Permit Information
Permit NumberBLD05-03105
StatusFinaled
Name ANDERSON BLACK EAGLE
Site Address 9050 W OVERLAND RD
Project NameANDERSON BLACK EAGLE BLDG
Customer Number 
ePlanReviewNo
Description
Anderson Black Eagle - (Shell & Core) - To construct a new 32,640 square foot, two story office and retail shell and core building and related site improvements. This building is constructed of concrete floor, concrete tilt-up exterior walls, metal stud and roof system. This building is fully fire sprinklered. The sprinklers are used for area increase. This building was reviewed as a non-separated uses building. First Floor: 15,950 square feet, Second Floor: 16,690 square feet. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM - 5/8/06 This building permit is being modified to include a drive-thru window and aisle on the east side of the building. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/14/2008  
First Notice11/15/200611/15/200612/22/2006 DONE
DetailsMike Jordan
Code Occupancy Approval Temp11/7/200611/7/200611/21/2006PPASS
DetailsScott M.Brown
STRIPPING AND DUMPSTER GATES NOT IN, TO BE DONE IN 48 HOURS. I SIGNED TEMP ONLY TILL MONDAY, IF THESE NOT IN WILL BOND.
BLD-Final11/15/200611/15/200611/15/2006PPASS
DetailsMike Jordan
harold; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
DOC - Permit Finaled11/15/200611/15/200611/15/2006PPASS
DetailsMike Jordan
letter of compliance issued for shell and core. All issues have been resolved.
BLD-Final11/13/200611/13/200611/13/2006PNR
DetailsMike Jordan
Harold; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Lock indicator installed, all other issues have been resolved. Needs code enforcement to final and final out mech. permit from debest.
BLD-Final11/8/200611/8/200611/8/2006PPART
DetailsMike Jordan
harold ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Ok for temp occ. Needs to install locking indicator, complete firecaulking, provide final aff. letter from special insp. agency and get final from code enforcement.
FIRE-Final Inspection11/7/200611/8/200611/8/2006APASS
DetailsForrest France
Shell fire life safety inspection is acceptable pending the installation of a visual indicator at the main entry/exit door at the 1st floor lobby south.
PubWorks Occupancy Approval11/6/200611/6/200611/6/2006 DONE
Signed off final 11/03/2006 G. Fitts
FIRE-Final Inspection11/1/200611/2/200611/3/2006PCANC
DetailsForrest France
Life safety final pending project related FIR permit finals.
FIRE-Final Inspection11/2/200611/2/200611/2/2006PCANC
DetailsForrest France
Duplicate inspection request already called in.
Plan assigned to (JCM)5/3/2006 10/31/2006 PASS
10/31/2006 15:52:12 JCM - activity updated through activity BLDA022 from case BLD05-03105.
Routing - PLANNING10/31/2006 10/31/2006 PASS
DR was modified under DRH06-00008 processed by S. Schafer.
Inspection Record Card- Bld  10/31/2006  
PLANS/APPL TAKEN TO FRONT DESK  10/31/2006 DONE
Routing - PLAN CHECK10/31/2006 10/31/2006 PASS
CHANGE STATUS TO (ISS)  10/31/2006  
plan mod - changed status for pickup
(F) Reprint permit  10/31/2006  
BLD-Framing/Rough-in9/19/20069/19/20069/19/2006PPART
DetailsMike Jordan
###-#### - harold. Inspected framing for 1hr stair enclosures and 1hr elevator shaft as wel as framing for corridor upstairs. Needs to provide UL listings from sub cont. for rated penetrations.
Override - Parcel Holds  9/19/2006  
Plan resubmittals received  8/24/2006  
Received letter of transmittal and one copy of page A-5.0
Routing - PLANNING5/15/2006 5/16/2006 FAIL
The conditions of approval required submitall and approval of a staff-level modification to the original DR. Applicant was contacted via fax at 7:30 a.m. CER

Routing - PLAN CHECK5/12/2006 5/15/2006 PASS
Routing - FIRE5/10/2006 5/12/2006 PASS
No modifications to review notes.
Plan Modification Accepted  5/12/2006 DONE
Routing - PLAN CHECK5/9/2006 5/10/2006 PASS
Routing - Erosion and Sediment5/9/2006 5/9/2006 PASS
Already passed with attached conditions.
