27/2006 | A | PART |
Tony Young
|
|
|
late as possible//brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa mainly a conf.,, wip,, had to redo some areas for layout,, will re-call
|
PubWorks Subgrade Approval | 3/27/2006 | 3/27/2006 | 3/27/2006 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 2/13/2006 | 2/14/2006 | 2/16/2006 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/13/2006 at 11:40:11 PM. Contact: ###-####. no soils report filed,,, retaining walls under 4 ' ,, need no inspection
|
Issue PAID IN FULL permit | | | 1/10/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 10/26/2005 | 11/16/2005 | 11/29/2005 | | PASS |
|
|
|
11/29/2005 07:06:41 SAM - activity updated through activity BLDA022 from case BLD05-02981.
|
Routing - PLAN CHECK | 11/18/2005 | | 11/29/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2005 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/29/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 11/29/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/29/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Case Summary (BLD) | | | 11/28/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 11/17/2005 | | 11/18/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 11/7/2005 | | 11/17/2005 | | FAIL |
|
|
|
Plans failed pending resubmittal from engineer / designer. Routing for ESC approval.
|
Plan resubmittals received | | | 11/14/2005 | | |
|
|
|
Received 1 letter of transmittal , 2 copys of sheet SWP-1, & 2 copys of ESC Narratives. Taken to Steve Monroe/added to plans./// 11-15-05 dld
|
Routing - FIRE | 11/2/2005 | | 11/4/2005 | | PASS |
|
|
|
No fire sprinklers required for Ridgeline Dr. (Somerset Ridge #1 sub)
|
Routing - Erosion and Sediment | 11/1/2005 | | 11/2/2005 | | FAIL |
|
|
|
ESC plan does not meet requirments per BMC 8-17 ; Checklist completed and faxed to PD. Need additional measures to address trackout during winter months of construction. Sweeping is not enough.
|
Routing - PLANNING | 11/1/2005 | | 11/1/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/26/2005 | | 10/27/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 10/26/2005 | | 10/26/2005 | | PASS |
|
|
|
Approved as category 3
|
Application received | | | 10/25/2005 | | |
|
|
|
|
Routing - PLANNING | 10/27/2005 | | | | |
|
|
|
Called applicant 10/28/05 need a site plan
|