Permit Information
Permit NumberBLD05-03016
StatusFinaled
Name RA SCHULTZ AND COMPANY
Site Address 13176 W PERSIMMON LN
Project NameLot 4 Mahogany Business Park
Customer Number 
ePlanReviewNo
Description
(BOISE SPEECH & HEARING CLINIC) To build out & finish a first time 1,711 sq.ft. tenant space for use as professional offices for speech & hearing clinic. Work includes wood frame construction to create perimeter walls; interior walls to create therapy & testing rooms, file storage, reception & waiting room with access hall to common core restrooms. To install interior millwork, suspended ceiling grid system, electrical, mechanical, plumbing, wall & floor finishes. (drs)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD4/14/20064/14/20068/4/2006 DONE
Second Notice has not been responded to.
Second Notice BLD3/29/20063/29/20064/14/2006 DONE
First Notice has not been responded to.
First Notice 3/16/20063/29/2006 DONE
BLD-Final3/15/20063/16/20063/16/2006APASS
DetailsJim Sly
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
OK for Perm Occ. :)
Permanent Occupancy 3/16/20063/16/2006 DONE
Details
Permanent occupancy UNPAID FEE  3/16/2006 DONE
Perm. Occ. Cert. # 10937 issued 3-16-06 to Boise Speech and Hearing Clinic.
FIRE-Final Inspection3/15/20063/15/20063/15/2006PPASS
DetailsTroy Cobbley
life safety finaled
BLD-Framing/Rough-in3/3/20063/3/20063/3/2006PPASS
DetailsJim Sly
Matt -- ceiling grid; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Framing/Rough-in2/8/20062/8/20062/8/2006PPASS
DetailsJim Sly
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Energy OK
BLD-Framing/Rough-in2/6/20062/7/20062/7/2006APASS
DetailsJim Sly
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Issue PAID IN FULL permit  1/31/2006 DONE
Telephone call  1/30/2006 DONE
called ###-#### and told Richard Schultz that permit is ready and fees
Permit Ready to Issue  1/30/2006 DONE
Plan assigned to (DRS)11/4/2005 1/27/2006 PASS
1/27/2006 09:46:25 DRS - activity updated through activity BLDA022 from case BLD05-03016.
Routing - PLAN CHECK12/5/2005 1/27/2006 PASS
Resubmittals attached to original plans. Routing to permit desk to issue.
Print Pending Permit.LaserJet4  1/27/2006  
PLANS/APPL TAKEN TO FRONT DESK  1/27/2006 PASS
Print Occupancy Form  1/27/2006 DONE
Telephone call  1/26/2006 DONE
Called architect office and talked with Doug Houston to review the city policy for determining occupant load for waiting / reception / conference rooms when the area is under 750 sq. ft. We can use a furniture plan layout or use and occupant load factor of 100 as a part of the office to determine the occupant load. For this 1,700 sq. ft. office the occupant load would be 17. The submittal documents in response to the plan review corrections came back with an occupant load of 39, using 7 for the occupant load factor for the waiting room. This higher occupant load, if this is actually the occupant load needed by the tenant will affect the number of plumbing fixtures needed for the tenant / building per chapter 29 IBC. After we discussed these factors it was determined that the designer had used the wrong occupant load factor and 17 was the needed occupant load. This is what we used.
Plan Reviewer's activity  1/26/2006 DONE
Reviewed architects response to plan review conditions report of 11/22/05. Made some red-line clarifications on plans refering to architect reponses and sketches attached to the plans to assist the building and the inspectors know what to look for.
Plan resubmittals received  1/25/2006 DONE
Given to Dan Stuart
Telephone call  1/20/2006 DONE
Phone call from RA Schultz Construction on status of permit. Corrections based on plan review were e-mailed & faxed to the architect on 11/23/05
Telephone call  1/20/2006 DONE
Called and talked with Doug Houston architect for project. Project has been on hold until last week. Corrections to plans are in process. should have by week of 1/23/06.
Routing - FIRE11/23/2005 12/5/2005 PASS
Approved with conditions to be field verified; review faxed to architect.
1st review completed  12/5/2005 FAIL
failed plan check.
Plan resubmittals requested  11/23/2005 DONE
Fax & e-mail to D Houston architect.
Routing - PLAN CHECK11/8/2005 11/23/2005 FAIL
Copy of plan review conditions needing to be addressed faxed e-mailed to architect of record. routing plans to fire code analyst for review.
Routing - PLUMBING11/7/2005 11/8/2005 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS11/4/2005 11/7/2005 PASS
Plans ACCEPTED BY PLAN TECH  11/1/2005  
Application received  10/27/2005  
Recd Pcfee & Taken To Pln CK  10/27/2005  
Fee Review-notes10/27/200510/27/2005