Routing - PUBLIC WORKS5/8/2006 5/9/2006 PASS
BLD-Foundation5/3/20065/4/20065/4/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/3/2006 at 11:17:51 AM. Contact: ###-####. Reveiwed special insp reports and visually inspected panel to footing connections and panel to panel connections.
Plan Modification Accepted  5/3/2006  
Plan modification accepted for BLD05-03105 for the redesign of adding a drive thru aisle to east side of building on sheets SP-1, C1.01, C1.02, C1.03, C1.05, C1.06, C1.07, L1.00, L1.01, E-1.0.
Routed to John Menard
BLD-Concrete3/8/20063/8/20063/8/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/8/2006 at 7:49:13 AM. Contact: ###-####. Tilt panels. wip
BLD-Footing2/22/20062/23/20062/23/2006APART
DetailsMike Jordan
gary jones; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. NE footing line.
BLD-Footing2/13/20062/14/20062/14/2006APART
DetailsMike Jordan
Gary; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Perimeter stem walls.
Plan resubmittals received  2/2/2006  
Received 2 copies of P1.1 & 1 transmittal letter and taken to Lee Rice
(F) Reprint permit  12/21/2005  
Issue PAID IN FULL permit  12/20/2005 DONE
Permit Ready to Issue  12/14/2005 DONE
Inspection Record Card- Bld  12/14/2005  
Print Occupancy Form  12/14/2005 DONE
Telephone call  12/14/2005 DONE
Left voice message for David Rudeen or Robert Hess that permit is ready & fees///12/14/05 @9:15am BAS
Plan resubmittals received  12/13/2005 DONE
Received 1 transmittal , & 3 copys of sheets S-3.1,S-3.2,S-3.3 Taken to John M.
PLANS/APPL TAKEN TO FRONT DESK  12/13/2005 DONE
Plan assigned to (JCM)11/7/2005 12/13/2005 PASS
12/13/2005 14:33:47 JCM - activity updated through activity BLDA022 from case BLD05-03105.
Routing - PLAN CHECK12/8/2005 12/13/2005 PASS
Plan resubmittals requested  12/9/2005 DONE
E-mailed the architect requesting snow load revisions to the structural plans. JCM
Plan resubmittals received  12/8/2005 DONE
Received 3 copies of replacement structural sheets S-0.2 and S-2.1 and forwarded them to John M.
1st review completed  12/8/2005 FAIL
Failed structural review
Plan resubmittals received  12/7/2005 DONE
Received response letter from architect, response letter from structural engineer, 3 sets of revised structural calcs, and 3 copies of plan sheets S-0.2, S-2.1, S-3.1, S-3.2, S-3.3, S-4.1, S-5.2, S-5.3, S-7.1, S-7.3, S-8.1, S-8.2, S-8.3, S-8.4, S-8.5, S-8.6, and S-8.7 and forwarded to John M.
Routing - FIRE11/28/2005 12/7/2005 PASS
Routed to FV 12/1/05
Routing - PLAN CHECK11/25/2005 11/28/2005 PASS
Routing - PLANNING11/22/2005 11/25/2005 PASS
Approved per DRH05-00314.
Routing - PLUMBING11/18/2005 11/22/2005 PASS
per plans and 2003 upc
Plan resubmittals requested  11/21/2005 DONE
E-mailed the architect a copy of the structural plan review requesting revisions. JCM
Routing Off Site - STRUCTURAL11/7/2005 11/21/2005 FAIL
Received an e-mailed comment list from the consulting structural engieer requesting revisions. JCM
Routing - Erosion and Sediment11/17/2005 11/18/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS11/14/2005 11/17/2005 PASS
Plan Reviewer's activity  11/15/2005 PASS
Plans reviewed and approved with red lined notes and attached comment list. JCM
Routing - PLANNING Land Div11/7/2005 11/14/2005 PASS
ROS_6190 approved on 6/17/03.
Plans ACCEPTED BY PLAN TECH  11/7/2005  
Plan routing begun/NEW & ADDTN  11/7/2005  
Application received  11/4/2005  
Recd Pcfee & Taken To Pln CK  11/4/2005  
Fee Review-notes11/4/200511/4/2005