Case Summary (BLD) | | | 7/2/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 7/2/2012 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/18/2007 | | |
|
|
|
|
CHANGE STATUS TO (FNL) | | | 4/18/2007 | | DONE |
|
|
|
|
Second Notice BLD | 3/30/2007 | 3/30/2007 | 4/2/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/14/2007 | 3/30/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | 3/14/2007 | 3/14/2007 | | DONE |
|
|
|
|
Routing - FIRE | 3/14/2007 | | 3/14/2007 | | DONE |
|
|
|
Per Dave Hanneman, ok to final permit based on bond being posted for completion of 2nd access roadway by 5-14-07
|
Permanent occupancy UNPAID FEE | | | 3/14/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11479 issued 3-14-07 to the Fed Ex Distribution Center.
|
FIRE-Conference | 3/2/2007 | 3/2/2007 | 3/2/2007 | | DONE |
|
|
|
Onsite fire conference at request of neighboring property owner, Jeff Amswald (Whiteman Ind's.), with Dave Hanneman and Bryan Ellsworth, FedEx building contractor; regarding the latest proposed FD access connector roadway onto Whiteman property. Mr. Amswald prefers not to accommodate FedEx's request due to the location, grade and restriction of future expansion plans. D. Hanneman determined by inspection, the proposed roadway location would not be acceptable due to steep grade. Mr. Amswald has discussed the issue with the owner of the roadway parcel to the east (Bob Russell, Industrial West Group, ###-#### ext 203) and believes he would be receptive to negotiating a cross access easement with FEDEX to allow the connection as shown on the issued, approved plans. It was agreed we would contact Mr. Russell to explain the City FD access requirements as they apply to future development of the surrounding property as well as to determine his willingness to consider this option for FedEx.
|
Telephone call | | | 3/2/2007 | | DONE |
|
|
|
Telcon with Bob Russell, owner of the roadway to the east of FedEx to discuss FD access requirements. He indicated he is working with FedEx and he expected they would be able to get the papers signed within a couple of days; he indicated he will be charging them for the cross-access agreement. He said he is well aware of our requirements; that he met with our FD 3 times in conjunction with the Planning Dept and will be putting in approx. 3000' of roadway connecting to Eiseman to provide a second access to his currently undeveloped property.
|
Plan resubmittals received | | | 2/26/2007 | | |
|
|
|
Received 1 cover letter and 1 copy of A1.01 and taken to Sam Rogers///2/26/07 BAS
|
Routing - FIRE | 2/26/2007 | | 2/26/2007 | | FAIL |
|
|
|
Review of resubmitted plan A1.01 showing a different proposed access onto adjoining property to the south; discussion with Renn Ross & Dave Hanneman; telconference with architect, Richard, and contractor, Bryan Ellsworth. Architect will revise plans slightly for required turning radius and resubmit tomorrow morning; Bryan Ellsworth will contact the adjacent property owner and try to get his approval for a legal cross access easement for the proposed roadway. Fire not willing to grant TOC until there is approval of the proposed roadway by the adjacent property owner.
|
BLD-Final | 2/22/2007 | 2/23/2007 | 2/23/2007 | P | PASS |
Jim Storey
|
|
|
dale ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith pending others.
|
Case Summary (BLD) | | | 2/23/2007 | | |
|
|
|
|
FIRE-Final Inspection | 2/22/2007 | 2/23/2007 | 2/22/2007 | A | PART |
Forrest France
|
|
|
Per inspection completed on 2/22/07, correction notice items have been completed. Fire life safety final pending completion of an approved secondary FD access road meeting requirements of the attatched fire code review notes. Okay for temp. occupancy for a period of two weeks per Ren Ross, Boise City FD.
|
FIRE-Final Inspection | 2/15/2007 | 2/15/2007 | 2/15/2007 | A | FAIL |
Forrest France
|
|
|
Final pending the secondary FD access roadway, also need to repair non-functional emergency lighting in the office area and repair door hardware at the N. exit door to the warehouse from the office area., noted approved plans are no longer on site for review.
|
BLD-Final | 2/14/2007 | 2/15/2007 | 2/15/2007 | A | DEFR |
Jim Storey
|
|
|
Sign off final so EKC can pick up certificate of occupancy. Phone #: ###-#### fire isue
|
Meeting | | | 2/12/2007 | | DONE |
|
|
|
Okay to approve for TOC for 14 days; subject to completion of the required second FD access roadway per IFC plan review comments within 14 days (2/26/07) per below email string from Renn Ross.
>>> Samuel Rogers 2/12/2007 11:30 AM >>>
Will do.
>>> Renn Ross 2/12/2007 10:08 AM >>>
I'm fine with giving it to them now.
>>> Samuel Rogers 2/12/2007 10:01 AM >>>
Thanks, Renn. We'll look forward to their letter and revised site plan.
As you probably know, Fire has done a final inspection and found that everything except the second entrance was acceptable.
