Permit EXPIRED | | | 11/7/2007 | | DONE |
|
|
|
This project is no longer being done. It will become a restaurant per Marlene.
|
Plan Reviewer's activity | | | 11/7/2007 | | DONE |
|
|
|
Discarded the drawings.
|
BLD-Framing/Rough-in | 8/9/2006 | 8/10/2006 | 8/10/2006 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/9/2006 at 5:59:46 PM. Contact: ###-####. c/n on site
|
FIRE-Conference | 7/12/2006 | 7/12/2006 | 7/12/2006 | P | DONE |
Troy Cobbley
|
|
|
Stop work order has been lifted since the fire alarm permit has been issued. I spoke to Brian with A&B Electric about this.
|
FIRE-Conference | 5/25/2006 | 5/25/2006 | 5/25/2006 | P | DONE |
Troy Cobbley
|
|
|
I issued a stop work order for all trades after finding fire alarm backboxes installed at project. No one was at the job site so I called the general contractor and spoke to him about the situation. I told him that I could lift the stop work order if the electrical contractor removed the parts of the fire alarm system that have been installed. Mary and Sam have been notified.
|
BLD-Framing/Rough-in | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/4/2006 at 9:57:12 AM. Contact: ###-####.needs other trades signed off
|
Routing - PUBLIC WORKS | 12/2/2005 | | 12/5/2005 | | PASS |
|
|
|
Sent back for re-evaluation of fees
|
Routing - PLAN CHECK | 12/5/2005 | | 12/5/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/5/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2005 | | DONE |
|
|
|
called ###-#### xt.209 and told Corey that permit is ready and fees
|
Issue PAID IN FULL permit | | | 12/5/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/4/2005 | | 12/5/2005 | | PASS |
|
|
|
12/5/2005 08:35:08 CJW - activity updated through activity BLDA022 from case BLD05-03015.
|
Routing - FIRE | 11/17/2005 | | 12/2/2005 | | PASS |
|
|
|
|
1st review completed | | | 12/2/2005 | | FAIL |
|
|
|
failed plan check.
|
Routing - PLAN CHECK | 12/2/2005 | | 12/2/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 11/22/2005 | | DONE |
|
|
|
Received 1 letter of transmittal, 1 plan review response,A2.0,A3.0,A4.0,A4.1,A5.0,E2.01,E2.1L,E2.OP,E3.0,P1.0,P2.1,H1.0,H2.1 Taken to Carl W.
|
Routing - PLAN CHECK | 11/7/2005 | | 11/17/2005 | | FAIL |
|
|
|
The IBC plan review was started on November 16, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 11/4/2005 | | 11/7/2005 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 11/4/2005 | | DONE |
|
|
|
Routed 3rd set of plans directly to Carl. Other 2 routing in standard process.
|
Plans ACCEPTED BY PLAN TECH | | | 10/31/2005 | | |
|
|
|
|
Application received | | | 10/27/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/27/2005 | | |
|
|
|
|
Fee Review-notes | 10/27/2005 | 10/27/2005 | | | |
|
|
|
|