Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-03054
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 3850 S ORCHARD ST
Project NameAPPLETON HANGER
Customer Number 
ePlanReviewNo
Description
RCE-1875 (Appleton Airsports Hanger) - To construct a 26,445 sq. ft. two story, Type IIB aircraft hanger with office space. Other work includes all site improvements, paving and landscaping per approved plans and attachments. The building has fire sprinklers as regulated by the Boise Fire Dept. which has been used for an area increase. First floor has 23,635 sq. ft., second floor has 2,810 sq. ft. This building has been designed for unseparated uses per the IBC.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD4/27/20074/27/200712/30/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Telephone call  10/4/2007  
tlk to adam 2:30 regarding the final values he said that he will being looking at bld05-02719, bld05-03054, bld06-00569 and bld05-2616 will be given to Ron Juhnke
Second Notice BLD4/9/20074/9/20074/27/2007 DONE
First Notice has not been responded to.
First Notice 3/30/20074/9/2007 DONE
Permanent occupancy UNPAID FEE  3/30/2007 DONE
Perm. Occ. Cert. # 11507 issued 3-30-07 to the Appleton Hangar.
Permanent Occupancy 3/29/20073/29/2007 DONE
Details
BLD-Final3/27/20073/28/20073/28/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/27/2007 at 3:16:32 PM.
FIRE-Final Inspection3/26/20073/27/20073/27/2007APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection3/26/20073/26/20073/26/2007PFAIL
DetailsTroy Cobbley
Fees still have not been paid for the fire alarm permit. No inspection performed.
FIRE-Final Inspection3/23/20073/23/20073/23/2007PFAIL
DetailsTroy Cobbley
No inspection performed since there is a hold due to unpaid alarm contractor permit fees.
PubWorks Occupancy Approval2/28/20072/28/20072/28/2007 DONE
Signed off project 02/23/07 R. Anderson.
BLD-Other2/23/20072/26/20072/26/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/23/2007 at 10:24:48 AM. Contact: ###-####.ceilling ok for cover.
FIRE-Final Inspection2/23/20072/23/20072/23/2007PCANC
DetailsTroy Cobbley
Wrong job called in. No inspection performed.
BLD-Framing/Rough-in1/4/20071/5/20071/5/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/4/2007 at 5:02:51 PM.
BLD-Framing/Rough-in1/3/20071/4/20071/4/2007PPART
DetailsJim Storey
mike ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
OVERRIDE  12/8/2006  
CHANGE STATUS TO (ISS)  12/8/2006  
per mike otto change back to issued status
Print Occupancy Form  12/8/2006 DONE
Telephone call  12/8/2006  
lft ms with ben peterson ###-#### that plan modification is ready to be picked up fee $46.31
Permit Ready to Issue  12/8/2006 DONE
Plan assigned to (MLO)12/1/200612/1/200612/7/2006 PASS
12/7/2006 09:37:44 MLO - activity updated through activity BLDA022 from case BLD05-03054.
Routing - PLAN CHECK12/4/2006 12/7/2006 PEND
Plan modification - This modification is pending a code interpretation on accessible elements given to the Building Official on 12/7/2006. MLO
PLANS/APPL TAKEN TO FRONT DESK  12/7/2006 DONE
Plan Modification Accepted  12/1/2006  
PLan modification accepted for the redesign of kitchen counter hieghts in room 202 on sheet A-15 and routed to Mike Otto
BLD-Other11/7/200611/7/200611/7/2006PPART
DetailsJim Storey
mike Note: fire rated assembly in metal stub framing ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 2hr ceilling ok
BLD-Aging Inspection11/2/200611/2/200611/2/2006 PASS
DetailsJim Storey
wip
BLD-Aging Inspection8/30/20068/30/20068/30/2006 NR
DetailsJim Storey
no requist for insp.
BLD-Footing6/28/20066/29/20066/29/2006APART
DetailsTony Young
mike ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
pending s. i. report,, MTI on site
CHANGE STATUS TO (ISS)  6/5/2006 DONE
fees paid and picked up permit
(F) Reprint permit  6/5/2006  
Print Occupancy Form  6/2/2006 DONE
Telephone call  6/2/2006 DONE
left mess for petra at ###-#### that plan mod is ready
Permit Ready to Issue  6/2/2006 DONE
Plan assigned to (MLO)5/26/20065/26/20066/1/2006 PASS
6/1/2006 15:38:03 MLO - activity updated through activity BLDA022 from case BLD05-03054.
