Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-03007
StatusFinaled
Name T-3 WIRELESS
Site Address 755 W BROAD ST
Project NameBODO BLDG #8
Customer Number 
ePlanReviewNo
Description
(T-3 WIRELESS - BODO BLDG #8 - 1ST STORY) This building is fire sprinklered because it is a high-rise building. To create a 793 square foot retail sales tenant space on the 1st story of an 11 story high-rise building. Egress is directly to the outside at grade. Work is to include interior nonbearing walls, suspended ceilings, a restroom accessible to the disabled, and finishes. The work is required to comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/6/2007 DONE
Third Notice BLD7/23/20077/23/20077/26/2007 DONE
Second Notice has not been responded to.
Second Notice BLD7/12/20077/12/20077/23/2007 DONE
First Notice has not been responded to.
First Notice 6/29/20077/12/2007 DONE
Permanent Occupancy 6/29/20076/29/2007 DONE
Details
Permanent occupancy  6/29/2007 DONE
Perm. Occ. Cert. # 11686 issuedc 6-29-07 to T-3 Wireless in BODO Bldg. #8.
BLD-Final4/6/20064/7/20064/7/2006ADONE
DetailsDave Hannah
Forrest is scheduled for the AM. Please check your records for his sign-off and come see Alex Monge, Ray Bakker and/or Dennis Harter for final inspection. We anticipate this space to be open for business tomorrow afternoon AFTER we receive TCO. Thanks.
BLD-Final4/7/20064/7/20064/7/2006PPASS
DetailsDave Hannah
Forrest is scheduled for the AM. Please check your records for his sign-off and come see Alex Monge, Ray Bakker and/or Dennis Harter for final inspection. We anticipate this space to be open for business tomorrow afternoon AFTER we receive TCO. Thanks. ok for temp occ ok for perm after fire gos perm
FIRE-Final Inspection4/6/20064/7/20064/7/2006APART
DetailsForrest France
Life safety is acceptable, final pending shell project related alarm and sprinkler permit finals. Temporary occupancy granted per D. Hanneman.
Temporary occupancy  4/7/2006 DONE
Temp. Occ. Cert. # 5395 issued 4-7-06 to T-3 Wireless.
BLD-Final3/27/20063/27/20063/28/2006PFAIL
DetailsDave Hannah
TCO; Phone #: ###-#### needs fire sign offs
FIRE-Final Inspection3/24/20063/27/20063/27/2006ANR
DetailsForrest France
FIRE-Final Inspection3/20/20063/22/20063/23/2006PFAIL
DetailsForrest France
The project related fire sprinkler permit must be finaled prior to life safety inspection, provide fire extinguisher with current tag mounted no higher than 48" AFF, occupancy is not approved until the related shell and core permits are finaled.
Plan resubmittals received  2/21/2006  
BLD-Conference1/27/20062/1/20062/2/2006APASS
DetailsDave Hannah
Conference at 10:00 AM Feb. 1st please contact Dennis to confirm Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in12/30/20051/3/20061/3/2006APASS
DetailsTom Arcoraci
John - Lombac for T3 wireless and Carre Chocolates; Phone #: ###-#### Internet Inspection Request from: Ben Kos
Permit Ready to Issue  12/5/2005 DONE
Print Occupancy Form  12/5/2005 DONE
Telephone call  12/5/2005 DONE
left mess for michael jones at ###-#### is ready
Issue PAID IN FULL permit  12/5/2005 DONE
Routing - PLAN CHECK12/2/2005 12/3/2005  
PLANS/APPL TAKEN TO FRONT DESK  12/3/2005 DONE
Plan assigned to (CJW)11/3/2005 12/3/2005 PASS
12/3/2005 07:54:06 CJW - activity updated through activity BLDA022 from case BLD05-03007.
Routing - PLANNING11/28/2005 12/2/2005 PASS
Approved.
Routing - PLAN CHECK11/23/2005 11/28/2005  
Sent to Planning to look at exterior.
1st review completed  11/23/2005 PASS
Routing - FIRE11/16/2005 11/23/2005 PASS
pass subject to plan annotations; A Fire sprinkler and Fire Alarm permit are required.
Plan Reviewer's activity  11/16/2005  
A copy of the plan review report was NOT sent to the Architect because an E-Mail address was not provided for him.
Routing - PLAN CHECK11/3/2005 11/16/2005 PASS
The IBC plan review was started on November 15 and was finished the next day. The drawings were approved with corrections. See the plan review report.
Routing - PUBLIC WORKS11/3/2005 11/3/2005 PASS
Plans ACCEPTED BY PLAN TECH  10/28/2005  
Application received  10/26/2005  
Recd Pcfee & Taken To Pln CK  10/26/2005