So, do you want us to give them a TOC now, or should we wait until we receive the letter from the owner and revised plans first? (My concern is that if we give them a TOC before they get the revised plans submitted and approved, they may not be able to get the work completed within the stipulated two week TOC period).
Please let me know what you'd like us to do.
Sam
>>> Renn Ross 2/9/2007 4:25 PM >>>
Sam,
I met with the reps of the Fed Ex project and we have come up with a possible secondary access solution. From FIRE, I will approve temporary C.O. for two weeks to allow them to work with the property owner. They are also doing a revised site drawing and a follow up letter.
Thanks
Renn
|
Telephone call | | | 2/8/2007 | | DONE |
|
|
|
spoke with architect who wanted a meeting to appeal the 2nd fire road connection; I referred him to D. Hanneman.
|
FIRE-Final Inspection | 2/6/2007 | 2/6/2007 | 2/6/2007 | P | FAIL |
Troy Cobbley
|
|
|
Life safety finaled - fire dept access road still an issue per troy
|
FIRE-Final Inspection | 1/11/2007 | 1/12/2007 | 1/12/2007 | A | NR |
Forrest France
|
|
|
Pending project related fire alarm and fire sprinkler permit final inspections and approvals.
|
BLD-Final | 12/27/2006 | 12/28/2006 | 12/28/2006 | A | PART |
Jim Storey
|
|
|
DALE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles//ok to final after code enforcement
|
BLD-Other | 12/13/2006 | 12/13/2006 | 12/13/2006 | P | NR |
Jim Storey
|
|
|
Dale; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
|
BLD-Framing/Rough-in | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | DEFR |
Jim Storey
|
|
|
Dale; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett to pm
|
BLD-Other | 12/5/2006 | 12/6/2006 | 12/6/2006 | P | NR |
Jim Storey
|
|
|
dale - note: ceiling ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Meeting | | | 10/17/2006 | | DONE |
|
|
|
Sent the following email reply 10/17/06 to Brian Ellsworth's emailed question as to whether S&H vents could be eliminated.
"I did, just this afternoon. Chief Hanneman feels we must stay with the requirement for the smoke/heat vents as stated in IFC 910.2.1. This is mainly due to the 29' high roof which is 13' above the top of the 16' overhead doors. This 13' space will entrap smoke and the FD fans would not be capable of removing the smoke; whereas the vents would allow it to be promptly and effectively evacuated. I have advised Richard Honsinger of the decision by phone but do not have his email to send it in writing. Would you please forward this email on to him as written confirmation of the decision.
Thank you for your patience in getting this final decision. Sam Rogers"
>>> "Brian Ellsworth" 10/16/2006 5:22 PM >>>
Sam, Did you get a chance to talk to the fire marshal to day regarding FedEx? We are at a point where the steel erector is finishing up all his work and is considering moving onto the smoke hatch work. Thanks, Brian
|
BLD-Framing/Rough-in | 10/6/2006 | 10/9/2006 | 10/9/2006 | A | PASS |
Jim Storey
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wall framing ok
|
BLD-Aging Inspection | 8/31/2006 | 8/31/2006 | 8/31/2006 | | NR |
Jim Storey
|
|
|
wip
|
BLD-Foundation | 6/28/2006 | 6/29/2006 | 6/29/2006 | A | PART |
Dave Hannah
|
|
|
dale - as early as possible; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley last part of dock wall mti will also be on site later to inspect and test concrete
|
BLD-Footing | 6/20/2006 | 6/21/2006 | 6/21/2006 | A | PASS |
Jim Storey
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley pwsi
|
BLD-Footing | 6/14/2006 | 6/15/2006 | 6/15/2006 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chilespwsi
|
BLD-Footing | 6/12/2006 | 6/13/2006 | 6/13/2006 | A | PASS |
Jim Storey
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles si pending
|
BLD-Footing | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | PART |
Jim Storey
|
|
|
DALE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pending si reports rebar wip
|
(F) Reprint permit | | | 5/3/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/2/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/2/2006 | | DONE |
|
|
|
Sent Brian Ellsworth a corrected fire code review dated 12/6/05, omitting the previous fire code review which stated that smoke and heat vents were not required. Smoke and heat vents are required as stated on revised review comments dated 5/2/06 faxed to Brian Ellsworth.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/27/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/27/2006 | | DONE |
|
|
|
lft vm with andy esrstad ###-#### that permit and fees are ready to be picked up need ACHD & GC RCE
|
Permit Ready to Issue | | | 4/27/2006 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 11/4/2005 | | 4/27/2006 | | PASS |
|
|
|
4/27/2006 10:09:45 MLO - activity updated through activity BLDA022 from case BLD05-03068.
|
Routing - FIRE | 4/19/2006 | | 4/20/2006 | | PASS |
|
|
|
Faxed review comments to architect. Attached review comments to plans.