PLANS/APPL TAKEN TO FRONT DESK  6/1/2006 DONE
Routing - FIRE5/31/2006 6/1/2006 PASS
No new review comments.
Routing - Erosion and Sediment5/30/2006 5/31/2006 PASS
Routing - PLAN CHECK5/31/2006 5/31/2006 PASS
Routing - PUBLIC WORKS5/26/2006 5/30/2006 PASS
Routing - AIRPORT5/26/2006 5/26/2006 PASS
received letter from Amy Synder airport staff dated 4/24/2006 approving location change of airsports hanger. MLO
Plan Modification Accepted  5/26/2006  
Plan modification accepted for Bld05-03054 for the revision of parking configuration and new landscape, and islands added. Site grading and drainage plan completely revised with new finished floor elevation and revised seepage bed configuration. Site area and building configuration has remained unchanged. On sheets SP-1, ESC-1, L-1, C-1, C-2. Routed to Mike Otto.
(F) Reprint permit  5/3/2006  
Issue PAID IN FULL permit  5/2/2006 DONE
Telephone call  4/4/2006 DONE
called ###-#### and told Cornel Larson that permit is ready, fees, need RP and ACHD
Plan Modification Accepted  3/17/2006 PASS
Approved faxed request to relocate the proposed new hydrant on the west side of the building approx. 15' further north and directly west to the west edge of pavement, as shown on the revised approved sketch; faxed back to the architect.
Permit Ready to Issue  1/12/2006 DONE
Telephone call  1/12/2006 DONE
called ###-#### and told Cornel Larson that permit is ready, fees, need RP and ACHD
Print Occupancy Form  1/11/2006 DONE
Routing - FIRE1/4/2006 1/10/2006 PASS
to check draft curtain design.
1/5/06-failed - depth of beam used as draft curtain doesn't appear adquate. architect to fax revised dimensioned elevation details verifying required curtain depth at wall and center of building.
Holding plans for receipt of fax which architect promised to send today.
1/10/6- Passed-the revised elevation details faxed by architect shows the taller z-purlins to be used will result in adequate curtain depth from underside of deck to bottom of curtain (solid structural beam).
PLANS/APPL TAKEN TO FRONT DESK  1/10/2006 DONE
Plan assigned to (MLO)11/4/2005 1/10/2006 PASS
1/10/2006 12:30:55 MLO - activity updated through activity BLDA022 from case BLD05-03054.
Routing Off Site - STRUCTURAL12/21/2005 1/4/2006 PASS
12/21/05 Called PDQ to deliver to outside structural reviewer.
Routing - PLAN CHECK1/4/2006 1/4/2006 PASS
Plan resubmittals received  12/20/2005 DONE
Received 1 transmittal letter, 1 response,1 letter to Mike Otto, 2 revised calcs,& 3 copys of sheets S-0,S-1,S-2,S-3,S-4,S-5 & 1 letter from Steve Appleton. taken to Mike Otto
Plan resubmittals received  12/19/2005 DONE
Received 1 letter of transmittal ,1 response, 3 copys of sheets 14 of 22, 22 of 22 , & 3 copys of sheets A-1,A-4,A-5,A-6,A-7,A-11,A-13 taken to Mike Otto
1st review completed  11/29/2005 FAIL
FAILED PLAN CHECK. PASSED FIRE WITH CONDITIONS -SR/GR
Routing - PLAN CHECK11/29/2005 11/29/2005 PEND
Routing - FIRE11/22/2005 11/28/2005 PASS
routed to FV 11/23
Routing - PLAN CHECK11/15/2005 11/22/2005 FAIL
corrections sent to architect
Routing Off Site - STRUCTURAL11/4/2005 11/22/2005 FAIL
corrections sent to architect
Plan resubmittals requested  11/22/2005 DONE
IBC structural and non-structural corrections
Routing - PLUMBING11/10/2005 11/15/2005 PASS
do not connect trench drain vent to other sanitary vents.
Routing - PUBLIC WORKS11/7/2005 11/10/2005 PASS
Routing - Erosion and Sediment11/10/2005 11/10/2005 PASS
ESC plan approved with attached conditions.
Routing - PLANNING Land Div11/4/2005 11/7/2005 PASS
Plans ACCEPTED BY PLAN TECH  11/3/2005  
Plan routing begun/NEW & ADDTN  11/3/2005  
Application received  10/31/2005  
Recd Pcfee & Taken To Pln CK  10/31/2005  
Fee Review-notes10/31/200510/31/2005   
Routing - PLAN CHECK6/1/2006