Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-03030
StatusExpired
Name ORCHARD CONDOMINIUMS
Site Address 1410 -1418 N MCKINNEY LN
Project NameThe Orchards-Fairview Bldg #8
Customer Number 
ePlanReviewNo
Description
(Bldg # 8) (Classic R Plan) To construct a new 8,060 square feet, two story, four unit apartment building. There are two Villa style units, each unit is single story, two bedroom, one and three/quarter bath at 1,280 square feet, with an attached 437 square feet, two car garage. There are two Chateau style units, each unit is two story, three bedrooms, and two and one half baths. The second story is 520 square feet, the first floor is 1,363 square feet for a total of 1,883 square feet, with an attached 430 square feet two car garage. NOTE: This building was approved to be submitted and constructed without fire sprinklers and does not have to meet Ordinance # 6432. All construction per the approved plans and attached comment list. MJP DRH 05-00191 CUP 05-00030 (The following are the address Unit A is 1418, B is 1412, C is 1410 & D is 1416)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  12/16/2009 DONE
PRINT Activities  12/16/2009 DONE
BLD-Aging Inspection11/18/200911/18/200911/18/2009 PASS
DetailsTom Arcoraci
DOC - Permit Expired11/18/200911/18/200911/18/2009PPASS
DetailsTom Arcoraci
BLD-Aging Inspection9/18/20099/18/20099/18/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection7/13/20097/13/20097/13/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection5/11/20095/11/20095/11/2009 PASS
DetailsTom Arcoraci
no contsruction at this time
BLD-Aging Inspection3/9/20093/9/20093/9/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection1/7/20091/7/20091/7/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection11/6/200811/6/200811/6/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection8/1/20088/1/20088/1/2008 PEND
DetailsTom Arcoraci
BLD-Aging Inspection5/29/20085/29/20085/29/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection2/12/20082/12/20082/12/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection11/27/200711/27/200711/27/2007 CANC
DetailsTom Arcoraci
BLD-Aging Inspection9/26/20079/26/20079/26/2007 NR
DetailsTom Arcoraci
BLD-Aging Inspection7/24/20077/24/20077/24/2007 NR
DetailsTom Arcoraci
wip
BLD-Aging Inspection5/14/20075/14/20075/14/2007 PART
DetailsTom Arcoraci
BLD-Aging Inspection3/12/20073/12/20073/12/2007 PASS
DetailsTom Arcoraci
wip
BLD-Aging Inspection3/12/20073/12/20073/12/2007 PASS
DetailsTom Arcoraci
wip
BLD-Aging Inspection12/19/200612/19/200612/19/2006 PASS
DetailsTom Arcoraci
Routing - PLANNING11/17/2005 11/18/2006 PASS
Approved per DRH05-00191.
BLD-Aging Inspection10/19/200610/19/200610/19/2006 PASS
DetailsTom Arcoraci
Issue PAID IN FULL permit  7/20/2006 DONE
Print Occupancy Form  6/20/2006 DONE
Plan assigned to (M_P)11/3/200511/3/20056/16/2006 PASS
6/16/2006 15:48:31 M_P - activity updated through activity BLDA022 from case BLD05-03030.
Routing - PLAN CHECK2/16/2006 6/16/2006 PASS
Received satisfaction of nonbuild.
PLANS/APPL TAKEN TO FRONT DESK  6/16/2006 DONE
Print Pending Permit.LaserJet4  6/16/2006 DONE
Plan resubmittals received  6/1/2006  
Received 1 copy of cover letter to Mike Phillips, 1 copy of Letter from Stapley Engineering to Jeff Likes, 1 copy of the following pages- Chateau roof framing plan, Sheet # SK-1, SK-2, 1 copy of Letter from Stapley Engineering to Jeff Likes, 1 copy of the following pages- Canterbury roof framing plan, SK-3, Chateau roof framing plan, SK-4, SK-5, 1 page letter from Boise Wood Solutions, SK-6 and taken to Dave Hannah per MIke Phillips request///6/1/06 @ 9:40am BAS
Routing - FIRE2/15/2006 2/16/2006 PASS
No comments.
Routing - PLAN CHECK2/7/2006 2/15/2006  
Routing to fire.
Routing - PLANNING Land Div11/3/2005 2/7/2006 PASS
Routing - PLAN CHECK1/19/2006 2/7/2006 FAIL
Second review failed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Telephone call  1/27/2006 PASS
Spoke with Jason Densmer regarding the 150 ft. access requirements. Based on the point of origin for measurements regarding the 150 ft. access being interpreted differently, and approval from Dave Miller, the corrections for resubmittal items will be waived for Bldgs #5,#6 and #8.
Plan resubmittals received  1/23/2006 DONE
Received 1 letter of transmittal,1 Memo,1 project start up special inspections,1 construction descripton stud wood wall,1 letter to Billy Strite, & 2 copys of sheets SD-1,EN1.1,EN1.2,CL-111 2.4,CL-111 3.1EC,CL-111 3.1.5EC,CL-111 3.2EC,CL-1113.2.5,CL-111 3.3EC,CL-1113.3.5,CL-111 5.1EC,CL-1115.2,CL-111 5.3EC,CL-111 5.4EC,CL-111 6.2EC,CL-111 7.1,CL-111 7.2,CL-111 7.2.5,CL-111 7.3,CL-111 7.3.5,CL-111 9.3, CL-1119.4 CL-111 9.5,CL-111 9.6,CL-111 9.7,CL-111 9.8,CL-111 9.8,CL-111 10.1,CL-111 10.2,CL-111 10.3,CL-111 C-3.1,C-3.2 taken to Mike P.
Routing - PLANNING1/10/2006 1/19/2006 PASS
per CUP05-30 & phasing plan
Routing - PLAN CHECK1/9/2006 1/10/2006  
Routing to planning for review of CUP and sign off of DR.
Routing - FIRE12/30/2005 1/9/2006 FAIL
See attached comments. Faxed to architect.
1st review completed  1/9/2006 FAIL
Failed Plan Check and Fire.
Routing - PLAN CHECK11/18/2005 12/30/2005 FAIL
Plan review complete, send correction report to architect. I am requesting additional information be submitted for further review prior to issuing permit.
Routing - PLUMBING11/10/2005 11/17/2005 PASS
see bld05-03020
Routing - PUBLIC WORKS11/7/2005 11/10/2005 PASS
Routing - Erosion and Sediment11/10/2005 11/10/2005 PASS
ESC plan approved with attached conditions. 11/10/05 Reference ESC05-01821 as Master Plan for project. adh.
Recd Pcfee & Taken To Pln CK  11/3/2005  
Plans ACCEPTED BY PLAN TECH  11/3/2005  
Application received  10/27/2005  
Fee Review-notes11/3/200511/3/2005   
Plan routing begun/NEW & ADDTN