|
Routing - PLAN CHECK | 4/20/2006 | | 4/20/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/17/2006 | | 4/18/2006 | | PASS |
|
|
|
All new civil and site plans submitted need to recheck
|
Routing Off Site - STRUCTURAL | 3/14/2006 | | 4/17/2006 | | PASS |
|
|
|
Called Action Couriers for pick up
|
Plan resubmittals received | | | 4/13/2006 | | |
|
|
|
recieved 5 copies of a1.1, C1.0, C1.2, C2.0, C2.1, C3.0, C4.0, C5.0, C6.0 (Note: all copies of C6.0 not signed by architect), letter of response, and addendum to hydroligical assessment report taken to Mike O.
|
Plan resubmittals received | | | 3/10/2006 | | |
|
|
|
Received 1 copy of cover transmittal, 1 copy of letter response to structural review comments, 1 copy of project start up for special inspections, 3 copies of the following- C1, ES-1, F1, F2, F3, E1, E2, E3, E4, E5, E6, E7, E8, E9, E10, E11, E12, E13, E14, E15, NS-1, NS-2, NS-3, NS-4, NS-5 and taken to MIke O.
|
Plan resubmittals received | | | 3/3/2006 | | DONE |
|
|
|
Received 1 fax transmittal for Sam R. Taken to Mike O. Given to S. Rogers
|
Routing - PLUMBING | 3/1/2006 | | 3/2/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 3/2/2006 | | 3/2/2006 | | PEND |
|
|
|
pending further action
|
Plan resubmittals received | | | 2/28/2006 | | |
|
|
|
Received 1 transmittal letter and 3 copies of P1.0, and 3 copies of P.01 and taken to Mike O.
|
Routing - FIRE | 12/28/2005 | | 1/3/2006 | | FAIL |
|
|
|
Secondary FD Access road has not been addressed by architect.
|
Routing - PLAN CHECK | 1/3/2006 | | 1/3/2006 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 12/21/2005 | | 12/22/2005 | | PEND |
|
|
|
|
Routing - PLUMBING | 12/20/2005 | | 12/21/2005 | | FAIL |
|
|
|
Still need to re-submitt on note 2 on original plan review.
|
Routing - PLAN CHECK | 12/19/2005 | | 12/20/2005 | | PEND |
|
|
|
pending structural review.
|
Routing - PUBLIC WORKS | 12/20/2005 | | 12/20/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/16/2005 | | DONE |
|
|
|
Received 1 transmittal,1 plan review comments,2 copys of sheets A2.11,A2.12,A2.21,A3.11 3 copys of sheets C1.1,C2.0,C2.1,C3.0,C4.0,C5.0,A1.11 , C1 OF 1 ES-1 & 6 copys of sheets PF-01,PF-02,PF-03,PF-04 Taken to Mike Otto
|
Routing - Erosion and Sediment | 12/13/2005 | | 12/13/2005 | | PASS |
|
|
|
ESC resubmittal plan approved with attached conditions.
|
Routing - PLAN CHECK | 12/13/2005 | | 12/13/2005 | | PEND |
|
|
|
|
1st review completed | | | 12/8/2005 | | FAIL |
|
|
|
FAILED FIRE, EROSION, PUBLIC WORKS, PLUMBING AND PLAN CHECK.
|
Routing - PLAN CHECK | 12/8/2005 | | 12/8/2005 | | PEND |
|
|
|
|
Routing - FIRE | 11/30/2005 | | 12/6/2005 | | FAIL |
|
|
|
Routed to FV 12/1/05
|
Routing - PLAN CHECK | 11/17/2005 | | 11/30/2005 | | FAIL |
|
|
|
corrections sent to architect
|
Routing Off Site - STRUCTURAL | 11/9/2005 | | 11/30/2005 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 11/30/2005 | | DONE |
|
|
|
IBC structural and non-structural
|
Plan resubmittals received | | | 11/21/2005 | | DONE |
|
|
|
received esc revisions
|
Routing - PLANNING | 11/9/2005 | | 11/17/2005 | | PASS |
|
|
|
Approved per DRH05-00321. SMS
|
Routing - PLUMBING | 11/8/2005 | | 11/9/2005 | | FAIL |
|
|
|
use boise city approved interceptor detail, attached. trap and vent trench drains. provide detail for the septic tank and pump chamber.
|
Routing - Erosion and Sediment | 11/8/2005 | | 11/8/2005 | | FAIL |
|
|
|
ESC plan failed to meet requirements. PD contacted and faxed checklist.
|
Routing - PUBLIC WORKS | 11/7/2005 | | 11/8/2005 | | FAIL |
|
|
|
Sewage collection system (existing) is a greywater system. Contact Jim Pardy ###-####: Street light plan required for entrance. Contact Hank ###-####
|
Routing - PLANNING Land Div | 11/4/2005 | | 11/7/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/4/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 11/4/2005 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/4/2005 | | 11/4/2005 | | |
|
|
|
Called PDQ for pick upb -partial submittal only. MLO
|
(F) Reprint permit | | | 11/4/2005 | | DONE |
|
|
|
|
Application received | | | 11/1/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/1/2005 | | |
|
|
|
|
Fee Review-notes | 11/1/2005 | 11/1/2005 | | | |
|
|
|
|