BLD-Final | 2/3/2006 | 2/3/2006 | 2/3/2006 | A | PASS |
Tony Young
|
|
|
the plans for the project are in a plastic cover of a saw blade on the back patio by the sliding glass door of the hot tub.; Phone #: ###-#### Internet Inspection Request from: Jeff Ware existing spiral stairway was not modified,, stays like it was,, not to todays code,, deck is fine and passes
|
DOC - Permit Finaled | 2/3/2006 | 2/3/2006 | 2/3/2006 | P | PASS |
Tony Young
|
|
|
|
BLD-Conference | 11/28/2005 | 11/29/2005 | 11/29/2005 | P | PASS |
Tony Young
|
|
|
Tony, I would like to have you look at out post and beam connections to verify eveything will work so we can begin to lay our decking and start the trim work for the posts and beams. Thank you, Jeff Ware ###-####; Phone #: ###-#### Internet Inspection Request from: Jeff Ware \hardware ok
|
BLD-Footing | 11/19/2005 | 11/21/2005 | 11/21/2005 | A | PART |
Tony Young
|
|
|
Tony,; Phone #: ###-#### Internet Inspection Request from: Jeff Ware
|
PubWorks Subgrade Approval | 11/18/2005 | 11/18/2005 | 11/18/2005 | | DONE |
|
|
|
Footing subgrade approved as follows:
-4 easternmost footings are acceptable
-westernmost footing must be excavated to 5.5 feet below grade, tamped, and have a minimum 2 foot diameter footing
|
Issue PAID IN FULL permit | | | 11/9/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2005 | | DONE |
|
|
|
Left voice message for Jeff that permit is ready & fees///11/8/05 12:25pm BAS
|
Case Summary (BLD) | | | 11/7/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2005 | | DONE |
|
|
|
|
Application received | | | 11/7/2005 | | |
|
|
|
|
Plan assigned to (PEP) | 11/7/2005 | | 11/7/2005 | | PASS |
|
|
|
11/7/2005 11:30:34 PEP - activity updated through activity BLDA022 from case BLD05-03110.
|
Routing - Erosion and Sediment | 11/7/2005 | | 11/7/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 11/7/2005 | | | | |
|
|
|
|
Routing - Erosion and Sediment | 11/7/2005 | | | | |
|
|
|
ESC plan waiver requesc
|