BLD-Final | 9/19/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Jim Sly
|
|
|
call atleast 1/2 before to meet for access// Brent Phone #: ###-####
|
DOC - Permit Finaled | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Jim Sly
|
|
|
|
Meeting | | | 9/19/2018 | | DONE |
|
|
|
Per Bob A. reopen permit for 1 hr admin fee and schedule final insp
|
CHANGE STATUS TO (ISS) | | | 9/19/2018 | | DONE |
|
|
|
|
BLD-Foundation | 11/23/2005 | 11/28/2005 | 11/28/2005 | A | PASS |
Jim Sly
|
|
|
foundation wall insp///phill; Phone #: 9###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | PART |
Mike Jordan
|
|
|
phil -- pouring at 12
|
Plan assigned to (SAM) | 11/7/2005 | 11/18/2005 | 11/22/2005 | | PASS |
|
|
|
11/22/2005 09:39:44 SAM - activity updated through activity BLDA022 from case BLD05-03112.
|
Case Summary (BLD) | | | 11/22/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/21/2005 | | 11/22/2005 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 11/22/2005 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/22/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/17/2005 | | 11/18/2005 | | FAIL |
|
|
|
I need a typical wall section, plan view and roof framing plan of garage along with a foundation plan for the manufactured home. I routed to Evelyn for dimension verification on lot / house.
|
Routing - PUBLIC WORKS | 11/16/2005 | | 11/17/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 11/16/2005 | | 11/16/2005 | | PASS |
|
|
|
site plan approved as noted for rear yard setback - storage area between house and garage to be adjusted accordingly. eeg. 11/21 after additional review for rear yard setback - 15' rear yard shall be maintained.
|
Application received | | | 11/7/2005 | | |
|
|
|
|
Routing - PLANNING | 11/7/2005 | | | | FAIL |
|
|
|
11/08 records show existing home on parcel -no record of house removal. Rear yard setback needs to be 15'. called applicant and left detailed message. eeg.
|