Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-03074
StatusExpired
Name TOMLINSON & ASSOCIATES INC
Site Address 802 W BANNOCK ST
Project NameHOFF BLDG-8TH FLR
Customer Number 
ePlanReviewNo
Description
(HOFF BUILDING - 8TH STORY - CORE UPGRADES) This building is fire sprinklered because it is a high-rise building. To remodel the 8th story core area of the Hoff Building. The total floor area of the 8th story is about 4,017 square feet. Except for an electrical room that has its only egress door directly into the interior stairway, all areas on the 8th story shall have access to both stairways without passing through the interior stairway or through a tenant space. Work is to include selective demolition, a 2-hr stair enclosure wall, a 90 minute stair enclosure door, and an interior corridor wall. This permit does NOT establish a Certificate of Occupancy for any tenant. The work is required to comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other2/28/20133/1/20133/4/2013APASS
DetailsDave Hannah
I walked this project with Carl westfall work was completed but never finaled.
DOC - Permit Expired7/13/20117/13/20117/13/2011PPASS
DetailsDave Hannah
BLD-Aging Inspection7/6/20117/6/20117/13/2011 PASS
DetailsDave Hannah
BLD-Aging Inspection4/6/20114/6/20114/14/2011 PASS
DetailsDave Hannah
BLD-Aging Inspection12/27/201012/27/201012/28/2010 DEFR
DetailsDave Hannah
BLD-Conference10/25/201010/25/201011/1/2010APASS
DetailsDave Hannah
BLD-Aging Inspection10/25/201010/25/201010/25/2010 PASS
DetailsDave Hannah
BLD-Conference8/25/20108/25/20108/25/2010APASS
DetailsDave Hannah
BLD-Aging Inspection8/23/20108/23/20108/25/2010 PASS
DetailsDave Hannah
FIRE-Final Inspection6/22/20106/23/20106/23/2010AFAIL
DetailsForrest France
Relocate one exit sign per plan as discussed.
BLD-Aging Inspection6/7/20106/7/20106/7/2010 PASS
DetailsDave Hannah
Talked with Randy he will start trying to clean up this permit.
BLD-Final2/27/20092/27/20092/27/2009ANR
DetailsDave Hannah
needs fire finals
BLD-Final2/25/20092/26/20092/27/2009PCANC
DetailsDave Hannah
Melissa ###-#### xt.203
FIRE-Final Inspection2/25/20092/26/20092/26/2009AFAIL
DetailsTroy Cobbley
Provide exit signs and emergency lighting as per the approved plans. Replace the round door knobs as marked on the plans with approved single action hardware.
BLD-Aging Inspection3/14/20063/14/20063/14/2006 PASS
DetailsDave Hannah
Issue PAID IN FULL permit  12/13/2005 DONE
Plan assigned to (CJW)11/7/2005 12/5/2005 PASS
12/5/2005 10:50:16 CJW - activity updated through activity BLDA022 from case BLD05-03074.
Routing - FIRE11/19/2005 12/5/2005 PASS
1st review completed  12/5/2005 PASS
Routing - PLAN CHECK12/5/2005 12/5/2005  
PLANS/APPL TAKEN TO FRONT DESK  12/5/2005 DONE
Inspection Record Card- Bld  12/5/2005 DONE
Permit Ready to Issue  12/5/2005 DONE
Telephone call  12/5/2005 DONE
called ###-#### and left John a voicemessage that permit is ready and fees
Routing - PLAN CHECK11/7/2005 11/19/2005 PASS
The IBC plan review was started on November 19, 2005 and was finished the same day. See the plan review report.
Plans ACCEPTED BY PLAN TECH  11/4/2005  
Application received  11/2/2005  
Recd Pcfee & Taken To Pln CK  11/2/2005 DONE
Fee Review-notes11/2/200511/2/2005